USPTO serial 79216868
HAFFNER ENERGY
Reviewed by CopyMark Law Group
Reg. 5946627Status 709
- Filing date
- Status date
- Registration date
- Dec 31, 2019
- Examiner
- SINGH, TEJBIR
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with HAFFNER ENERGY?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
FR
FR
FR
FR
FR
FR
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 004 | Biofuels, namely, syngas and hydrogen-based fuels; electrical energy; solidified hydrogen-based fuel gas | SECTION 71 - CANCELLED | — |
| 007 | Machines, namely, feeding apparatus for biomass boilers, namely, boilers that use organic matter to produce syngas and hydrogen-based fuels; machines, namely, scale collectors for biomass boilers, namely, boilers that use organic matter to produce syngas and hydrogen-based fuels; mechanical smoke condensing installations; high energy chargers being parts of gas production machines; steam condensers as parts of machines; steam/oil separators; heat exchangers being parts of machines for use in industrial-scale power plants; filters being parts of machines, motors and engines for filtering gases for use in industrial-scale power plants; electricity generators; mechanical smoke condensing installations; dust exhausting installations for cleaning purposes; suction machines for industrial use; pressure regulators being parts of machines; separators, namely, dust separators; blowing machines for the compression, exhaustion and transport of gases; superheaters in the nature of steam engine boilers for use in industrial-scale power plants; high energy chargers being parts of gas production machines | SECTION 71 - CANCELLED | — |
| 011 | Pressure regulators for water and gas installations; heat accumulators for use in industrial-scale power plants; steam accumulators; heating apparatus for solid, liquid or gaseous fuels for use in industrial-scale power plants, namely, heating apparatus for the production of syngas and hydrogen-based fuels; gas scrubbing apparatus; heating installations, namely, burners, boilers and heaters that use organic matter to produce syngas and hydrogen-based fuels; refining towers for distillation; heat exchangers for use in industrial-scale power plants not being parts of machines; heating boilers and oil and gas burners for the chemical treatment of organic matter used to produce syngas and hydrogen-based fuels through heating; heating equipment, namely, heaters of organic matter used to produce syngas and hydrogen-based fuels; evaporators to separate vapor from dry matter; biomass ovens, other than for laboratory use; heating boiler hearths for industrial-scale power plants; steam heating boilers for use in industrial-scale power plants other than machine parts; incinerators for use in industrial-scale power plants; automatic ash conveyor installations in the nature of conveyor belts designed to remove ash automatically from the boiler for use in industrial-scale power plants; hot water heating installations for use in industrial-scale power plants; industrial treatment installations, namely, heating installations for use in industrial-scale power plants for the treatment of biomass; gas scrubbers as parts of gas installations; refining towers for distillation | SECTION 71 - CANCELLED | — |
| 037 | Construction consultation in the construction of industrial-scale power plants; construction of industrial-scale plants that produce the organic matter to produce electricity, syngas and hydrogen-based fuels; industrial installations, namely, construction of plants and installations for electricity and syngas and hydrogen-based fuels; burner maintenance and repair in industrial scale power plants that use organic matter to produce electricity, syngas and hydrogen-based fuels; maintenance and repair of solid, liquid or gaseous combustion heating apparatus in industrial scale power plants that use organic matter to produce electricity, syngas and hydrogen-based fuels; maintenance and repair of industrial heating equipment at industrial scale plants that produce electricity, syngas and hydrogen-based fuels; construction information in the field of industrial-scale power plant construction; information relating to the repair of installations for electricity syngas and hydrogen-based fuels production; heating equipment installation and repair in industrial scale plants that produce electricity, syngas and hydrogen-based fuels; furnace installation and repair in industrial scale plants that produce electricity, syngas and hydrogen-based fuels; irrigation devices installation and repair; installation and repair of devices for production, collection and distribution of syngas and hydrogen-based fuels; installation and repair of refrigerating apparatus for industrial purposes; cleaning and repair of industrial boilers used in industrial-scale plants that produce electricity, syngas and hydrogen-based fuels; building construction supervision in the field of industrial scale power plants; none of the aforesaid services being for homes, household equipment or vehicles | SECTION 71 - CANCELLED | — |
| 040 | Rental of boilers that use organic matter to produce syngas and hydrogen-based fuels; destruction of waste and trash; production of energy; rental of generators; biomass gas refining services; recycling of trash and waste; waste processing, namely, waste treatment and sorting of waste and of recoverable raw materials; recycling of waste | SECTION 71 - CANCELLED | — |
| 042 | Architectural services for industrial scale power plants; architectural consultancy for industrial scale power plants; energy auditing in industrial scale power plants; scientific information and advice to reduce energy consumption in industrial scale power plants; technological consulting services in the field of energy production using organic matter to produce electricity, syngas and hydrogen-based fuels; quality control in the field of the production of syngas and hydrogen-based fuels; surveying, namely, engineering work in the construction of industrial-scaled power plants; scientific information and advice on carbon offsetting in the field of the production of syngas and hydrogen-based fuels; engineering; construction drafting services for industrial scale power plants and production of syngas and hydrogen-based fuels; research and development of new products for other industrial-scale power plants and production of syngas and hydrogen-based fuels; technical research in the field of the processing of organic matter to produce electricity, syngas and hydrogen-based fuels; physics research; mechanical research; biological research services; environmental protection-related research; none of the aforesaid services being for homes, household equipment or vehicles | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by HAFFNER ENERGY
- Other trademarks owned by HAFFNER ENERGY
- Other trademarks owned by HAFFNER ENERGY
- Other trademarks owned by HAFFNER ENERGY
- Other trademarks owned by HAFFNER ENERGY
- Other trademarks owned by HAFFNER ENERGY
- Other trademarks in Class 004
- Other trademarks in Class 007
- Other trademarks in Class 011
- Other trademarks in Class 037
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named HAFFNER ENERGY
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 17, 2026 | C71T | CANCELLED SECTION 71 | — |
| Dec 31, 2024 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Apr 16, 2022 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| May 1, 2020 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Apr 13, 2020 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Apr 13, 2020 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Mar 31, 2020 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Dec 31, 2019 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Nov 22, 2019 | TMBN | TTAB RELEASE CASE TO TRADEMARKS | — |
| Nov 22, 2019 | OP.T | OPPOSITION TERMINATED NO. 999999 | — |
| Nov 22, 2019 | OP.D | OPPOSITION DISMISSED NO. 999999 | — |
| Jul 18, 2019 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jun 18, 2019 | OP.I | OPPOSITION INSTITUTED NO. 999999 | — |
| Jun 14, 2019 | OPNS | OPPOSITION NOTICE (IB REFUSAL) SENT TO IB | — |
| Jun 14, 2019 | OPNC | OPPOSITION NOTICE (IB REFUSAL) CREATED | — |
| Mar 15, 2019 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Feb 27, 2019 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Feb 27, 2019 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Jan 14, 2019 | ETOF | EXTENSION OF TIME TO OPPOSE RECEIVED | — |
| Dec 18, 2018 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Dec 18, 2018 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 15, 2018 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Nov 28, 2018 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Nov 28, 2018 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Nov 28, 2018 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Nov 12, 2018 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 1, 2018 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Nov 1, 2018 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Nov 1, 2018 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Nov 1, 2018 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Nov 1, 2018 | DMCC | DATA MODIFICATION COMPLETED | — |
| Oct 16, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 16, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 9, 2018 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Apr 10, 2018 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Apr 10, 2018 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Apr 10, 2018 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Mar 26, 2018 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Mar 26, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 26, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 26, 2018 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 21, 2017 | RFNT | REFUSAL PROCESSED BY IB | — |
| Oct 4, 2017 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Oct 4, 2017 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Oct 3, 2017 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 2, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 29, 2017 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Sep 25, 2017 | DMCC | DATA MODIFICATION COMPLETED | — |
| Sep 25, 2017 | ALIE | ASSIGNED TO LIE | — |
| Sep 25, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 25, 2017 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Sep 22, 2017 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Sep 21, 2017 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |