USPTO serial 79221212
SSS.INFRA
Reviewed by CopyMark Law Group
Reg. 5582860Status 709
- Filing date
- Status date
- Registration date
- Oct 16, 2018
- Examiner
- THOMAS, JULIE
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with SSS.INFRA?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Frazione Mattarello, IT
Frazione Mattarello, IT
Frazione Mattarello, IT
IT
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
John Alumit
John Alumit ALUMIT IP135 S. Jackson Street, Suite 200Glendale, CA 91205UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Computer software, recorded for civil and industrial infrastructure engineering design; computer software applications, downloadable for civil and industrial infrastructure engineering design; computer software platforms for civil and industrial infrastructure engineering design; application software for civil and industrial infrastructure engineering design; computer software for two-dimensional and three-dimensional simulation in design for civil and industrial engineering works; surveying apparatus and instruments; Global Positioning System [GPS] apparatus, namely GPS receivers | SECTION 71 - CANCELLED | — |
| 037 | Construction and maintenance services for structures built using civil and industrial engineering; demolition of structures built using civil and industrial engineering; construction consultancy; construction information; building construction supervision; building construction supervision services for real estate projects | SECTION 71 - CANCELLED | — |
| 042 | Engineering; civil and industrial engineering services; architectural design; engineering design services; construction drafting; technical project design services in the field of engineering; conducting technical project studies related to structural engineering and energy efficiency for construction projects; architectural services for the design of industrial buildings; urban design planning services and construction drafting, and consultancy relating thereto; architectural consultancy; industrial design; geological surveys; surveying; urban planning; geological research; mechanical research; technical research in the field of civil and industrial engineering; architectural services; engineering drawing services; analysis of technical engineering data; preparation of technical engineering reports; conducting of technical feasibility studies in the field of environmental, civil and industrial engineering | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by SWS ENGINEERING S.p.A.
- Other trademarks owned by SWS ENGINEERING S.p.A.
- Other trademarks owned by SWS ENGINEERING S.p.A.
- Other trademarks owned by SYSTRA S.p.A
- Other trademarks in Class 009
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named SSS.INFRA
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 20, 2026 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Aug 5, 2026 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Aug 5, 2026 | INPC | INVALIDATION PROCESSED | — |
| Jan 2, 2026 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| May 2, 2025 | C71T | CANCELLED SECTION 71 | — |
| Dec 20, 2024 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Oct 25, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 18, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 16, 2023 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| May 15, 2021 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Feb 22, 2019 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Feb 4, 2019 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Feb 4, 2019 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jan 16, 2019 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Oct 16, 2018 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 31, 2018 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jul 31, 2018 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 27, 2018 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jul 11, 2018 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jul 11, 2018 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 11, 2018 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jun 28, 2018 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 28, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 27, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 27, 2018 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 14, 2018 | CORN | CORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| Apr 19, 2018 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| Feb 10, 2018 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jan 12, 2018 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jan 12, 2018 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Dec 24, 2017 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Dec 23, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 29, 2017 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 25, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 25, 2017 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 24, 2017 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Nov 23, 2017 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |