USPTO serial 79224255
XTENDED POWER ALPHA/BETA
Reviewed by CopyMark Law Group
Reg. 5609108Status 709
- Filing date
- Status date
- Registration date
- Nov 20, 2018
- Examiner
- HUSSAIN, TASNEEM
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with XTENDED POWER ALPHA/BETA?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Elizabeth A. Cominolli
Elizabeth A. Cominolli Barclay Damon LLP1270 Avenue of the Americas, Suite 600New York, NY 10020UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Machines and installations composed thereof for renewable energy generation, in particular wind power installations, windmills; towers, rotor blades, machine housings and rotors being structural parts of wind energy installations; current generators, emergency power generators, standby electricity generators, alternators; structural parts for wind energy installations | SECTION 71 - CANCELLED | — |
| 009 | Checking apparatus and instruments, namely, computers; apparatus and instruments for conducting, distributing, transforming, accumulating, regulating or controlling electricity, namely, electric conductors, electric transformers, electric accumulators, voltage regulators; apparatus and instruments for regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; pre-recorded magnetic data carriers featuring information on wind energy; calculating machines, data processing equipment and computers; computer operating software; electric control devices for wind energy installations and wind farms, programs being software for controlling wind energy installations and wind farms; electrical contractors being fuses, in particular for protection against voltage surge, excess current, fault current, short circuits; electric monitors for monitoring electric current and electrical signals, electric converters, electric switches, electric commutators for commutation, integrated circuits, electricity distribution consoles, integrated circuit chips for controlling wind energy installations and wind farms; electrical circuitry, electrical frequency converters, electric sensors, electric sensors for measuring meteorological parameters; anemometers, pressure measuring apparatus, remote controls for wind energy installations, interfaces for computers, voltmeters, ammeters, electricity transformers, processors being central processing units | SECTION 71 - CANCELLED | — |
| 037 | Installation, assembly, maintenance and repair of wind energy installations and parts therefor; installation, assembling, maintenance and repair of data processing apparatus, computer hardware and measuring equipment; installation, assembly, maintenance and repair of wind farms | SECTION 71 - CANCELLED | — |
| 042 | Scientific research; technological research and design for others in the field of wind energy technology; industrial research in the field of wind energy; design and development of computer hardware and software; technical consultancy in the field of generation of alternative ecological energy, technical configuration of energy networks, namely, computer network configuration services; technical development of energy networks, technical planning, for others, in connection with the operation of computer system installations for the supply of electricity, heat, water and cold; configuring computer networks by means of software; creation, maintenance and updating of computer programs; design and creation of Internet pages; consultancy in the field of energy-saving, namely, consulting services in the fields of energy measurement to improve energy efficiency; technical consultancy, namely, engineering services with regard to the operation and management of wind farms, technical consultancy, namely, engineering services for operators of wind energy installations; scientific research relating to wind energy installations and parts therefor; technical development and technical checking as inspection of wind energy installations and parts therefor; development of programs as software for controlling wind energy installations and wind farms, engineering services, technical research in the field of wind energy technology; installation, maintenance and repair of computer software | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by NORDEX ENERGY GmbH
- Other trademarks owned by NORDEX ENERGY GmbH
- Other trademarks owned by Nordex Energy SE & Co. KG
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named XTENDED POWER ALPHA/BETA
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 29, 2026 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Oct 12, 2026 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Oct 12, 2026 | INPC | INVALIDATION PROCESSED | — |
| Feb 6, 2026 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jun 6, 2025 | C71T | CANCELLED SECTION 71 | — |
| Apr 11, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Nov 20, 2023 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| May 9, 2021 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Mar 22, 2019 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Mar 4, 2019 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Mar 4, 2019 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Feb 20, 2019 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Nov 20, 2018 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 19, 2018 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Sep 4, 2018 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 4, 2018 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 15, 2018 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Aug 15, 2018 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Aug 15, 2018 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 25, 2018 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 24, 2018 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jul 24, 2018 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jul 24, 2018 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jul 24, 2018 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jul 21, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 20, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 20, 2018 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 10, 2018 | RFNT | REFUSAL PROCESSED BY IB | — |
| Feb 6, 2018 | CRSN | CORRECTION SENT TO IB | — |
| Feb 6, 2018 | CRCR | CORRECTION CREATED FOR IB | — |
| Jan 24, 2018 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jan 24, 2018 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jan 17, 2018 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 16, 2018 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 13, 2018 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jan 9, 2018 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 9, 2018 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jan 4, 2018 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |