Drawing for SBI

USPTO serial 79219872

SBI

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
TRUSILO, KELLY JEAN
Law office
TMEG LAW OFFICE 107 - EXAMINING ATTORNEY ASSIGNED

What this means

These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.

Status 602: These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances.

Need help with SBI?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
006Metallic containers for storage; metallic containers for the shipping and transportation of goods; prefabricated metal building structures; transportable buildings of metal; shipping containers (term considered too vague by the International Bureau - Rule 13.2.b of the Common Regulations); metal parts and fittings in this class for metal containers for storage or transport; apparatus of metal for securing loads including apparatus specifically adapted for transporting pipes; articles made of metal for handling, lifting, restraining, transferring or transporting loads including articles made of metal specifically adapted for pipes; loading pallets of metal including pallets specifically adapted for pipes; storage racks of metal including racks specifically adapted for pipes; mobile storage racks of metal including racks specifically adapted for pipes; relocatable storage racks including racks specifically adapted for pipes; parts and fittings in this class for storage racks of metal and mobile storage racks of metal; racking structures of metal for storage purposes including racking specifically adapted for pipes; storage apparatus and structures of metal (term considered too vague by the International Bureau - Rule 13.2.b of the Common Regulations); storage frames and structures of metal (term considered too vague by the International Bureau - Rule 13.2.b of the Common Regulations); storage modules of metal (term considered too vague by the International Bureau - Rule 13.2.b of the Common Regulations); storage shelves of metal including shelves specifically adapted for pipes; pallet racks of metal including pallets specifically adapted for pipes; frames of metal for pallets; handling pallets of metal including pallets specifically adapted for pipes; loading pallets of metal; mobile pallets of metal; transport pallets of metal; supports of metal for shelves (other than parts of furniture), frames and racks; spacers of metal; castings of metalACTIVE—
007Portable energy generators including solar portable energy generators; electricity generators including solar electricity generators; photovoltaic power generators; solar power generators; solar photovoltaic power generation systems using solar trackers; transportable power generators using solar powerACTIVE—
009Solar cells for electricity generation; solar energy operating apparatus; solar panels for the production of energy; mobile and portable solar panel arrays for electricity generation; solar batteries; solar collectors for electricity generationACTIVE—
011Chilling containers; refrigeration containers; water purification installations and equipment including transportable water purification installations; solar energy collectors for heating; solar energy powered heating apparatus and installations; solar thermal collectors for heatingACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 5, 2019FINTFINAL DECISION TRANSACTION PROCESSED BY IB—
Jun 19, 2019FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jun 19, 2019FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Apr 19, 2019OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Apr 3, 2019OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 3, 2019OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Jun 19, 2018MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Jun 19, 2018ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Dec 9, 2017RFNTREFUSAL PROCESSED BY IB—
Nov 21, 2017RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Nov 21, 2017RFRRREFUSAL PROCESSED BY MPU—
Nov 10, 2017MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 8, 2017RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Nov 7, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 6, 2017DOCKASSIGNED TO EXAMINER—
Nov 6, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 2, 2017REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance