USPTO serial 79217623
KRAFTWERK
Reviewed by CopyMark Law Group
Reg. 5624638Status 709
- Filing date
- Status date
- Registration date
- Dec 11, 2018
- Examiner
- MICHOS, JOHN E
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with KRAFTWERK?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
CH
CH
CH
CH
CH
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Electric and pneumatic hand tools, namely, hydraulic jack, hydraulic bottle jack, hydraulic shop press, hydraulic transmission jack, workshop crane, waste oil extractor, air impact wrench, air ratchet, cordless drill, cordless impact wrench, cordless grinder, cordless angle grinder, air die grinder, blow gun; machine tools for automotive and mechanical use, namely, grinders, all of the foregoing excluding scissors and hand-operated sheers, cable, wire and connector crimpers, fiber wire and cable cutters, wire and cable strippers and slitters and screwdrivers and not for use in outside plant utility, telecommunications, power utility and cable television construction | SECTION 71 - CANCELLED | — |
| 008 | Hand-operated tools and implements, namely, wrench, hexagon key wrench, socket, ratchet, torque wrench, pliers, striking tools, hammer, files, chisel, knives, punches, thread tools, pry bar, scraper, precision tools, non-sparking and stainless steel hand-operated tools, namely, callipers, pullers, drills, all of the foregoing excluding scissors and hand-operated sheers, cable, wire and connector crimpers, fiber wire and cable cutters, wire and cable strippers and slitters and screwdrivers and not for use in outside plant utility, telecommunications, power utility and cable television construction | SECTION 71 - CANCELLED | — |
| 011 | Lighting apparatus, namely, lighting installations; electric lamps and battery-powered lamps | SECTION 71 - CANCELLED | — |
| 025 | Work clothing, other than protective clothing, for exclusive use in the control of machines and tools, namely, coveralls, overalls, pants, jackets, vests, coats, bermuda shorts, caps, gloves, t-shirts, polo shirt, parkas, fleece jackets, vests | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Kraftwerk International GmbH
- Other trademarks owned by KRAFTWERK Europe AG
- Other trademarks owned by KRAFTWERK Europe AG
- Other trademarks owned by KRAFTWERK Europe AG
- Other trademarks owned by KRAFTWERK Schweiz AG
- Other trademarks in Class 007
- Other trademarks in Class 008
- Other trademarks in Class 011
- Other trademarks in Class 025
- Similar marks named KRAFTWERK
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Feb 27, 2026 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Feb 27, 2026 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jun 27, 2025 | C71T | CANCELLED SECTION 71 | — |
| Dec 11, 2023 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Sep 1, 2023 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Mar 3, 2023 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Apr 5, 2019 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Mar 19, 2019 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Mar 19, 2019 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Mar 11, 2019 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Feb 1, 2019 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Dec 11, 2018 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 25, 2018 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 25, 2018 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 21, 2018 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Sep 5, 2018 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Sep 5, 2018 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 5, 2018 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Aug 23, 2018 | ALIE | ASSIGNED TO LIE | — |
| Aug 14, 2018 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 14, 2018 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Aug 14, 2018 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Aug 14, 2018 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Aug 14, 2018 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Aug 14, 2018 | ZZBX | ALLOWANCE WITHDRAWN-INADVERTENTLY ISSUED ACTION | — |
| Aug 14, 2018 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 17, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 16, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 16, 2018 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 8, 2018 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 8, 2018 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 8, 2018 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 16, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 16, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 16, 2018 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 4, 2017 | RFNT | REFUSAL PROCESSED BY IB | — |
| Oct 16, 2017 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Oct 16, 2017 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Oct 14, 2017 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Oct 13, 2017 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 12, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 10, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 10, 2017 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 5, 2017 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |