Drawing for TERRALINK

USPTO serial 79225734

TERRALINK

Reviewed by CopyMark Law Group

Reg. 5747918Status 709
Filing date
Status date
Registration date
May 14, 2019
Examiner
DICKSON, RACHAEL
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with TERRALINK?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

John J. O'Malley

JOHN J. O'MALLEY VOLPE AND KOENIG, P.C.30 SOUTH 17TH STREETSUITE 1800PHILADELPHIA, PA 19103

Goods and services

ClassDescriptionStatusFirst use
006Common metals and their alloys, unwrought or semi-wrought; building materials of metal, namely, metal reinforcement materials for building, metal countertops for further installation, composite panels composed primarily of metal, metal molds for forming metal wall panels and pre-fabricated architectural columns, metal soffits, metal cross-beams; transportable buildings of metal; materials of metal for railway tracks; non-electric cables and wires of metal; ironmongery and small items of metal hardware, namely, brackets of metal for building, locks of metal, other than electric, pipe muffs of metal, rivets of metal, door bolts of metal, junctions of metal for pipes, rods of metal for brazing and welding, knobs of metal, cables of metal, non-electric, collars of metal for fastening pipes, tiles of metal for building, hinges of metal, ropes of metal, girders of metal; pipes of metal; ores of metal; prefabricated construction elements of metal, namely, platforms and modular buildings; structures of metal, namely, platform, crossbeams, pillars, framework for stabilizing the earth by means of mechanical effects; structures of metal, namely, platform, crossbeams, pillars, framework for earth retention; retaining walls of metal; reinforcing materials of metal for building civil engineering structures; panels of metal for building; panels of metal for forming a cover for mechanically-stabilized land structures; panels of metal for forming a cover for earth stabilization structures by means of mechanical effect; ground nails of common metal; bars of common metal for further manufacture; metal, steel and iron strips for further manufacture, nails of metal, bars of metal for further manufacture, and plates of metal, namely, sheet metal plates for construction of buildings and civil engineering structuresSECTION 71 - CANCELLED—
037Construction, namely, construction of buildings, construction of roads, construction of bridges, construction of masonry and portable walls and structures; installation of prefabricated building elements, building structures and industrial sites; construction services, namely, construction planning; construction of public works, namely, road, bridges and canals; construction of civil engineering structures, namely, roads, bridges, masonry walls, portable walls, excavation services, drilling of pilot holes, drilling of wells, drilling of trenches, digging of walls and tunnels; construction, repair, maintenance, and demolition of buildings and civil engineering structures, namely, roads, bridges, masonry walls, portable walls; construction, maintenance and repair of roads, tracks, runways, bridges, bridge abutments, stabilized land structures, earth stabilization structures by means of mechanical effect, earth stabilization devices, embankments, retaining walls, dikes, tunnels, gutters, enclosures, reservoirs, tanks, silos and historical monuments; injection of products into the ground to consolidate and seal the ground; installation of reinforcements and ties for strengthening the ground; construction and installation of cladding on building structures and retaining structures; earthmoving; land clearing; dredging; construction supervision; rental of construction equipment; buildings, roads, bridges, masonry and portable walls construction information; buildings, roads, bridges, masonry and portable walls repair informationSECTION 71 - CANCELLED—
042Scientific and technological services, namely, scientific research, analysis and testing in the field of buildings, roads, bridges, masonry and portable walls construction as well as research and design services relating thereto in the field of buildings, roads, bridges, masonry and portable walls construction; industrial analysis, namely, analysis of buildings, roads, bridges and wall structures and analysis of soils and subsoils to assure compliance with industry standards and industrial research services in the field of buildings, roads, bridges, masonry and portable walls construction; engineering services in the field of construction; analysis, namely, soil and subsoil analysis, analysis of buildings, roads, bridges and wall structures in the field of construction, prestressing, cabled structures, support structures; analysis of soils and subsoils for the structure of buildings and civil engineering structures, land, soils, subsoils, topographic and technical surveying for the structure of buildings and civil engineering structures; consulting in civil engineering and industrial engineering in the fields of ground stabilisation and sanitation; consulting in civil engineering and industrial engineering in the fields of sealing and protection against fire and rust; technical advice, namely, technical consultancies and scientific studies in relation with the operation of the following products: common metals and their alloys, building materials of metal, transportable buildings of metal, materials of metal for railway tracks, non-electric cables and wires of metal, ironmongery and small items of metal hardware, pipes of metal, ores, prefabricated construction elements, structures for stabilizing the earth by means of mechanical effect, structures for earth retention, retaining walls, reinforcing materials for building civil engineering structures, panels for building, panels for forming a cover for mechanically stabilized land structures, panels for forming a cover for earth stabilization structures by means of mechanical effect, ground nails, bars of metal, strips, nails, bars and plates of metal; technical advice, namely, technical consultancies and scientific studies in relation with the operation of the following services: construction, repair, installation services, construction services, construction work, public works, civil engineering structures, drilling of pilots, wells, trenches, walls or tunnels, construction, repair, maintenance and demolition of buildings and civil engineering structures, construction, maintenance and repair of roads, tracks, runways, bridges, bridge abutments, stabilized land structures, earth stabilization structures by means of mechanical effect, earth stabilization devices, embankments, retaining walls, dikes, tunnels, gutters, enclosures, reservoirs, tanks, silos and historical monuments, injection of products into the ground to consolidate and seal the ground, installation of reinforcements and ties for strengthening the ground, construction and installation of cladding on building structures and retaining structures, earthmoving, land clearing, dredgingSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 28, 2026INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Nov 28, 2025C71TCANCELLED SECTION 71—
Nov 22, 2024NREPNEW REPRESENTATIVE AT IB RECEIVED—
May 14, 2024REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Nov 8, 2019NREPNEW REPRESENTATIVE AT IB RECEIVED—
Sep 27, 2019FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Sep 5, 2019FICSFINAL DISPOSITION NOTICE SENT TO IB—
Sep 5, 2019FIMPFINAL DISPOSITION PROCESSED—
Aug 14, 2019FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
May 14, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 26, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 26, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 22, 2019GPNXNOTIFICATION PROCESSED BY IB—
Feb 6, 2019OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Feb 6, 2019OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Feb 6, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jan 24, 2019PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jan 23, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 11, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 11, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 11, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 5, 2018GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 5, 2018GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 5, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 7, 2018XAECEXAMINER'S AMENDMENT ENTERED—
Nov 7, 2018GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Nov 7, 2018GNEAEXAMINERS AMENDMENT E-MAILED—
Nov 7, 2018CNEAEXAMINERS AMENDMENT -WRITTEN—
Oct 4, 2018XAECEXAMINER'S AMENDMENT ENTERED—
Oct 4, 2018GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Oct 4, 2018GNEAEXAMINERS AMENDMENT E-MAILED—
Oct 4, 2018CNEAEXAMINERS AMENDMENT -WRITTEN—
Oct 3, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 3, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 30, 2018ALIEASSIGNED TO LIE—
Sep 20, 2018ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Sep 18, 2018GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Sep 18, 2018GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Sep 18, 2018CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 24, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 23, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 23, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 16, 2018RFNTREFUSAL PROCESSED BY IB—
Feb 23, 2018RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Feb 23, 2018RFRRREFUSAL PROCESSED BY MPU—
Feb 15, 2018RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Feb 14, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 14, 2018DOCKASSIGNED TO EXAMINER—
Feb 9, 2018MAFRAPPLICATION FILING RECEIPT MAILED—
Feb 5, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Feb 1, 2018REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance