USPTO serial 79221760
AIRKEL
Reviewed by CopyMark Law Group
Reg. 5624679Status 404
- Filing date
- Status date
- Registration date
- Dec 11, 2018
- Examiner
- MAJCHER HARTNETT, MEGAN K
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with AIRKEL?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Hope V. Shovein
Hope V. Shovein Brooks Kushman P.C.1000 Town Center, 22nd FloorSouthfield, MI 48075UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Transportable buildings of metal; metal building materials, namely, soffits, fascia, ceiling boards and floor board, metal countertops for further installation, stair nosing of metal; steel portable buildings | SECTION 70 - CANCELLED | — |
| 011 | Electronic light fixtures, central heating radiators, steam generating installations, cooking ovens, air purifying apparatus, ionization apparatus for the treatment of air, electric room deodorizing units, air conditioning apparatus, air filter installation and non-medical sterilizers | SECTION 70 - CANCELLED | — |
| 019 | Transportable buildings, not of metal; building materials, not of metal, namely, non-metal countertops for further installation, non-metal flooring materials, fascia, soffits; glass and glass panes, for building; buildings, not of metal, namely, prefabricated non-metal buildings, portable non-metal buildings; insulating glass for building | SECTION 70 - CANCELLED | — |
| 037 | Building construction, namely, construction of isolated smoking areas, rooms with airflow ventilation systems, smoking cubes; repair and installation services, namely, repair and installation of air filtration, purification and distribution systems; building construction information in the fields of odor-free smoking areas and odor-free areas; purification apparatus installation and repair; building construction supervision, namely, construction supervision of isolated smoking areas, rooms with airflow ventilation systems, smoking cubes; information on building construction, repair and maintenance in the fields of odor-free smoking areas and odor free areas | SECTION 70 - CANCELLED | — |
| 040 | Treatment of materials, namely, in the field of air deodorizing, air freshening and air purification; air purifying, deodorizing and freshening; custom assembling of materials for others, namely, assembly of products for others | SECTION 70 - CANCELLED | — |
| 042 | Architectural services; architectural consultation; construction drafting; design of interior decor; material testing; technical project studies, namely, technical research in the fields of odor-free smoking areas and odor free areas; engineering; software design and development | SECTION 70 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by GPF CONCEPT-MANAGEMENT S.A.
- Other trademarks owned by GPF CONCEPT-MANAGEMENT S.A.
- Other trademarks owned by GPF CONCEPT-MANAGEMENT S.A.
- Other trademarks in Class 006
- Other trademarks in Class 011
- Other trademarks in Class 019
- Other trademarks in Class 037
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named AIRKEL
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| May 17, 2021 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| May 17, 2021 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Sep 27, 2019 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Apr 12, 2019 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Mar 29, 2019 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Mar 19, 2019 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Mar 19, 2019 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Mar 11, 2019 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Dec 11, 2018 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Nov 2, 2018 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Sep 25, 2018 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 25, 2018 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 5, 2018 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Sep 5, 2018 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 5, 2018 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Aug 20, 2018 | ALIE | ASSIGNED TO LIE | — |
| Aug 8, 2018 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 7, 2018 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Aug 7, 2018 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Aug 7, 2018 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Aug 7, 2018 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jul 20, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 19, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 19, 2018 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 2, 2018 | RFNP | REFUSAL PROCESSED BY IB | — |
| Jan 30, 2018 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jan 30, 2018 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jan 20, 2018 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 19, 2018 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 17, 2018 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 12, 2017 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Dec 7, 2017 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 28, 2017 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Nov 23, 2017 | SDRC | SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB | — |