USPTO serial 79220505
ORSTED
Reviewed by CopyMark Law Group
Reg. 5543112Status 709
- Filing date
- Status date
- Registration date
- Aug 21, 2018
- Examiner
- REID, CAILE MAUREEN
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with ORSTED?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Miriam D. Trudell
Miriam D. Trudell Davis Graham & Stubbs LLC3400 Walnut Street, Suite 700DENVER, CO 80205United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 004 | Fuels; electricity in the nature of electrical energy; energy of all descriptions, namely, electricity, industrial oils, coal fuels and gas | SECTION 71 - CANCELLED | — |
| 035 | Fuel meter reading services in the nature of utility bill management services by tracking energy information from utility meter data; organization of loyalty schemes in the nature of business administration of consumer loyalty programs; billing services in the field of energy | SECTION 71 - CANCELLED | — |
| 036 | Financial services, namely, support and consultancy in the field of commodity trading for others featuring energy-related commodities | SECTION 71 - CANCELLED | — |
| 037 | Construction, decommissioning in the nature of demolition and repair of buildings, power station buildings and waste storage buildings and facilities; construction, installation and repair of heating and power generation equipment and gas and electric appliances and transmission lines; pipeline construction and maintenance; construction, maintenance and repair of electricity generating plants; extraction of oil, gas, coal, water or other natural resources for manufacturing of power and energy products; construction, repair and installation services of energy production plants and machines for the production of energy from wind energy; consultancy relating to the construction, installation and maintenance of wind power production facilities | SECTION 71 - CANCELLED | — |
| 039 | Storage, distribution and supply of power, electricity, fuels and energy; waste collection, removal and storage | SECTION 71 - CANCELLED | — |
| 040 | Power generation; production of energy, also from renewable sources; waste and straw in the nature of waste, trash, rubbish treatment; recycling of waste and chemicals; processing and refinement of fuel materials, including biological gas, bioethanol, oil and gas; decontamination of hazardous materials from buildings, equipment, material and land; professional assistance and consulting services regarding recycling and reclamation of usable materials in the nature of recovery and processing of biological materials and products and waste into soil products, vegetable mould and gas; advisory and consultancy services relating to processing of energy and fuels | SECTION 71 - CANCELLED | — |
| 041 | Organization of sporting events, namely, soccer competitions | SECTION 71 - CANCELLED | — |
| 042 | Advisory and consultancy services relating to energy measurement to improve energy efficiency; scientific and industrial research in the field of energy production; technical consultation in the field of power plant engineering, namely, testing of power generating plants and equipment to improve performance and efficiency; development and implementation of industrial, horticultural and agricultural engineering processes which are intended to reduce levels of carbon dioxide and emissions in the atmosphere; research in connection with environmental protection; technological consultancy relating to the engineering of broadband and wideband communications infrastructures, fibre and grids; technological consultancy relating to renewable energy of every description; consultancy relating to the inspection of oil- and gas pipelines; technological consultancy in relating to wind power | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Inbicon A/S
- Other trademarks owned by Inbicon A/S
- Other trademarks owned by Inbicon A/S
- Other trademarks in Class 004
- Other trademarks in Class 035
- Other trademarks in Class 036
- Other trademarks in Class 037
- Other trademarks in Class 039
- Other trademarks in Class 040
- Other trademarks in Class 041
- Other trademarks in Class 042
- Similar marks named ORSTED
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 18, 2026 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Jun 3, 2026 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Jun 3, 2026 | INPC | INVALIDATION PROCESSED | — |
| Nov 7, 2025 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Mar 7, 2025 | C71T | CANCELLED SECTION 71 | — |
| Nov 15, 2024 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Nov 15, 2024 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Nov 15, 2024 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 15, 2024 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Nov 13, 2024 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Nov 13, 2024 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 13, 2024 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Aug 21, 2023 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Jun 4, 2021 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Dec 28, 2018 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 8, 2018 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Dec 8, 2018 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Nov 21, 2018 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Aug 21, 2018 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 5, 2018 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jun 5, 2018 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 2, 2018 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| May 16, 2018 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| May 16, 2018 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 16, 2018 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Apr 27, 2018 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 25, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 24, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 24, 2018 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 17, 2017 | RFNT | REFUSAL PROCESSED BY IB | — |
| Nov 30, 2017 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Nov 30, 2017 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Nov 21, 2017 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 17, 2017 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Nov 16, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 16, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 16, 2017 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 9, 2017 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |