Drawing for XTENDED POWER ALPHA/BETA

USPTO serial 79224255

XTENDED POWER ALPHA/BETA

Reviewed by CopyMark Law Group

Reg. 5609108Status 709
Filing date
Status date
Registration date
Nov 20, 2018
Examiner
HUSSAIN, TASNEEM
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with XTENDED POWER ALPHA/BETA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Elizabeth A. Cominolli

Elizabeth A. Cominolli Barclay Damon LLP1270 Avenue of the Americas, Suite 600New York, NY 10020UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Machines and installations composed thereof for renewable energy generation, in particular wind power installations, windmills; towers, rotor blades, machine housings and rotors being structural parts of wind energy installations; current generators, emergency power generators, standby electricity generators, alternators; structural parts for wind energy installationsSECTION 71 - CANCELLED—
009Checking apparatus and instruments, namely, computers; apparatus and instruments for conducting, distributing, transforming, accumulating, regulating or controlling electricity, namely, electric conductors, electric transformers, electric accumulators, voltage regulators; apparatus and instruments for regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; pre-recorded magnetic data carriers featuring information on wind energy; calculating machines, data processing equipment and computers; computer operating software; electric control devices for wind energy installations and wind farms, programs being software for controlling wind energy installations and wind farms; electrical contractors being fuses, in particular for protection against voltage surge, excess current, fault current, short circuits; electric monitors for monitoring electric current and electrical signals, electric converters, electric switches, electric commutators for commutation, integrated circuits, electricity distribution consoles, integrated circuit chips for controlling wind energy installations and wind farms; electrical circuitry, electrical frequency converters, electric sensors, electric sensors for measuring meteorological parameters; anemometers, pressure measuring apparatus, remote controls for wind energy installations, interfaces for computers, voltmeters, ammeters, electricity transformers, processors being central processing unitsSECTION 71 - CANCELLED—
037Installation, assembly, maintenance and repair of wind energy installations and parts therefor; installation, assembling, maintenance and repair of data processing apparatus, computer hardware and measuring equipment; installation, assembly, maintenance and repair of wind farmsSECTION 71 - CANCELLED—
042Scientific research; technological research and design for others in the field of wind energy technology; industrial research in the field of wind energy; design and development of computer hardware and software; technical consultancy in the field of generation of alternative ecological energy, technical configuration of energy networks, namely, computer network configuration services; technical development of energy networks, technical planning, for others, in connection with the operation of computer system installations for the supply of electricity, heat, water and cold; configuring computer networks by means of software; creation, maintenance and updating of computer programs; design and creation of Internet pages; consultancy in the field of energy-saving, namely, consulting services in the fields of energy measurement to improve energy efficiency; technical consultancy, namely, engineering services with regard to the operation and management of wind farms, technical consultancy, namely, engineering services for operators of wind energy installations; scientific research relating to wind energy installations and parts therefor; technical development and technical checking as inspection of wind energy installations and parts therefor; development of programs as software for controlling wind energy installations and wind farms, engineering services, technical research in the field of wind energy technology; installation, maintenance and repair of computer softwareSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 29, 2026INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Oct 12, 2026INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Oct 12, 2026INPCINVALIDATION PROCESSED—
Feb 6, 2026INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jun 6, 2025C71TCANCELLED SECTION 71—
Apr 11, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED—
Nov 20, 2023REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
May 9, 2021ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Mar 22, 2019FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 4, 2019FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 4, 2019FIMPFINAL DISPOSITION PROCESSED—
Feb 20, 2019FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Nov 20, 2018R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 19, 2018GPNXNOTIFICATION PROCESSED BY IB—
Sep 4, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 4, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 15, 2018OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Aug 15, 2018OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Aug 15, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 25, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 24, 2018XAECEXAMINER'S AMENDMENT ENTERED—
Jul 24, 2018GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jul 24, 2018GNEAEXAMINERS AMENDMENT E-MAILED—
Jul 24, 2018CNEAEXAMINERS AMENDMENT -WRITTEN—
Jul 21, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 20, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 20, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 10, 2018RFNTREFUSAL PROCESSED BY IB—
Feb 6, 2018CRSNCORRECTION SENT TO IB—
Feb 6, 2018CRCRCORRECTION CREATED FOR IB—
Jan 24, 2018RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jan 24, 2018RFRRREFUSAL PROCESSED BY MPU—
Jan 17, 2018RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 16, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 13, 2018MAFRAPPLICATION FILING RECEIPT MAILED—
Jan 9, 2018DOCKASSIGNED TO EXAMINER—
Jan 9, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 4, 2018REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance