USPTO serial 79220980
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Alexander Lazouski
Alexander Lazouski Lazouski IP LLCSuite 1, 14726 Bowfin Ter.Lakewood Ranch, FL 34202United States| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Metal roofing panels; metal fencing panels; metal coverings, in particular colored and profiled metal sheets; metal building materials, namely, soffits; refractory and fire resistant roofing of metal; refractory and fire resistant building panels of metal; metal façade panels for construction purposes; wall panels of metal; metal ceiling panels; refractory and fire resistant building panels of metal; metal foils, in particular aluminum foil; structural parts of metal for prefabricated buildings, of metal; prefabricated metal buildings in the nature of cabins and structural parts thereof, for use during engineering projects | ACTIVE | — |
| 017 | Refractory or fire resistant structural insulated construction panels used in roof coverings; noise and sound insulating materials used in building construction; thermal insulator for protection from effects of temperature, fire, radiation and weather; insulating materials; structural insulated construction panels; mineral wool for use as a building insulator; extruded plastic in the form of bars, blocks, pellets, rods, sheets, tubes, for use in manufacturing; polyurethane foam being insulating material used in building panels, facades and coverings; insulating materials used in building panels in the form of polyester and polyester fibres; electrical insulating tapes; self-adhesive tapes, other than stationery and not for medical or household purposes; semi-processed artificial resins; draught excluder strips in the nature of non-metal weather strips for buildings; fibreglass for insulation; metal foil for insulation; glass wool for insulation; conductive tape for electromagnetic radiation shielding in electronic product; substances for insulating buildings against moisture; insulating fabrics; insulating felt for use in building wall and ceilings; insulating paper; insulating tape and band; mineral wool for use as a building insulator; insulating materials in the nature of non-conducting materials for retaining heat; slag wool for use as a building insulator; soundproofing materials; semi-processed synthetic resins; insulating materials, namely, glass fibers for insulation; packing foam in sheet form; stopping materials, namely, door stops of rubber; flexible pipes, not of metal | ACTIVE | — |
| 019 | [ Refractory and fire resistant wall panels, not of metal; non-metallic building materials, namely, non-metal window panels, non-metal floor tiles; non-metal roof coverings; non-metal facade panels for construction purposes; building panels, not of metal; non-metal roofing; prefabricated non-metal buildings; prefabricated houses, not of metal; structural parts of non-metal prefabricated buildings and houses; prefabricated non-metal buildings in the nature of cabins with structural parts thereof, used during engineering projects; bituminous coatings for roofing; non-metal wall claddings for building; wall linings, not of metal, for building; building glass; building materials, not of metal, namely, semi-worked woods; building panels, not of metal ] | SECTION 7(e) - CANCELLED | — |
| 037 | [ Preparatory services for construction and assembly, namely, demolition of building structures, construction site cleaning, digging, blasting of rocks on construction sites, construction site levelling, drilling of wells; building services, in particular, building construction; applying protective coatings to wood, metal, ceramic, and plastic; construction of residential buildings; installation of building insulation; installation of insulation materials; construction finishing, namely, interior and exterior painting, floor polishing, floor sanding, installing floor tiles, installation of ceiling insulation, mounting of facades and installation of building construction elements and wall and floor covering; cleaning of buildings; interior finishing of building surfaces as part of building construction; building construction services; repair of buildings; plumbing services ] | SECTION 7(e) - CANCELLED | — |
| 042 | Design of portable building structures and of parts for buildings for use by others; engineering; technical consultancy services relating to structural engineering; computer technological consultancy; scientific and technological services, namely, research and design in the field of new building materials, civil and structural engineering and construction of commercial and residential buildings; industrial analysis and research in the field of new building materials, civil and structural engineering and construction of commercial and residential buildings | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 4, 2026 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Dec 12, 2023 | NURC | NOTICE OF UPDATED REGISTRATION CONFIRMATION EMAILED | — |
| Dec 7, 2023 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Nov 6, 2023 | LIME | LIMITATION FROM THE IB EXAMINED AND ENTERED | — |
| Nov 6, 2023 | COC. | CORRECTION UNDER SECTION 7 - PROCESSED | — |
| Sep 15, 2023 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Aug 14, 2023 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| May 7, 2023 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Dec 21, 2018 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Nov 30, 2018 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Nov 30, 2018 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Nov 14, 2018 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Aug 14, 2018 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 12, 2018 | CORN | CORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| Jun 2, 2018 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jun 1, 2018 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| May 29, 2018 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 29, 2018 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 16, 2018 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| May 16, 2018 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| May 9, 2018 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Apr 26, 2018 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 25, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 24, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 24, 2018 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Apr 11, 2018 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Apr 11, 2018 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Apr 11, 2018 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Mar 7, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 7, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 5, 2018 | ALIE | ASSIGNED TO LIE | — |
| Feb 20, 2018 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 10, 2018 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jan 25, 2018 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Jan 22, 2018 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jan 22, 2018 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jan 12, 2018 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 11, 2018 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 5, 2017 | RFWR | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW | — |
| Dec 5, 2017 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Dec 4, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 28, 2017 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 22, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 22, 2017 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 17, 2017 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Nov 16, 2017 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |