Drawing for ELSO

USPTO serial 79216613

ELSO

Reviewed by CopyMark Law Group

Reg. 5552714Status 739Registered
Filing date
Status date
Registration date
Sep 4, 2018
Examiner
BILLINGS, JOHN T
Law office
Historical data usage

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with ELSO?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Daniel J. Hudak, Jr.

Daniel J. Hudak, Jr. HUDAK, SHUNK & FARINE CO. LPA30B Northwest Ave., Suite 210Tallmadge, OH 44278United States

Goods and services

ClassDescriptionStatusFirst use
007Transmission shafts, couplings and joints other than for land vehicles, namely, articulated shafts, intermediate articulated shafts and Cardan joints for use with machines, in particular, single and double articulated shafts, Cardan, ball and spider shafts with or without telescopic extensions as well as similar transmission shafts with or without quick coupling system; spare parts, replacement parts and accessories for the transmission shafts, couplings and joints other than for land vehicles, in particular, brackets as fittings, solder jaw joints, telescopic shaft joints and telescopic joints, screw-in fittings for flanges, and counter flanges; grooved shafts and hubs for use with machines being cam shafts; transmission shafts other than for land vehicles, shaft couplings not for land vehicles, shaft couplings as parts of machines [ ; machines for working metal, wood and plastics as well as machines for the packaging, construction, printing, electrical, paper and textile industries, in particular, filling machines, excavators being earth moving machines, construction machines, namely, concrete construction machines, backhoes being earth moving machines, graders being earth moving machines, skid-steer loaders, printing machines, power generators, namely, emergency power generators, gas and fuel operated power generators, portable electric power generators, wind-powered electricity generators, mechanical lifts, paper machines, namely, paper box making machines, paper shredding machines, paper coating machines, paper cutting machines, paper bag making machines, mechanical presses for metal and woodworking, machines for the textile industry, namely, textile making-up machines, textile washing machines, textile tentering machines, textile bonding machines, packaging machines and rolling mills; machine tools, namely, taps, lathes, chasers, gear cutters, and thread milling cutters ]ACTIVE—
012Transmission shafts, couplings and joints for vehicles, namely, articulated shafts, intermediate articulated shafts and Cardan transmission shafts and joints, in particular, single and double articulated shafts, Cardan, ball and spider shafts with or without telescopic extensions as well as similar transmission shafts with or without quick coupling system; spare parts, replacement parts and accessories for the shafts and transmissions for land vehicles, in particular, brackets as fittings, screw-in fittings for flanges and counter flanges; grooved shafts and hubs, namely, drive shafts for land vehicles, transmission shafts for land vehicles, Cardan shafts for land vehicles, and shaft couplings for land vehiclesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 23, 2026INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Jul 1, 2026INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Jul 1, 2026INPCINVALIDATION PROCESSED—
Dec 8, 2025INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Apr 8, 2025NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Apr 8, 2025C75AREGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK.—
Apr 7, 2025APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Nov 20, 2024ES75TEAS SECTION 71 & 15 RECEIVED—
Jan 5, 2019FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Dec 15, 2018FICSFINAL DISPOSITION NOTICE SENT TO IB—
Dec 15, 2018FIMPFINAL DISPOSITION PROCESSED—
Dec 4, 2018FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Sep 4, 2018R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 19, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 15, 2018GPNXNOTIFICATION PROCESSED BY IB—
May 30, 2018OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
May 30, 2018OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
May 30, 2018NPUBNOTICE OF PUBLICATION—
May 11, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 3, 2018CNEAEXAMINERS AMENDMENT MAILED—
May 3, 2018XAECEXAMINER'S AMENDMENT ENTERED—
May 3, 2018CNEAEXAMINERS AMENDMENT -WRITTEN—
May 3, 2018ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Apr 24, 2018PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Apr 6, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 20, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 20, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 16, 2018ALIEASSIGNED TO LIE—
Mar 5, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 3, 2017RFNTREFUSAL PROCESSED BY IB—
Oct 13, 2017RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Oct 13, 2017RFRRREFUSAL PROCESSED BY MPU—
Oct 11, 2017RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Oct 10, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 4, 2017DOCKASSIGNED TO EXAMINER—
Sep 20, 2017MAFRAPPLICATION FILING RECEIPT MAILED—
Sep 16, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 15, 2017LIMILIMITATION FROM ORIGINAL APPLICATION ENTERED—
Sep 14, 2017SDRCSN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB—

Frequently asked questions

Related guidance