USPTO serial 79219004
ENERGY CLOUD
Reviewed by CopyMark Law Group
Reg. 5488944Status 709
- Filing date
- Status date
- Registration date
- Jun 12, 2018
- Examiner
- SEVERSON, JUSTIN
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with ENERGY CLOUD?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, electrical connectors, electric current switches, electrical switches, current transformers, electric accumulators, voltage regulators, electric control panels; electric conductors; computers, computer software and computer hardware used for controlling, monitoring and managing power generation and transmission and distribution of electricity; computers, computer software and computer hardware used for transferring, storing, saving, transforming and displaying data and information relating to power generation, power transmission and power distribution; computer software and computer hardware used for controlling, monitoring and managing gas supply distribution and heat supply distribution; computers, computer software and computer hardware used for transferring, storing, saving, transforming and displaying data and information relating to gas supply distribution and heat supply distribution; electronic machines and apparatus, namely, energy meters for tracking and monitoring energy usage, handhelds for exchanging data in energy meters or submeters; power distribution of control machines and apparatus, namely, automatic-switchboards and distribution transformers; analyzing machines and instruments, namely, liquid analyzers, residual gas analyzers; measuring machines and instruments, namely, gas sensors for measuring gas concentration, gasometers; materials for electricity mains, namely, electric wires and cables; electric wires and cables; control devices for saving electrical power; remote monitoring and control devices for power supply distribution, gas supply distribution and heat supply distribution; computerized remote monitoring devices used for monitoring and controlling power, gas and heat supply distribution installations via network communication; control devices for electrical power consumption; devices for remote control and remote monitoring for energy consumption at building equipment | SECTION 71 - CANCELLED | — |
| 037 | Repair and maintenance of power-generating installations, electric transmission installations, power-receiving installations, power-distributing installations and electric substation installations; operating, inspecting and repairing power-generating installations, electric transmission installations and power-distributing installations; providing information relating to remote monitoring of operational situations and conditions of building equipment; installing, repair or maintenance of control devices for saving power; repair or maintenance of power distribution or control machines and apparatus; repair or maintenance of electronic machines and apparatus, namely, energy meters for tracking and monitoring energy usage, handhelds for exchanging data in energy meters or submeters; repair or maintenance of electric communication machines and apparatus; remote monitoring of operational situations and conditions of building equipment for gas and heat distribution; remote monitoring of operational situations and conditions of gas supply plants and heat supply plants; installing, inspecting, maintenance or management of gas equipment of buildings; construction, installation, inspecting, repair or maintenance of gas supply plants; construction or installation of heat supply plants; inspecting, repair or maintenance of heat supply plants; inspecting, repair or maintenance of heat supply equipment of buildings | SECTION 71 - CANCELLED | — |
| 039 | Utility services, namely, storage and distribution of electricity; distribution of electricity using power network; distribution and transmission of electricity; providing information relating to distribution and transmission of electricity; consultancy relating to distribution and transmission of electricity; gas supplying, namely, distribution of gas and providing information and consultancy therefor; heat supplying, namely, distribution of heat and providing information and consultancy therefor | SECTION 71 - CANCELLED | — |
| 042 | Scientific research, scientific studies and testing services in the field of power generation, electric power transmission, electric power distribution and electrical utilization, and providing information relating to aforesaid services; consultancy relating to technological services in the field of power and energy supply; engineering services in the field of power generating plants; engineering services in the field of electricity; architectural services; surveying; designing of machines, apparatus, instruments including their parts or systems composed of such machines, apparatus and instruments; design and design consultancy services for power-generating installations, electric transmission installations, and power-distributing installations; design of electric installations, and electric communication facilities; designing of installations, facilities or equipment composed of power generating machines, power generating devices, power generating equipment, and machines, apparatus, instruments for power distribution; design and maintenance of computer software for controlling, monitoring and managing power generation and power transmission and power distribution; providing temporary use of non-downloadable computer software for controlling, monitoring and managing power generation and power transmission and power distribution; rental of computer systems for controlling, monitoring and managing power generation and power transmission and power distribution; design and maintenance of computer software for transferring, storing, saving, transforming and displaying data and information relating to power generation, power transmission and power distribution; providing temporary use of non-downloadable computer software for transferring, storing, saving, transforming and displaying data and information relating to power generation, power transmission and power distribution; rental of computer systems for transferring, storing, saving, transforming and displaying data and information relating to power generation, power transmission and power distribution; design and maintenance of computer software for controlling, monitoring and managing gas distribution and heat distribution; design and maintenance of computer software for transferring, storing, saving, transforming and displaying data and information relating to gas distribution and heat distribution; providing temporary use of non-downloadable computer software for controlling, monitoring and managing gas distribution and heat distribution; providing temporary use of non-downloadable computer software for transferring, storing, saving, transforming and displaying data and information relating to gas distribution and heat distribution; rental of computer systems for controlling, monitoring and managing gas distribution and heat distribution; rental of computer systems for transferring, storing, saving, transforming and displaying data and information relating to gas distribution and heat distribution; technological consultancy in the field of energy efficiency and energy measurement to improve efficiency; providing information in the field of energy efficiency and improving energy efficiency; design of machines, apparatus, instruments or equipment for energy-efficiency; testing and scientific research on energy-efficiency; testing and scientific research on next generation power networks; design, development or maintenance of computer systems, and monitoring of operational status and conditions of computer systems at power, gas and heat distribution (supply) installations, and facilities having connected line to communication network; monitoring of computer systems, and design, development or maintenance of computer systems; testing and scientific research on reduction of environmental burdens related to energy efficiency; diagnosing, evaluating and analyzing energy consumption at buildings and plants; remote monitoring of computer systems for management of energy and power usage, and efficiency in the use of power and energy; consultation in the field of energy efficiency, namely, controlling energy and power usage, and efficiency in the use of power and energy, and providing information therefor; technological consultancy in the field of energy and power usage, and efficiency in the use of power and energy | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by MITSUBISHI HEAVY INDUSTRIES, LTD.
- Other trademarks owned by MITSUBISHI HEAVY INDUSTRIES, LTD.
- Other trademarks owned by MITSUBISHI HEAVY INDUSTRIES, LTD.
- Other trademarks in Class 009
- Other trademarks in Class 037
- Other trademarks in Class 039
- Other trademarks in Class 042
- Similar marks named ENERGY CLOUD
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Feb 26, 2026 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Feb 12, 2026 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Feb 12, 2026 | INPC | INVALIDATION PROCESSED | — |
| Aug 27, 2025 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Dec 27, 2024 | C71T | CANCELLED SECTION 71 | — |
| Dec 19, 2022 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 12, 2018 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Sep 21, 2018 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Sep 21, 2018 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Sep 12, 2018 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jun 12, 2018 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 8, 2018 | CORN | CORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| May 18, 2018 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| Mar 27, 2018 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 7, 2018 | NPUB | NOTICE OF PUBLICATION | — |
| Feb 16, 2018 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 26, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 26, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 26, 2018 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 25, 2017 | RFNT | REFUSAL PROCESSED BY IB | — |
| Nov 9, 2017 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Nov 9, 2017 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Nov 2, 2017 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Nov 1, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 31, 2017 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Oct 25, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 25, 2017 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 20, 2017 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Oct 19, 2017 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |