Drawing for RIVERBOX

USPTO serial 79218134

RIVERBOX

Reviewed by CopyMark Law Group

Reg. 5532396Status 709
Filing date
Status date
Registration date
Aug 7, 2018
Examiner
STEDMAN, CORI
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with RIVERBOX?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Mary Margaret L. O'Donnell

Mary Margaret L. O'Donnell Blue Filament Law PLLc700 E. Maple RoadSuite 450Birmingham, MI 48009

Goods and services

ClassDescriptionStatusFirst use
006Construction materials of metal, namely, metallic materials for the construction of aquatic facilities, namely, artificial rivers and ponds; metallic mobile construction for living water composed of movable obstacles made of metal materials, namely, metallic blocks, metal appearing as a rock formation, walls and barriers that direct the flow of water for sporting events; building construction elements made of metal materials, namely, fabricated metal components for the construction of aquatic facilities, namely, artificial rivers and ponds; removable and transportable artificial ponds and rivers made of metal for use in sporting events; water pipes of metal; gutter and drainage pipes of metalSECTION 71 - CANCELLED—
019Non-metallic building materials, namely, non-metallic building materials for construction of aquatic facilities, namely, artificial rivers and ponds; non-metallic mobile constructions for living water composed of movable obstacles made of synthetic materials, namely, non-metallic blocks, faux rock formations, walls and barriers that direct the flow of water for sporting events; concrete building elements for the construction of aquatic facilities, namely, artificial rivers and ponds; polyethylene building elements for construction of aquatic facilities, namely, artificial rivers and ponds; removable and transportable non-metal artificial rivers and basins as an integral component of aquatic facilities construction for use in water sporting events; water pipes not of metal; gutter and drainage pipes, not of metalSECTION 71 - CANCELLED—
037Construction of aquatic facilities, namely, artificial rivers and ponds, featuring removable and transportable, water courses, non-metallic mobile constructions for living water composed of movable obstacles made of synthetic materials, construction elements of concrete and polyethylene building elements; repair, maintenance, reconditioning and servicing of aquatic facilities, namely, in the field of artificial rivers and ponds, non-metallic water courses, non-metallic mobile constructions for living water composed of movable obstacles made of synthetic materials, building elements of concrete and polyethylene building elementsSECTION 71 - CANCELLED—
041Organization of community sporting and cultural activities and events; organization of exhibitions for cultural, educational or sporting purposesSECTION 71 - CANCELLED—
042Conducting engineering feasibility studies, engineering consulting and engineering services in the field of natural or artificial rivers, in particular planning of water courses, artificial ponds, convertible furniture for living water composed of movable obstacles made of synthetic materials, building elements of concrete and polyethylene building elements; technical engineering consulting services in the field of natural or artificial rivers, in particular planning of water courses, artificial ponds, scalable furniture for water with movable obstacles made of synthetic materials, building elements of concrete and polyethylene building elementsSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 7, 2026INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Apr 16, 2026INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Apr 16, 2026INPCINVALIDATION PROCESSED—
Oct 21, 2025INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Feb 21, 2025C71TCANCELLED SECTION 71—
Aug 7, 2023REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Dec 21, 2018FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Nov 29, 2018FICSFINAL DISPOSITION NOTICE SENT TO IB—
Nov 29, 2018FIMPFINAL DISPOSITION PROCESSED—
Nov 19, 2018CORNCORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Nov 7, 2018FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Nov 2, 2018CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Aug 7, 2018R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 2, 2018GPNXNOTIFICATION PROCESSED BY IB—
May 22, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 22, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 16, 2018OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
May 16, 2018OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
May 2, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 13, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 12, 2018XAECEXAMINER'S AMENDMENT ENTERED—
Apr 12, 2018GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Apr 12, 2018GNEAEXAMINERS AMENDMENT E-MAILED—
Apr 12, 2018CNEAEXAMINERS AMENDMENT -WRITTEN—
Apr 12, 2018XAECEXAMINER'S AMENDMENT ENTERED—
Apr 12, 2018GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Apr 12, 2018GNEAEXAMINERS AMENDMENT E-MAILED—
Apr 12, 2018CNEAEXAMINERS AMENDMENT -WRITTEN—
Apr 2, 2018XAECEXAMINER'S AMENDMENT ENTERED—
Apr 2, 2018GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Apr 2, 2018GNEAEXAMINERS AMENDMENT E-MAILED—
Apr 2, 2018CNEAEXAMINERS AMENDMENT -WRITTEN—
Mar 16, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 15, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 15, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 15, 2018ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 15, 2018REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Nov 10, 2017RFNPREFUSAL PROCESSED BY IB—
Oct 20, 2017RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Oct 20, 2017RFRRREFUSAL PROCESSED BY MPU—
Oct 20, 2017MAFRAPPLICATION FILING RECEIPT MAILED—
Oct 18, 2017RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Oct 17, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 16, 2017DOCKASSIGNED TO EXAMINER—
Oct 16, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 12, 2017REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance