Drawing for PV

USPTO serial 79224736

PV

Reviewed by CopyMark Law Group

Reg. 5592566Status 708Registered
Filing date
Status date
Registration date
Oct 30, 2018
Examiner
EINSTEIN, MATTHEW T
Law office
Historical data usage

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with PV?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Richard M. Goldberg

Richard M. Goldberg Goldberg Patent Law Office25 East Salem StreetSuite 419Hackensack, NJ 07601

Goods and services

ClassDescriptionStatusFirst use
006[ Couplings and joints of metal for pipes; metal expansion joints for piping and ducting; pipes and tubes of metal;] manually operated metal valves, other than parts of machines; valves of metal, other than parts of machines, including those made from alloy steel and titaniumACTIVE—
007[ HYDROELECTRIC INSTALLATIONS FOR GENERATING ELECTRICITY, NAMELY, HYDROELECTRIC POWER GENERATORS; PUMP CONTROL VALVES; ] DOSING VALVES BEING PARTS OF MACHINES; VALVES FOR PUMPS; [ CONTROL VALVES FOR REGULATING THE FLOW OF GASES AND LIQUIDS BEING PARTS OF MACHINES; ] MINING MACHINES AND APPARATUS, NAMELY, MINE BORERS AND DRILLS FOR THE MINING INDUSTRYACTIVE—
009[RESISTANCE MEASURING INSTRUMENTS; FIRE-EXTINGUISHING SYSTEMS; INDUSTRIAL PROCESS CONTROL SOFTWARE; ELECTRICAL CONTROL, TESTING AND MONITORING APPARATUS, NAMELY, ELECTRICAL CONDUCTIVITY MONITOR FOR MONITORING THE CONDUCTOR AMPACITY IN OVERHEAD TRANSMISSION LINES; ELECTRICAL CONTROL PANELS FOR SECURITY ALARMS; ELECTRONIC APPARATUS FOR THE REMOTE CONTROL OF SIGNALS]SECTION 71 - CANCELLED—
037[INSTALLATION OF APPARATUS FOR THE PRODUCTION OF OIL; ] CONSTRUCTION OF STRUCTURES FOR THE PRODUCTION OF NATURAL GAS; [ INSTALLATION OF APPARATUS FOR GENERATING POWER; INSTALLATION, MAINTENANCE AND REPAIR OF APPARATUS FOR GENERATING ELECTRICITY; MAINTENANCE OF APPARATUS AND INSTALLATIONS FOR GENERATING POWER; ] SERVICING, NAMELY, MAINTENANCE AND REPAIR OF APPARATUS AND INSTALLATIONS FOR GENERATING POWER; REPAIR OF APPARATUS AND INSTALLATIONS FOR GENERATING POWER; REPAIR OF INSTALLATIONS FOR USE IN METAL PRODUCTION, METAL PROCESSING AND METAL WORKING; [ INSTALLATION, MAINTENANCE AND REPAIR OF APPARATUS FOR GENERATING POWER; MAINTENANCE AND REPAIR OF APPARATUS AND INSTALLATIONS FOR GENERATING POWER; ] CONSTRUCTION OF STRUCTURES FOR THE STORAGE OF NATURAL GAS; CONSTRUCTION OF STRUCTURES FOR THE TRANSPORTATION OF NATURAL GAS; [ INSTALLATION OF GAS SUPPLY AND DISTRIBUTION APPARATUS; RENTAL OF OIL WELL DRILLING TOOLS; ] CONSTRUCTION OF OIL PIPELINES; [ INSTALLATION OF GAS AND WATER PIPELINES; INSTALLATION OF PLUMBING; INSTALLATION OF WATER PIPES;] REPAIR OR MAINTENANCE OF CHEMICAL PLANTS; REPAIR OR MAINTENANCE OF CHEMICAL PROCESSING MACHINES AND APPARATUSACTIVE—
042[ SCIENTIFIC LABORATORY SERVICES; MATERIAL TESTING; ENGINEERING SERVICES FOR THE GAS INDUSTRY; ENGINEERING SERVICES RELATING TO ENERGY SUPPLY SYSTEMS; ENGINEERING SERVICES RELATING TO GAS TRANSPORT AND SUPPLY SYSTEMS; TECHNOLOGICAL CONSULTANCY IN THE FIELD OF ALTERNATIVE ENERGY GENERATION; RESEARCH AND DEVELOPMENT SERVICES IN THE FIELD OF CHEMISTRY; ENGINEERING SERVICES IN THE FIELD OF ENERGY TECHNOLOGY; GRAPHIC ART DESIGN; ENGINEERING DESIGN; DESIGN OF MACHINES, APPARATUS AND INSTRUMENTS; DESIGN AND DEVELOPMENT OF COMPUTER SOFTWARE FOR PROCESS CONTROL ]SECTION 7(e) - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 16, 2026INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Jun 22, 2026INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Jun 22, 2026INPCINVALIDATION PROCESSED—
Nov 18, 2025INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Mar 18, 2025NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Mar 18, 2025C75PREGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.—
Mar 11, 2025APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Oct 23, 2024ES75TEAS SECTION 71 & 15 RECEIVED—
Jul 22, 2024INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE—
Jun 14, 2024INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Nov 21, 2023NURCNOTICE OF UPDATED REGISTRATION CONFIRMATION EMAILED—
Oct 30, 2023REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Oct 14, 2023LIMELIMITATION FROM THE IB EXAMINED AND ENTERED—
Oct 13, 2023APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Oct 13, 2023COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Oct 13, 2023APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jun 30, 2023RNWLINTERNATIONAL REGISTRATION RENEWED—
Jun 10, 2023LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Mar 26, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED—
May 8, 2021ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Mar 1, 2019FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Feb 9, 2019FICSFINAL DISPOSITION NOTICE SENT TO IB—
Feb 9, 2019FIMPFINAL DISPOSITION PROCESSED—
Jan 30, 2019FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Oct 30, 2018R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 14, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 14, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 10, 2018GPNXNOTIFICATION PROCESSED BY IB—
Jul 25, 2018OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jul 25, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 25, 2018OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jul 5, 2018CORRCORRECTION FROM IB ENTERED - NO REVIEW REQUIRED—
Jul 5, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 2, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 2, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 28, 2018ALIEASSIGNED TO LIE—
Jun 15, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 15, 2018CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
May 3, 2018ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Apr 13, 2018RFNTREFUSAL PROCESSED BY IB—
Mar 9, 2018RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 9, 2018RFRRREFUSAL PROCESSED BY MPU—
Mar 6, 2018RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Mar 5, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 5, 2018DOCKASSIGNED TO EXAMINER—
Jan 23, 2018MAFRAPPLICATION FILING RECEIPT MAILED—
Jan 18, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 16, 2018LIMILIMITATION FROM ORIGINAL APPLICATION ENTERED—
Jan 4, 2018SDRCSN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB—

Frequently asked questions

Related guidance