Drawing for DUNGS

USPTO serial 79219863

DUNGS

Reviewed by CopyMark Law Group

Reg. 5724200Status 739Registered
Filing date
Status date
Registration date
Apr 16, 2019
Examiner
ROSSMAN, WILLIAM M
Law office
Historical data usage

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with DUNGS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Steven A. Abreu

Steven A. Abreu Abreu Karol LLC770 Legacy Place, 2nd FloorDedham, MA 02026United States

Goods and services

ClassDescriptionStatusFirst use
006Pipes and tubes of metal not for electric purposes; non-electric cables and wires of common metal; valves of metal, other than parts of machinesACTIVE—
007Valves as parts of machines; pressure valves as parts of machines; hydraulic valves for machines; pressure regulating valves for machines; ball valves as parts of machines; hydraulic filters and oil filters as parts of machines or enginesACTIVE—
009Switching, regulating, measuring, control and safety apparatus for heating and air-conditioning installations, industrial installations, furnace installations, gas motors and engines and turbine installations as well as for generation and supply of process heat for industrial installations, in particular automatic valves, automatic fire instruments, namely, automatic burner controls, burner management systems, gas mixing equipment, namely, fan, air/gas mixing plate, multifunctional gas control, zero-pressure regulator; structural parts and accessories for the aforesaid goods, in particular automatic gas firing instruments, namely, automatic burner controls, burner management systems, high voltage ignition apparatus and electronic controls therefore, namely, flame safeguards; solenoid valves as electromagnetic switches; electric switches; electric current regulating apparatus; automatic time switches; pressure sensors; boiler control instruments; switching, regulating, measuring, control- and safety apparatus for heating and air-conditioning installations, industrial installations, furnace installations, gas motors and engines and turbine installations for generating and providing process heatACTIVE—
011Burners; gas safety shut-off valves; air valves for steam heating installations; gas level controlling valves in tanks; regulating accessories for water or gas apparatus and pipes, namely, gas filters, ball valves, safety shut-off valves, pressure switches, pressure regulators, valve proving apparatus, namely, control unit, pressure sensor, pressure switch, pump, automatic burner controls; safety accessories for gas apparatus and pipes, namely, gas filters, ball valves, safety shut-off valves, pressure switches, pressure regulators, valve proving apparatus, namely, control unit, pressure sensor, pressure switch, pump, automatic burner controls; regulating and safety accessories for gas pipes, namely, gas filters, ball valves, safety shut-off valves, pressure switches, pressure regulators, valve proving apparatus, namely, control unit, pressure sensor, pressure switch, pump, automatic burner controls; regulating and safety accessories for gas apparatus, namely, gas filters, ball valves, safety shut-off valves, pressure switches, pressure regulators, valve proving apparatus, namely, control unit, pressure sensor, pressure switch, pump, automatic burner controls; thermostatic valves as parts of heating installationsACTIVE—
037Repair services and installation services in relation to heating systems, valves, switching, regulating, measuring, control and safety devices for heating and air-conditioning systems, industrial systems, firing systems, automatic firing systems, high voltage ignitions, gas engine and turbine systems, electrical control devices; heating equipment installation and repair; machinery installation, maintenance and repair; rebuilding of machines as repairACTIVE—
042Technical research and development of new products for others; engineering; surveying; engineering consultancy in the field of technology; technical project planning, namely, engineering services, particularly for technical project planning; materials testing services for othersACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 22, 2026RNWLINTERNATIONAL REGISTRATION RENEWED—
Dec 9, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Dec 9, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 9, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
May 7, 2025NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
May 7, 2025C75AREGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK.—
May 6, 2025APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jan 13, 2025ES75TEAS SECTION 71 & 15 RECEIVED—
Apr 16, 2024REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Oct 9, 2021NREPNEW REPRESENTATIVE AT IB RECEIVED—
Aug 30, 2019FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Aug 12, 2019FICSFINAL DISPOSITION NOTICE SENT TO IB—
Aug 12, 2019FIMPFINAL DISPOSITION PROCESSED—
Jul 16, 2019FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Apr 19, 2019OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Apr 16, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 3, 2019OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 3, 2019OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Jan 29, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jan 29, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 9, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Dec 20, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 20, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 20, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 19, 2018ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jul 18, 2018LIMELIMITATION FROM THE IB - REQUEST EXAM REVIEW—
Jun 30, 2018GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Jun 30, 2018GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jun 30, 2018CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jun 29, 2018LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Jun 15, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 15, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 6, 2018ALIEASSIGNED TO LIE—
May 30, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 22, 2018ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Dec 17, 2017RFNTREFUSAL PROCESSED BY IB—
Nov 30, 2017RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Nov 30, 2017RFRRREFUSAL PROCESSED BY MPU—
Nov 17, 2017RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Nov 16, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 14, 2017MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 9, 2017DOCKASSIGNED TO EXAMINER—
Nov 9, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 7, 2017REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance