USPTO serial 79216573
LET'S WRITE THE FUTURE
Reviewed by CopyMark Law Group
Reg. 5986633Status 709
- Filing date
- Status date
- Registration date
- Feb 18, 2020
- Examiner
- CARLYLE, SHAUNIA P
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with LET'S WRITE THE FUTURE?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jeannine Rittenhouse
Jeannine Rittenhouse IpHorgan Ltd.195 Arlington Heights RoadSuite 125Buffalo Grove, IL 60089Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Automated machine tools as well as their parts, namely, drives for motors, drives for vacuum pumps, gear drives; engines not for land vehicles, drives for machines and hydraulic engines other than engines for land vehicles; machine couplings and transmission devices for power transmission in the nature of transmissions and transmission components, except for land vehicles; electric generators and current generators, wind turbine generators; apparatus for handling and transporting, namely, conveyors, cranes and hoists; transport and handling belts for machines; mechanical and electronic control devices for machines or motors, namely, pneumatic and hydraulic controls for ship motors; pneumatic controls for motors; industrial robots; turbocompressors; electric pumps; compressors for machines; machines, namely, mills for industrial purposes; floating or non-floating drilling rigs; elevator control devices, namely, elevator belts | SECTION 71 - CANCELLED | — |
| 009 | Scientific, nautical, surveying, optical, weighing, measuring, analyzing, indicating, signaling, checking apparatus, instruments and devices, namely, timers for recording and measuring electric currents, ammeters, volt meters, control and protective equipment for electrical networks in the nature of surge protectors, and electronic controls for machines, motors and engines, including parts for all the aforementioned goods; emergency rescue and teaching apparatus and instruments, namely, fire alarms, anti-intrusion alarms, theft alarms, personal security alarms, and emergency warning lamps; apparatus and instruments for conveying, distributing, transforming, storing, regulating or controlling electric current, including parts for all the aforementioned goods; data processing equipment, namely, optical couplers and computers; software for building automation systems; building automation equipment, namely, electric actuators, electric controllers, electric control panels, electronic control circuit cards; computer software for controlling light, sound, ventilating, air conditioning and cooling installations, safety and security systems, household appliances, computer network apparatus; computer software applications for the internet of things in the nature of applications for connecting the controlled devices to each other and to the internet so the devices are able to transmit and receive data; computer software for building automation systems; computer software and hardware for wirelessly connecting devices, electronic apparatus and systems to smart devices for remote monitoring and control; computer software platform for the optimization of assets, industrial automation, machine diagnosis, and the optimization of administrative processes in industry, healthcare, manufacturing and infrastructure; computer software for collation and distribution of data in computer networks for data communication between application programs, consumer devices and industrial apparatus; computer software for the communication of data between application programs, consumer devices and industrial devices; computer application software for mobile phones and handheld computers for connecting, operating, integrating, controlling, and managing networked consumer electronic devices and internet of things electronic devices that are connected to each other and the internet so that the devices are able to transmit and receive data; downloadable mobile applications for connecting, operating, integrating, controlling, and managing networked consumer electronic devices and internet of things electronic devices that are connected to each other and the internet so that the devices are able to transmit and receive data; computer application software for mobile phones and handheld computers for managing internet of things communications and interactions, namely, data transmitted and received between the foregoing devices via the internet; downloadable mobile applications for managing internet of things communications and interactions, namely, data transmitted and received between controlled devices via the internet; downloadable mobile applications for controlling building automation systems consisting of heating, air conditioning, ventilating, energy, lighting, fire alarm and safety access, and computer software for controlling building automation systems consisting of heating, air conditioning, ventilating, energy, lighting, fire alarm and safety access; software for the control of electricity generating power plants, industrial plants, buildings, and networks for the transport of electric energy, gas and oil; computer software and hardware for wireless connection of electronic equipment, systems and apparatus with smart devices in the nature of mobile phones and portable computers that are connected to the internet for remote monitoring and control of the foregoing electronic equipment, systems and apparatus; software platforms for installation optimization, industrial automation, machine diagnostics and for optimization of management processes in the fields of industry, healthcare, manufacture and infrastructure; computer software for collation and distribution of data in computer networks for data communication between application programs, consumer devices and industrial apparatus; downloadable cloud computing software for information management, data capture and data analysis in the fields of assets, installation optimization, industrial automation, machine diagnostics and for optimization of management processes in the fields of industry, healthcare, manufacture and infrastructure; downloadable software for information management, data capture and data analysis in the fields of installation optimization, optimization of assets, industrial automation, machine diagnostics and for optimization of management and administrative processes in the fields of industry, healthcare, manufacture and infrastructure; downloadable software applications for information management, data capture and data analysis in the fields of installation optimization, optimization of assets, industrial automation, machine diagnostics and for optimization of management and administrative processes in the fields of industry, healthcare, manufacture and infrastructure; computer software for recording of data which comes from machine-generated and manually produced data sets; computer software for monitoring and control of communication between computers in automated machine systems; microprocessors; lasers not for medical use; chargers for electric storage batteries; timer switches, namely, timers for recording and measuring electric currents; condensers; electric collectors, namely, photovoltaic cells; electrical terminals boxes; electric wires, power lines and cables; accumulator boxes and electrical connection boxes; cable identification sheaths for electrical transmission lines and cable identification yarns for electrical transmission lines; cable ducts in the nature of electrical ducts; electrical inductors; magnetic recording media, namely, namely, blank magnetic data carriers; semi-conductors; electric and electronic apparatus, devices, namely, namely, photovoltaic solar modules, solar panels for production of electricity, for storage of energy in batteries, and solar panel control instruments, including parts thereof for the production of alternative energy by photovoltaic means; fuel cells; blank electronic, magnetic and optical storage, floppy disks, magnetic disks, and optical disks; computer peripheral devices; current and voltage inverters; current and voltage rectifiers; current converters; electrical connection parts; junction sleeves for electric cables; transistors, thyristors, electric diodes; semiconductor power elements; electrical transformers; electric resistances; electric distribution panels and cabinets; batteries; electronic integrated switching circuits chips; printed circuit boards; diagnostic apparatus, namely, diagnostic apparatus for testing electrical systems; anti-interference devices, namely, filters for radio interference suppression; electronic memories for apparatus for data processing; electric switching and distribution installations, in particular boards and switch desks, cables and push buttons; power switches; electric relays; modems; connectors for electrical transmission lines, namely, connectors for electronic circuits, power connectors, electrical connector housings; connection sleeves, namely, wire connectors, electric connections and connectors, and electrical and electronic connectors; electric measuring and regulating apparatus in the form of voltage regulators; sensors, namely, electric sensors, current sensors, voltage sensors and sensors for determining position, velocity, acceleration and temperature; fuses and electrical safety devices, surge protectors, voltage surge suppressors, electrical surge arrestors, circuit breakers and circuit closers, circuit overload protector devices and switchgears; electric current switches; electric power distribution installations; voltmeters; electric and electronic installations for the remote control of automated industrial processes; automatic steering devices for vehicles, namely, simulators for the steering and control of vehicles; apparatus and installations for the transmission, distribution and control of electric current, included in this class; heavy current circuits; aerial cables for heavy currents; transformers; electric sockets and plugs; solar cells | SECTION 71 - CANCELLED | — |
| 011 | Apparatus for lighting, apparatus for heating, cooling and ventilation, namely, heating installations, cooling equipment, namely, air cooling apparatus, cooling installations for water and air-conditioning, air cooling and ventilation equipment, namely, ventilation apparatus and instruments; sanitary installations in the nature of steam rooms; ventilation systems comprised primarily of ventilating exhaust fans, ventilating louvers, and ventilation doors; ventilation units for commercial food preparation and food serving; ventilating fans for commercial and industrial use; air-conditioning installations; apparatus for steam generation, cooking, drying, ventilation and water distribution, namely, steam generators; cooktops and cooking tunnels, ovens, namely, induction ovens, microwave ovens, cooking ovens, convection ovens; industrial dryers for heating and dehumidifying; apparatus for water distribution, namely, metered valves and pressure regulators for water installations; solar collectors; heat pumps; industrial cooking ovens | SECTION 71 - CANCELLED | — |
| 012 | Land vehicles; apparatus for locomotion by land, air or water, namely, funicular railway cars and carriages, fork lift trucks, locomotives, motor coaches, trams, railway coaches, railway cars, railcars, trolley buses, cable cars, airplanes, automobiles, automatic guided vehicles, ships, tankers, boats, and marine vehicles in the nature of run-abouts; steering gear for ships; aeronautical apparatus, machines and devices, namely, aircraft, space vehicles, drones, and unmanned aerial vehicles; driving motors for land vehicles, particularly for rail vehicles | SECTION 71 - CANCELLED | — |
| 037 | Building construction, construction of gas treatment plants, oil processing plants, oil pumping stations, offshore oil and gas production installations, gas compressor stations, oil refineries and petrochemical plants; Building repair, repair of gas treatment plants, oil processing plants, oil pumping stations, offshore oil and gas production installations, gas compressor stations, oil refineries and petrochemical plants; Installation of electrical systems, solar energy based power plants, and heating, ventilating and air conditioning systems; installation of computer networking hardware and computer hardware; installation of electrical installations, control systems, automation systems, power plants, oil and gas installations, machines and machine tools, heating, ventilating, air conditioning installations and computer hardware, installation of gas treatment plants, oil processing plants, oil pumping stations, offshore oil and gas production installations, gas compressor stations, oil refineries and petrochemical plants; Installation and maintenance in the field of electrical systems, electrical control systems, building automation systems, power plants, oil and gas equipment, machines and machine tools, computer hardware and heating, ventilating, and air conditioning systems; installation, maintenance and repair of computer hardware and office machines; installation, setting up, maintenance and repair of computer hardware and office machines; maintenance of computer hardware, particularly computers and computer network installations; maintenance of equipment in the field of power plant optimization; installation and maintenance of electrical systems, control systems, automation systems, power stations, oil and gas equipment, industrial machines and machine tools, heating, ventilation and air-conditioning systems and computer hardware, as well as related technical consultancy services; maintenance services for the optimization of power plants; plant construction, maintenance and construction project management services for businesses in the energy production and transmission sector; construction of turnkey ready oil, gas and petrochemical buildings and structures; repair, maintenance and installation of machinery and machine tools for industrial installations; consultancy in relation to repair and installation work, namely, technical consultancy in relation to installation, repair and maintenance of electric or electronic equipment, installations and apparatus in automated or semi-automated industrial operations and consultancy in the fields of all of the aforesaid services; Construction planning; servicing, commissioning and maintenance as well as installation works particularly for industrial installations, namely, machinery and machine tools for industrial installations; repair, maintenance and installation of machines and machine tools for industrial installations; installation, implementation, maintenance and repair of computer hardware and office machines; maintenance of computer hardware, particularly computers and computer network installations; installation, maintenance, repair and modification services for the purpose of noise suppression of industrial machines and apparatus and electrical noise suppression machine installations, and apparatus and electrical installations and maintenance in the field of power plant optimization; installation and maintenance of oil pipelines; underwater construction; consultancy in connection with all the aforesaid services | SECTION 71 - CANCELLED | — |
| 042 | Scientific research and industrial research in the fields of mechanical engineering, machines and machine tools, power plants, electricity generation, energy efficiency, energy saving and environmental protection; programming of computer programs for data processing; providing temporary use of non-downloadable computer programs for controlling electricity generating power plants, industrial plants, buildings and networks for the transport of electric energy, gas and oil in data networks, in particular on the Internet and the World Wide Web; Technical consulting in the field of the installation, maintenance, and repair of computer software; testing of materials; services provided by an industrial designer; services provided by a packaging designer; quality control for others; underwater exploration; testing of raw materials; Engineering consultancy services related to the environmental impact of air pollution, oil-field exploitation, oil-field exploration, underwater exploration, power plants, industrial plants, electricity generation, building construction, gas treatment plants, oil processing plants, oil pumping stations, offshore oil and gas production installations, gas compressor stations, oil refineries, petrochemical plants, solar energy based power plants, wind turbine generators, and wind-energy based power plants, engineering consultancy services related to the environmental compatibility of air pollution, oil-field exploitation, oil-field exploration, underwater exploration, power plants, industrial plants, electricity generation, building construction, gas treatment plants, oil processing plants, oil pumping stations, offshore oil and gas production installations, gas compressor stations, oil refineries, petrochemical plants, solar energy based power plants, wind turbine generators, and wind-energy based power plants, advice in the field of energy saving, providing technical advice in connection with energy-saving measures, services provided by technical advisers in the field of energy saving and energy performance; computer software design, particularly in the field of computer security; network engineers' services including computer and network security consulting; scientific and industrial research in the field of network technology; software updating; carrying out chemical analyses; oil prospecting; oil-well testing; preparation of analyses for oil-field exploitation; oilfield surveys; physics research; chemical research; computer consulting services, particularly in the field of technical computer security; reconstitution of computer data, namely, recovery of computer data; software maintenance; computer system analyses; research and development services for new products; research in the field of machine construction and engineering; technical surveys; engineering work, namely, advice provided by engineers, particularly consultation in the field of technical computer security; construction drafting; technical project studies, namely, technical project planning, namely, design engineering as well as the related consulting; rental of software and data processing apparatus; software development; services provided by an engineer, namely, engineering design services; engineering services in the field of the optimization of electric power stations; engineering services and technical and technological consultancy services relating thereto in the field of energy for owners and operators of industrial, commercial and governmental facilities; engineering services and technical and technological consultancy services in the field of the measurement and monitoring of energy to improve energy efficiency for owners and operators of industrial, commercial and governmental facilities | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by ABB Asea Brown Boveri Ltd
- Other trademarks owned by ABB Asea Brown Boveri Ltd
- Other trademarks owned by ABB Asea Brown Boveri Ltd
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 011
- Other trademarks in Class 012
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named LET'S WRITE THE FUTURE
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 4, 2026 | C71T | CANCELLED SECTION 71 | — |
| Apr 16, 2026 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Feb 18, 2025 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Jul 3, 2020 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jun 16, 2020 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jun 15, 2020 | FIMP | FINAL DISPOSITION PROCESSED | — |
| May 18, 2020 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| May 15, 2020 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Feb 18, 2020 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Dec 3, 2019 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Dec 3, 2019 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 13, 2019 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Nov 13, 2019 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Nov 13, 2019 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Oct 28, 2019 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Oct 24, 2019 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 17, 2019 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Oct 17, 2019 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Oct 17, 2019 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Oct 17, 2019 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Apr 23, 2019 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 23, 2019 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 23, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 2, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 1, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 1, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 8, 2019 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Feb 20, 2019 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Feb 20, 2019 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Oct 2, 2018 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 2, 2018 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 2, 2018 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 2, 2018 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Sep 25, 2018 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Sep 6, 2018 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 29, 2018 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Aug 28, 2018 | ALIE | ASSIGNED TO LIE | — |
| Aug 28, 2018 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Aug 28, 2018 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Aug 28, 2018 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Aug 24, 2018 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 24, 2018 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 24, 2018 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 24, 2018 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Aug 7, 2018 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Jul 19, 2018 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 28, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 27, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 27, 2018 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 27, 2018 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 27, 2018 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 27, 2018 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 11, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 11, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 11, 2018 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 10, 2018 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 10, 2018 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Nov 6, 2017 | RFNP | REFUSAL PROCESSED BY IB | — |
| Oct 12, 2017 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Oct 12, 2017 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Oct 11, 2017 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 10, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 4, 2017 | RFWR | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW | — |
| Oct 3, 2017 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 2, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 29, 2017 | RFWR | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW | — |
| Sep 28, 2017 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Sep 27, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 27, 2017 | RFWR | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW | — |
| Sep 24, 2017 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Sep 23, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 20, 2017 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Sep 16, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 16, 2017 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Sep 14, 2017 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |