Drawing for F FERRETTI

USPTO serial 79221222

F FERRETTI

Reviewed by CopyMark Law Group

Reg. 5899433Status 739Registered
Filing date
Status date
Registration date
Nov 5, 2019
Examiner
OESTREICHER, SALIMA PARMAR
Law office
Historical data usage

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with F FERRETTI?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Andrew D. Dorisio

Andrew D. Dorisio DICKINSON WRIGHT PLLC300 West Vine Street, Suite 1700Lexington, KY 40507United States

Goods and services

ClassDescriptionStatusFirst use
037Construction of industrial buildings and factories in the iron and steel, chemical, pharmaceutical, cosmetic, mechanical, petrochemical, glass, energy, ecological, lime and cement industry; building construction; real estate construction, namely, construction of foundations for buildings; construction services, namely, planning, laying out and custom construction of commercial buildings; construction of road motorway networks and of vehicular bridges; [ construction and construction management of tunnels and underground structures; ] erecting manufacturing plants; civil engineering construction, namely, project management and construction of offices, shopping centers, airports and parking garages; residential and commercial building construction; construction of incinerators; furnace installation, namely, installation of non-metallic refractory linings; maintenance of residential and commercial buildings; maintenance of industrial plants; maintenance of furnaces, namely, maintenance of refractory linings; repair or maintenance of industrial furnaces; installation of industrial plants; installation of industrial furnaces; installation of fabricated construction units; furnace installation and repair; environmental reclamation of industrial places, namely, land reclamation services; asbestos removal; asbestos reclamation in the nature of asbestos removalACTIVE—
042Scientific and technological services, namely, and research and design in the field of automation and robotics [ , computer networking software, and computer data centers ] ; industrial analysis and research services in the field of energy saving, refractory material, cement, safety equipment; [ design and development of computer hardware and software; ] engineering drawing services; design of factory and residential buildings; design of industrial plants; engineering design servicesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 5, 2026NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Feb 5, 2026C75AREGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK.—
Jan 26, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Sep 22, 2025ES75TEAS SECTION 71 & 15 RECEIVED—
Nov 5, 2024REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Jun 17, 2021TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jun 17, 2021ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Jun 17, 2021ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 17, 2021REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Oct 3, 2020FINPFINAL DECISION TRANSACTION PROCESSED BY IB—
Jun 25, 2020IRRHIRREGULARITY FROM IB EXAMINED BY MPU—
Apr 28, 2020IRFIIRREGULARITY ON FINAL DECISION RECEIVED FROM IB—
Feb 28, 2020FICSFINAL DISPOSITION NOTICE SENT TO IB—
Feb 28, 2020FIMPFINAL DISPOSITION PROCESSED—
Feb 5, 2020FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Nov 5, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 20, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 20, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 16, 2019GPNXNOTIFICATION PROCESSED BY IB—
Jul 31, 2019OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jul 31, 2019OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jul 31, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 9, 2019CREVCORRECTION FROM IB ENTERED - ATTORNEY REVIEW REQUIRED—
May 31, 2019CRTPREG. CANCELLED - RESTORED TO PENDENCY—
May 21, 2019APETASSIGNED TO PETITION STAFF—
May 17, 2019RCIIREQUEST TO CANCEL INADVERTENTLY ISSUED REGISTRATION RECEIVED—
Nov 16, 2018CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Nov 9, 2018FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Oct 18, 2018FICSFINAL DISPOSITION NOTICE SENT TO IB—
Oct 18, 2018FIMPFINAL DISPOSITION PROCESSED—
Oct 10, 2018FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jul 10, 2018R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 24, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 24, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 9, 2018CORRCORRECTION FROM IB ENTERED - NO REVIEW REQUIRED—
Apr 4, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 19, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 19, 2018XAECEXAMINER'S AMENDMENT ENTERED—
Mar 19, 2018GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Mar 19, 2018GNEAEXAMINERS AMENDMENT E-MAILED—
Mar 19, 2018CNEAEXAMINERS AMENDMENT -WRITTEN—
Feb 21, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 21, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 21, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 16, 2018CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Feb 8, 2018ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 8, 2018REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jan 27, 2018RFNTREFUSAL PROCESSED BY IB—
Dec 21, 2017RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Dec 21, 2017RFRRREFUSAL PROCESSED BY MPU—
Dec 12, 2017RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Dec 11, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 9, 2017MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 5, 2017DOCKASSIGNED TO EXAMINER—
Dec 5, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 28, 2017LIMILIMITATION FROM ORIGINAL APPLICATION ENTERED—
Nov 23, 2017REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance