Drawing for SPECTIVE

USPTO serial 79222533

SPECTIVE

Reviewed by CopyMark Law Group

Reg. 5624702Status 700Registered
Filing date
Status date
Registration date
Dec 11, 2018
Examiner
TAYLOR, DAVID T
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with SPECTIVE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Emily A. Shouse

Emily A. Shouse Patterson Intellectual Property Law, P.C1600 Division Street, Suite 500Nashville, TN 37203United States

Goods and services

ClassDescriptionStatusFirst use
007Crushing machines and installations, in particular jaw crushers, cone crushers and impact crushers; sifting machines and installations; machines for processing asphalt, concrete, road surfaces, bitumen, bituminous mixtures, stone, ore, construction materials, raw materials, valuable materials or waste; recycling machines; [ mechanical, hydraulic and pneumatic controls for machines; mechanical, hydraulic and pneumatic controls for motors; ] separating machines for separating asphalt, concrete, road surfaces, bitumen, bituminous mixtures, stone, ore, construction materials, raw materials, valuable materials or waste [ ; mechanical, hydraulic and pneumatic controls for engines; pumps as parts of machines, motors or engines; compressors for machines; electricity generators; motors, other than for land vehicles; powertrains as parts of machines, not for land vehicles; valves being parts of machines; valve blocks as parts of machines; structural parts and fittings for all the aforesaid goods, included in this class; replacement parts and fittings for all the aforesaid goods ]ACTIVE—
009Electronic and electric controls for machines; programmable logic controllers; [ Ethernet controllers; ] monitors, in particular flat panel displays, LCD monitors and computer touchscreens; [ sensors, in particular revolution sensors, pressure sensors and level sensors; revolution counters; pressure meters; scales; frequency invertors; connecting modules for electronic and electric controls; bus interfaces; Ethernet adapters; ] radio receivers; radio transmitters; [ Ethernet transmitters; Ethernet receivers; cables for electricity; electric control boxes, switch cabinets and control boards; ] electric control panels; [ electric relays; fuses; electrical circuits and circuit boards; computers; computer hardware; data processing equipment; computer peripherals; ] all the aforesaid goods for crushing machines, crushing installations, sifting machines, sifting installations, processing machines, recycling machines and separating machines; [ electronic controls for motors; electronic and electric controls for motors or engines; electronic and electric control apparatus for machines, motors or engines; ] electronic and electric control units for machines [ , motors or engines ] ; electronic and electric control systems for machines [ , motors or engines ] ; electronic and electric control installations for machines [ , motors or engines ] ; software and computer hardware for monitoring, controlling and remote controlling of machines; remote controls for machines [ , motors or engines ] ; fuel level meters; level indicators; [ level gauges; processors, namely, central processing units; ] transmitters of electrical signals; receivers of electrical signals; [ electric and electronic components for computers; ] electric and electronic components for crushing machines, crushing installations, sifting machines, sifting installations, processing machines, recycling machines and separating machines; [ electric and electronic components for electronic and electric controls, ] electronic and electric control apparatus, electronic and electric control units, electronic and electric control systems and electronic and electric control installations for machines [ , motors or engines ] ; [ electric switches; electric cables and wires; electric connection components, namely, connection strips for electricity, electric plugs, plugs for electric sockets, electric adapters, electric connection boxes for electric and optical cables, adapter boxes for electric and optical cables, plugs and bushes for electric and optical cables, wire end sleeves, electric connectors, electric plugs, wire end sleeves; electricity terminals; ] computer software for the management, monitoring, control, operating and regulating of [ motors, engines, drive systems, ] recycling, processing, crushing, sifting and separating machines; computer software for propulsion and traction control; computer software for data analysis, data processing, database management, telecommunications, telematics [ and navigation ] ; computer software for the planning, controlling, management and implementation of recycling, processing, crushing, sifting and separating processes; computer software for capturing, evaluating, recording, transmission, reception or reproduction of data concerning recycling, processing, crushing, sifting and separating machines; computer software for capturing, evaluating, recording, transmission, reception or reproduction of data concerning recycling, processing, crushing, sifting and separating processes; computer software for capturing, evaluating, recording, transmission, reception or reproduction of data concerning the condition, operation of and faults with recycling, processing, crushing, sifting and separating machines; computer software for the computerized connection of construction, recycling, processing, material feeding, crushing, sifting, separating and mixing machines; recorded data, namely, information in the field of recycling, processing, crushing, sifting and separating machines, in the field of data analysis, data processing, telecommunications, database management, telecommunications, telematics and navigation, in the field of recycling, processing, crushing, sifting and separating processes, all recorded on computer media or recorded digitally, electronically, magnetically or optically [ ; blank data carriers for bearing pictures, sound and data; apparatus and instruments for capturing, recording, transmission, reception and reproduction of sound, images and data; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; structural parts and fittings for all the aforesaid goods, included in this class; replacement parts and fittings for all the aforesaid goods ]ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 14, 2026INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Mar 26, 2026INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE—
Mar 16, 2026XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Mar 16, 2026XXCRGENERIC MADRID TRANSACTION CREATED—
Oct 5, 2025INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Sep 29, 2025INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Aug 29, 2025PRA7REGISTERED - SEC. 7 REQUEST ABANDONED—
Aug 27, 2025PRAMPOST REGISTRATION ACTION MAILED - SEC. 7—
Aug 18, 2025APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Mar 26, 2025ES7RTEAS SECTION 7 REQUEST RECEIVED—
Feb 5, 2025NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Feb 5, 2025C75AREGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK.—
Jan 13, 2025APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jun 21, 2024ES75TEAS SECTION 71 & 15 RECEIVED—
Dec 11, 2023REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Apr 10, 2021NREPNEW REPRESENTATIVE AT IB RECEIVED—
Apr 5, 2019FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 20, 2019FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 20, 2019FIMPFINAL DISPOSITION PROCESSED—
Mar 11, 2019FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Dec 11, 2018R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 25, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 25, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 21, 2018GPNXNOTIFICATION PROCESSED BY IB—
Sep 5, 2018OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Sep 5, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 5, 2018OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Aug 21, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 18, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 18, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 16, 2018ALIEASSIGNED TO LIE—
Jul 3, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 27, 2018RFNTREFUSAL PROCESSED BY IB—
Jan 6, 2018RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jan 6, 2018RFRRREFUSAL PROCESSED BY MPU—
Dec 17, 2017RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Dec 16, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 13, 2017MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 9, 2017DOCKASSIGNED TO EXAMINER—
Dec 9, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 7, 2017REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance