Drawing for DUSTRÉSA

USPTO serial 79223008

DUSTRÉSA

Reviewed by CopyMark Law Group

Reg. 5592517Status 708Registered
Filing date
Status date
Registration date
Oct 30, 2018
Examiner
YONTEF, DAVID ERIC
Law office
Historical data usage

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with DUSTRÉSA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Dionne D. Heard

Dionne D. Heard Osha Bergman Watanabe & Burton LLP1100 Louisiana StreetSuite 4900Houston, TX 77002

Goods and services

ClassDescriptionStatusFirst use
007[Chemical processing machines and apparatus, namely, separating machines for chemical processing and emulsifying machines for chemical processing;] dust collecting machines for chemical processing [; extracting machines for collecting mist for chemical processing; extracting machines for collecting oil mist for chemical processing; oil-water separators for pneumatic controls being part of machines; filtering machines for chemical processing; filters for dust collecting machines for chemical processing; filters for extracting machines for collecting mist for chemical processing; filters for extracting machines for collecting oil mist for chemical processing; non-electric prime movers, not for land vehicles other than water mills and wind mills, namely, turbines, other than for land vehicles and internal combustion engines for machine operation; motors and engines except for land vehicles; water milling machines; windmills; pneumatic and hydraulic machines and instruments, namely, power-operated blowers, pneumatic and hydraulic pumps and compressors for machines; air suction machines; blowing machines for the compression, exhaustion and transport of gases; steam engine boilers for non-electric prime movers in the nature of turbines, other than for land vehicles and internal combustion engines for machine operation]ACTIVE—
011Electric boilers, other than parts of machines; freezing machines and apparatus for industrial purposes, namely, freezers; drying apparatus and installations, namely, drying apparatus for chemical processing; recuperators for chemical processing; steamers for chemical processing; evaporators for chemical processing; distillation apparatus not for scientific purposes; heat exchangers for chemical processing; air-conditioning apparatus for industrial purposes; filters for air purifiers for industrial purposes; air filters for air conditioning units for industrial purposes; air filtering installations for industrial purposes; air cooling apparatus for industrial purposes; hot air apparatus for industrial purposes, namely, hot air blowers, hot-air space heating apparatus; air purifiers for industrial purposes; electric air deodorizers for industrial purposes; fans for air conditioning apparatus for industrial purposes; ventilating fans for industrial purposes; water purification units for industrial purposes; garbage incinerators for industrial purposes]SECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 27, 2026INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Jul 23, 2026XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Jul 23, 2026XXCRGENERIC MADRID TRANSACTION CREATED—
Dec 21, 2025INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Apr 21, 2025NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Apr 21, 2025C75PREGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.—
Apr 7, 2025APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Oct 30, 2024ES75TEAS SECTION 71 & 15 RECEIVED—
Sep 13, 2024ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
May 8, 2024TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
May 8, 2024ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 8, 2024REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Oct 30, 2023REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
May 26, 2023TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
May 26, 2023ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 26, 2023REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Aug 27, 2021CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Aug 27, 2021TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Aug 27, 2021EWAFTEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS—
Aug 27, 2021ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 27, 2021REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Aug 27, 2021COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Mar 8, 2019FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Feb 28, 2019ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Feb 9, 2019FICSFINAL DISPOSITION NOTICE SENT TO IB—
Feb 9, 2019FIMPFINAL DISPOSITION PROCESSED—
Jan 30, 2019FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Oct 30, 2018R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 14, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 14, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 11, 2018GPNXNOTIFICATION PROCESSED BY IB—
Jul 25, 2018OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jul 25, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 25, 2018OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jul 5, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 4, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 3, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 3, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 11, 2018ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 11, 2018REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Feb 3, 2018RFNTREFUSAL PROCESSED BY IB—
Jan 12, 2018RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jan 12, 2018RFRRREFUSAL PROCESSED BY MPU—
Dec 29, 2017RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Dec 28, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 23, 2017MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 19, 2017DOCKASSIGNED TO EXAMINER—
Dec 19, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 18, 2017LIMILIMITATION FROM ORIGINAL APPLICATION ENTERED—
Dec 14, 2017REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance