Drawing for VESTAS PURE. PERFORMANCE

USPTO serial 79218982

VESTAS PURE. PERFORMANCE

Reviewed by CopyMark Law Group

Reg. 5753847Status 709
Filing date
Status date
Registration date
May 21, 2019
Examiner
FITZSIMONS, MICHAEL R
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with VESTAS PURE. PERFORMANCE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
035Business administration and management services in relation to energy projects, including wind power projects; business administration services in relation to wind power systems during their life cycle and to ensure sustainable and maximum use and exploitation of wind power systems, wind turbines, and groups of wind turbines by forecasting, identifying and solving problems relating to the operation of wind turbines, wind power plants, and groups of wind turbines for the purpose of avoiding and minimizing downtime; collection and processing of data and operation experiences relating to and from wind power systems, including preparation of operation and production statistics and preparation of maintenance plans and fault diagnoses; commercial advisory services relating to exploitation of wind energy, including advice on optimization and prolongation of energy production from wind turbines and about opportunities and solutions for extending the lifetime of wind turbines as well as optimizing the exploitation of wind turbines by upgrading wind turbine components and by enhanced control of the operation of wind turbines as well as by enhanced aerodynamic performances; commercial assistance in connection with optimizing energy production and yield from wind turbines, including assistance in connection with ensuring continued production and yield from wind turbines also beyond expected life timeSECTION 71 - CANCELLED—
037Construction, repair, maintenance, overhaul and upgrading of wind mills, wind power plants and wind turbines; installation, repair, maintenance, overhaul, and upgrading of the structural parts of wind turbines, including overhaul, maintenance and repair of wind turbine blades, gearboxes, generators and transformers, both externally and internally, and of the individual mechanical, electronic, and chemical parts and components of wind turbine blades, gearboxes, generators and transformers; servicing, repair and maintenance of lightning conductor systems for wind turbines; consultancy relating to and information about maintenance and servicing of wind turbines and wind turbine components, including wind turbine blades, gearboxes, generators and transformers for the purpose of ensuring operation and optimal energy yield, including preparation of servicing reports in the nature of control and repair reports with documentation for the state of a wind turbine or wind turbine components; installation, repair, maintenance, overhaul and upgrading of computer hardware for use in connection with the operation of wind mills, wind power plants and wind turbines; installation, repair, maintenance, overhaul and upgrading of security and safety equipment for use in connection with wind mills, wind power plants and wind turbines; consultancy relating to and information about the above-mentioned servicesSECTION 71 - CANCELLED—
042Scientific and technological services, namely, research and development regarding wind energy, wind turbines and wind power plants, including technical analysis, calculations and assessments of and for the improvement of the performance of wind energy and wind turbines; development of new products, processes and concepts aimed at improving the service, maintenance, repair and performance of wind turbines; technological advice and technological assistance in connection with implementing products and processes for optimization and prolongation of energy production from wind turbines, including also 3rd party certification for operation beyond design life time; consultancy and assistance in connection with improved monitoring, operation and control of wind mills, wind turbines and wind power plants and other renewable energy power plants, including remote monitoring, operation and control of wind mills, wind turbines and wind power plants; technical data analysis services and technical inspection services in relation to windmills, wind power plants, wind turbines and other wind-operated machines and their parts and components for purposes of enabling operation beyond their design life time; installation, repair, maintenance, upgrading, overhaul, and inspection of computer software for use in connection with the operation of wind mills, wind power plants and wind turbines; technological consultation in regards to control of the structural parts of wind turbines; technological consultation in regards to control of wind turbine blades, gearboxes, generators and transformers, both externally and internally, and of the individual mechanical, electronic, and chemical parts and components of wind turbine blades, gearboxes, generators and transformers; consultancy relating to and information about the abovementioned servicesSECTION 71 - CANCELLED—
045Information and consultancy services relating to safety in connection with the construction, repair, maintenance, overhaul and upgrading of wind mills, wind power plants, wind turbines and their structural partsSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 5, 2026INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Dec 5, 2025C71TCANCELLED SECTION 71—
May 21, 2024REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Sep 27, 2019FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Sep 10, 2019FICSFINAL DISPOSITION NOTICE SENT TO IB—
Sep 10, 2019FIMPFINAL DISPOSITION PROCESSED—
Aug 21, 2019FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jun 17, 2019TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
May 21, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 5, 2019OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Mar 20, 2019OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 20, 2019OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Mar 5, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 5, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 1, 2019GPNXNOTIFICATION PROCESSED BY IB—
Feb 13, 2019OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Feb 13, 2019OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Feb 13, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jan 25, 2019ALIEASSIGNED TO LIE—
Jan 14, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 10, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 10, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 10, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 10, 2018GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 10, 2018GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 10, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 4, 2018TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jun 4, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 4, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 4, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 23, 2017RFNTREFUSAL PROCESSED BY IB—
Dec 5, 2017RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Dec 5, 2017RFRRREFUSAL PROCESSED BY MPU—
Nov 22, 2017RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Nov 21, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 21, 2017RFWRNON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW—
Nov 8, 2017RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Nov 7, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 31, 2017MAFRAPPLICATION FILING RECEIPT MAILED—
Oct 25, 2017DOCKASSIGNED TO EXAMINER—
Oct 25, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 19, 2017REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance