USPTO serial 79225266
PIXEL
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Dec 31, 2024
- Examiner
- TOOLEY, DAVID E
- Law office
- FILE REPOSITORY (FRANCONIA)
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with PIXEL?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Nicholas D Wells
Nicholas D Wells Legends Law Group330 Main St.Kaysville, UT 84037UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Metal windows; metal terrace windows; metal roller shutters; metal exterior blinds; metal doors; metal balcony doors; metal terrace doors; metal shutters; metal windowsills; metal gates; metal garage doors; metal door and window frames; parts of windows, of metal, namely, crank handles, slatted shutters; parts of roller shutters of metal, namely, fittings of metal for roller shutters; parts of exterior blinds, of metal, namely, crank handles; parts of doors, of metal, namely, metal beams; parts of shutters, of metal, namely, crank handles; building profiles, of metal; window profiles, of metal; roller shutter profiles, of metal; exterior blinds profiles, of metal; door profiles, of metal; shutter profiles, of metal; building fittings, of metal, namely, cladding of metal for building; window fittings, of metal; roller shutter fittings, of metal; outdoor blinds fittings, of metal; door fittings, of metal; shutter fittings, of metal; metal building materials, namely, stair nosing of metal, metal canopies, metal wall partitions; building structures, of metal, namely, building panels; curtain walls, of metal; partitions for building, of metal; prefabricated sunrooms of metal | ACTIVE | — |
| 019 | Windows, not of metal; balcony windows, not of metal; terrace windows, not of metal; roller shutters, not of metal or textile; outdoor blinds, not of metal and not of textile; doors, not of metal; balcony doors, not of metal; terrace doors, not of metal; shutters, not of metal; windowsills, not of metal; gates, not of metal; garage doors, not of metal; door and window frames, not of metal; parts of windows, not of metal, namely, nonmetal window cranks; parts of roller shutters, not of metal, namely, nonmetal crank handles; parts of outdoor blinds, not of metal, namely, nonmetal blind cranks; parts of doors for buildings, not of metal, namely, adjusters for adjusting the height of a door, beams; parts of shutters, not of metal, namely, adhesive patches for repairing non-metal window shutters; building materials, not of metal, namely, building profiles, not of metal; window profiles, not of metal, roller shutter profiles, not of metal, outdoor blinds profiles, not of metal, door profiles, not of metal, and shutter profiles, not of metal; building materials, not of metal, namely, fiberglass panels; building structures, not of metal, namely, building panels not of metal; curtain walls, not of metal; partitions for building, not of metal; prefabricated sunrooms not of metal; glass for building; window glass for building; window panes; glazed units in the nature of glazed nonmetal windows | ACTIVE | — |
| 020 | Window fittings, not of metal; roller shutter fittings, not of metal; blinds fittings, not of metal; door fittings, not of metal; shutter fittings, not of metal | ACTIVE | — |
| 037 | Construction information, namely, building materials information; building construction supervision; building construction; assembly, in the nature of installation and repair of windows; assembly in the nature of installation and repair of balcony windows; assembly in the nature of installation and repair of terrace windows; assembly in the nature of installation and repair of roller shutters; assembly in the nature of installation and repair of blinds; assembly in the nature of installation and repair of doors; assembly in the nature of installation and repair of balcony doors; assembly in the nature of installation and repair of terrace doors; assembly in the nature of installation and repair of shutters; assembly in the nature of installation and repair of windowsills; assembly in the nature of installation and repair of gates; assembly in the nature of installation and repair of garage doors; assembly in the nature of installation and repair of door and window frames; assembly in the nature of installation and repair of parts of windows; assembly in the nature of installation and repair of parts of roller shutters; assembly in the nature of installation and repair of parts of blinds; assembly in the nature of installation and repair of parts of doors; assembly in the nature of installation and repair of parts of shutters; assembly in the nature of installation and repair of building profiles; assembly in the nature of installation and repair of window profiles; assembly in the nature of installation and repair of roller shutter profiles; assembly in the nature of installation and repair of blinds profiles; assembly in the nature of installation and repair of door profiles; assembly in the nature of installation and repair of shutter profiles; assembly in the nature of installation and repair of building fittings; assembly in the nature of installation and repair of window fittings; assembly in the nature of installation and repair of roller shutter fittings; assembly in the nature of installation and repair of blinds fittings; assembly in the nature of installation and repair of door fittings; assembly in the nature of installation and repair of shutter fittings; assembly in the nature of installation and repair of building structures; assembly in the nature of installation and repair of curtain walls; assembly in the nature of installation and repair of partitions for building; assembly in the nature of installation and repair of prefabricated constructions, namely, sunrooms; assembly in the nature of installation and repair of glass for building; assembly in the nature of installation and repair of window glass for building; assembly in the nature of installation and repair of window panes; assembly in the nature of installation and repair of glazed units being windows | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by OKNOPLAST IP MANAGEMENT SPÓLKA Z OGRANICZONA ODPOWIEDZIALNOSCIA SPÓLKA KOMANDYTOWA
- Other trademarks owned by OKNOPLAST IP MANAGEMENT SPÓLKA Z OGRANICZONA ODPOWIEDZIALNOSCIA SPÓLKA KOMANDYTOWA
- Other trademarks owned by OKNOPLAST IP MANAGEMENT SPÓLKA Z OGRANICZONA ODPOWIEDZIALNOSCIA SPÓLKA KOMANDYTOWA
- Other trademarks in Class 006
- Other trademarks in Class 019
- Other trademarks in Class 020
- Other trademarks in Class 037
- Similar marks named PIXEL
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 26, 2025 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jun 18, 2025 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| Jun 18, 2025 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| Mar 31, 2025 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Dec 31, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Dec 31, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Nov 12, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Nov 12, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 23, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Oct 2, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 1, 2024 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Apr 26, 2024 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Oct 25, 2023 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Apr 7, 2023 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Apr 7, 2023 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Apr 7, 2023 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Feb 3, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 3, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 3, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 5, 2022 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 5, 2022 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 5, 2022 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 7, 2022 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Jul 5, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 24, 2022 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Dec 3, 2021 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Oct 18, 2021 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Apr 1, 2021 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Oct 1, 2020 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Mar 27, 2020 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Sep 27, 2019 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Jul 12, 2019 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jun 26, 2019 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jun 26, 2019 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Apr 11, 2019 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Mar 25, 2019 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Sep 24, 2018 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Sep 24, 2018 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Sep 24, 2018 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Aug 22, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 22, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 21, 2018 | ALIE | ASSIGNED TO LIE | — |
| Jul 31, 2018 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 24, 2018 | RFNT | REFUSAL PROCESSED BY IB | — |
| Feb 2, 2018 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Feb 2, 2018 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jan 30, 2018 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 30, 2018 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jan 29, 2018 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 26, 2018 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 26, 2018 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jan 25, 2018 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |