Drawing for XDIM

USPTO serial 79224511

XDIM

Reviewed by CopyMark Law Group

Reg. 5705784Status 709
Filing date
Status date
Registration date
Mar 26, 2019
Examiner
SEVERSON, JUSTIN
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with XDIM?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Ellen A. Rubel

Ellen A. Rubel Moore & Van Allen PLLC100 North Tryon StreetSuite 4700Charlotte, NC 28202-4003

Goods and services

ClassDescriptionStatusFirst use
037Construction, construction supervision, installation, repair, modification, maintenance services of industrial plants and infrastructure to produce, refine, conduct, storing, transporting and distributing fluids and liquids, in particular water, hydrocarbons, petroleum, gas, natural and refined gas, liquid gas and chemicals; construction, construction supervision, installation, repair, modification, maintenance services of petrochemical plants, chemical installations, distribution networks for the transport of fluids, liquids and fuels, in particular water, hydrocarbons, petroleum, natural and refined gas, gas and liquid gas, or fuel gas, gaseous mixtures of fuels; environmental land reclamation of industrial sites; construction, repair, modification and maintenance services of facilities for the production, storage and transport of energy; construction, repair, modification or maintenance services of plants for the production of fertilizer; construction of onshore and offshore oil and gas wells for exploration and production of oil and gas fields or for geothermal power construction, construction supervision of floating means in the nature of barges, semisubs, vessels and platforms, boats or subsea means in the nature of submarines, autonomous underwater vehicles (AUV), Remotely Operated Vehicles (ROV) and subsea packages and modules; construction, construction supervision of railways, rail networks and infrastructure in the nature of roads, highways, bridges, tunnels, viaducts, overpasses and underpasses for the transport of people and goods; construction, construction supervision of marine, lake and river infrastructure in the nature of bridges, harbors, jetties, weirs, damsSECTION 71 - CANCELLED—
042Scientific and technological services, namely, research analysis and testing in the field of production, processing, transport and supplying of water, hydrocarbons, petroleum, natural gas, refinery gases, gas, liquid gas; analysis, research and testing services of chemical and petrochemical apparatus, of oil or gas wells and of oil or gas fields, including on-shore, marine or offshore oil or gas wells and oil or gas fields; research, design and engineering services of installations and plants for the production, processing, transport and supplying of water, hydrocarbons, petroleum, natural gas, refinery gases, gas, liquid gas, of chemical and petrochemical apparatus, of oil or gas wells and of oil or gas fields, including on-shore, marine or offshore oil or gas wells and oil or gas fields; research services, engineering and providing technical calculations in the fields of extraction, production, refining, processing of water, hydrocarbons, petroleum, natural gas, refinery gases, gas, liquid gas and chemicals; development of industrial processes for processing water, hydrocarbons, petroleum, natural gas, refinery gases, gas, liquid gas and chemicals; exploration of water, petroleum and natural gas; analyses of water, oil and gas wells; consulting, research and development of new technologies in relation to reclamation of areas, installations and/or industrial processes in the field of production, processing, transport and supplying of water, hydrocarbons, petroleum, natural gas, refinery gases, gas, liquid gas, of chemical and petrochemical apparatus, of oil or gas wells and of oil or gas fields, including on-shore, marine or offshore oil or gas wells and oil or gas fields; design services of railways, rail networks and infrastructure for the transport of people and goods; engineering services, design and development of installations, equipment and plants for generating, storing and transporting energy; engineering, design and development services of floating and underwater means in the nature of barges, semisubs, vessels and platforms and of submarines, AUT (autonomous underwater vehicles), ROV (Remotely Operated Vehicles) and subsea packages and modules; engineering, design and development services of marine, lake and river infrastructure in the nature of bridges, harbors, jetties, weirs, damsSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 10, 2026INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Nov 28, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED—
Oct 10, 2025C71TCANCELLED SECTION 71—
Mar 26, 2024REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Nov 10, 2023ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Aug 16, 2019FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jul 26, 2019FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jul 26, 2019FIMPFINAL DISPOSITION PROCESSED—
Jun 26, 2019FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Mar 26, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 8, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jan 8, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 19, 2018TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Dec 19, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Nov 13, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 13, 2018XAECEXAMINER'S AMENDMENT ENTERED—
Nov 13, 2018GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Nov 13, 2018GNEAEXAMINERS AMENDMENT E-MAILED—
Nov 13, 2018CNEAEXAMINERS AMENDMENT -WRITTEN—
Aug 20, 2018GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 20, 2018GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 20, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 1, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 31, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 31, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 16, 2018RFNPREFUSAL PROCESSED BY IB—
Feb 1, 2018RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Feb 1, 2018RFRRREFUSAL PROCESSED BY MPU—
Jan 25, 2018RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 24, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 23, 2018MAFRAPPLICATION FILING RECEIPT MAILED—
Jan 18, 2018DOCKASSIGNED TO EXAMINER—
Jan 18, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 4, 2018REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance