Drawing for WOODVILLE

USPTO serial 79224923

WOODVILLE

Reviewed by CopyMark Law Group

Reg. 5547987Status 708Registered
Filing date
Status date
Registration date
Aug 28, 2018
Examiner
AVENT, TEAGUE A
Law office
TMO LAW OFFICE 126

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with WOODVILLE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Bruce S. Londa

Bruce S. Londa Norris McLaughlin P.A.7 Times Square21st FloorNew York, NY 10036-6524

Goods and services

ClassDescriptionStatusFirst use
006[ Rope fasteners consisting of formed metal components; rope clamping system consisting of formed metal components, namely, metal clamps; metal hardware and fastening devices of metal as connecting elements for ropes on solids, in particular on pipes, posts and walls, namely, metal screws and metal clamps; wire ropes, cordage made of metal; shaped metal portions for supporting a playground structure; wire for ropes; thimbles of metal for ropes and cables; metal building components in the form of slabs; metal building materials in the form of slabs ]SECTION 71 - CANCELLED—
019[ Building boards of wood or bamboo resin, namely, slabs and wall panels ]SECTION 71 - CANCELLED—
022[ Ropes; synthetic ropes; commercial nets; ] rope ladders; [ banister ropes; cordage made of hemp; cords made of plastics materials; cords made of textile fibres; ropes for tents; ] nets and ropes for play equipment, namely, for climbing, climbing hand over hand, clambering, mounting, swinging, balancing [ , seesawing, lying ]ACTIVE—
028Play equipment for playgrounds, amusement parks, camping grounds, holiday homes, open air baths, school yards, fairground, namely, swings, seesaws, slides, tunnels, climbing frames, jungle gyms, play houses, climbing units, all with added nets and ropes; playscapes for playgrounds, amusement parks, camping grounds, holiday homes, open air baths, school yards, consisting of play devices for climbing, climbing hand over hand, clambering, mounting, swinging, balancing, seesawing, lying, swaying, sliding; play equipment, namely, play equipment for climbing, climbing hand over hand, clambering, mounting, swinging, balancing, seesawing, lying, swaying, sliding; and play equipment, for sporting purposes, namely, play equipment for climbing, climbing hand over hand, clambering, mounting, swinging, balancing, [ seesawing, lying, ] swaying, sliding; [ climbers' harnesses; nets for sports; ] playground slides; play towers in the nature of outdoor play structures; play houses; play equipment, namely, climbing units; playground apparatus made of wood in the nature of outdoor play structures; playground apparatus made of plastics in the nature of outdoor play structures; playground apparatus made of metal in the nature of outdoor play structures; playground apparatus in the nature of outdoor play structuresACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 6, 2026INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Feb 6, 2026INPCINVALIDATION PROCESSED—
Aug 18, 2025INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Dec 18, 2024NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Dec 18, 2024C75PREGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.—
Dec 16, 2024APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
May 17, 2024ES75TEAS SECTION 71 & 15 RECEIVED—
Aug 28, 2023REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Feb 6, 2020TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Dec 28, 2018FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Dec 12, 2018FICSFINAL DISPOSITION NOTICE SENT TO IB—
Dec 12, 2018FIMPFINAL DISPOSITION PROCESSED—
Nov 28, 2018FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Aug 28, 2018R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 12, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jun 12, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 8, 2018GPNXNOTIFICATION PROCESSED BY IB—
May 23, 2018OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
May 23, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
May 23, 2018OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
May 8, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 4, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 4, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 3, 2018ALIEASSIGNED TO LIE—
Apr 26, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 16, 2018RFNPREFUSAL PROCESSED BY IB—
Feb 1, 2018RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Feb 1, 2018RFRRREFUSAL PROCESSED BY MPU—
Jan 25, 2018RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 24, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 23, 2018MAFRAPPLICATION FILING RECEIPT MAILED—
Jan 17, 2018DOCKASSIGNED TO EXAMINER—
Jan 17, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 11, 2018REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance