USPTO serial 79225808
CONTITITE
Reviewed by CopyMark Law Group
Reg. 5682583Status 404
- Filing date
- Status date
- Registration date
- Feb 26, 2019
- Examiner
- BROWN, TRICIA
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with CONTITITE?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
John M. Cone
John M. Cone Ferguson Braswell Fraser Kubasta PC2500 Dallas Parkway, Suite 600Plano, TX 75093UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 001 | Fire extinguishing compositions; flame-retardant compositions, namely, flame retarding compositions; chemical substances for use in the field of fire protection and fire prevention, namely, chemical sealants used for buildings which penetrate through walls, floors, and ceilings for fire prevention | SECTION 70 - CANCELLED | — |
| 017 | Raw or semi-worked rubber, polymer materials vulcanizable to rubber, namely, uncured synthetic rubber for use in the manufacture of a wide variety of goods; heat-expandable polymer materials vulcanizable to rubber, namely, uncured synthetic rubber for use in the manufacture of a wide variety of goods, extruded or injection moulded sleeves, namely, insulating sleeves for power lines, and blocks of these materials, namely, padding materials of rubber, for holding cables in conduits and for filling cable conduits | SECTION 70 - CANCELLED | — |
| 037 | Construction of buildings; repair, installation of sealing apparatus for cables in conduits for industrial purposes; repair, installation of sealing apparatus for use in engineered constructions, buildings, offshore-constructions, trains, boats, tunnels, nuclear power plants and for road sealing, pavement sealing, for vessels, aircrafts, railway rolling stocks, power distribution, power generators, industrial furnaces and chemical plants | SECTION 70 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Beele Engineering B.V.
- Other trademarks owned by Beele Engineering B.V.
- Other trademarks owned by Beele Engineering B.V.
- Other trademarks in Class 001
- Other trademarks in Class 017
- Other trademarks in Class 037
- Similar marks named CONTITITE
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 19, 2021 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Jun 19, 2021 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Jul 12, 2019 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jun 22, 2019 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jun 22, 2019 | FIMP | FINAL DISPOSITION PROCESSED | — |
| May 26, 2019 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Feb 26, 2019 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Dec 11, 2018 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Dec 11, 2018 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 7, 2018 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Nov 21, 2018 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Nov 21, 2018 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Nov 21, 2018 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Nov 1, 2018 | ALIE | ASSIGNED TO LIE | — |
| Oct 18, 2018 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 18, 2018 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Oct 18, 2018 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Oct 18, 2018 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Oct 18, 2018 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Oct 9, 2018 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 9, 2018 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Oct 9, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 9, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 9, 2018 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 27, 2018 | RFNT | REFUSAL PROCESSED BY IB | — |
| Apr 9, 2018 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Apr 9, 2018 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Apr 3, 2018 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 2, 2018 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 28, 2018 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 10, 2018 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Feb 6, 2018 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 1, 2018 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |