USPTO serial 79226061
DYSFRAME
Reviewed by CopyMark Law Group
Reg. 5777961Status 709
- Filing date
- Status date
- Registration date
- Jun 18, 2019
- Examiner
- PODESTA, GIDETTE
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with DYSFRAME?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Cynthia A. Moyer
Cynthia A. Moyer Fredrikson & Byron, P.A.200 South Sixth StreetSuite 4000Minneapolis, MN 55402Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Common metals and their alloys; building materials of metal for conveyor belts, supporting structures, maintenance walkways, namely, metal bolts, awnings of metal, reinforcing materials of metal, drywall corner bead of metal; buildings, transportable, of metal; railway material of metal for railway construction; non-electric cables and wires of common metal; ironmongery, namely, metal hardware in the nature of springs, nuts of metal, pulleys, carabiners of metal, nuts, washers, metal brackets for general use; small items of metal hardware, namely, springs, nuts of metal, pulleys, carabiners of metal, nuts, washers, metal brackets for general use; pipes and tubes of metal; safes; metal products, namely, steel structures in the nature of pipes, sheets, rails, rods for conveyor installations; ores of metal | SECTION 71 - CANCELLED | — |
| 019 | Building materials, not of metal for conveyor belts, supporting structures, maintenance walkways, namely, reinforcing materials not of metal, drywall corner bead; rigid pipes, not of metal, for building; asphalt, pitch and bitumen; buildings, transportable, not of metal; monuments, not of metal | SECTION 71 - CANCELLED | — |
| 037 | Plant installation and steel structure construction work, namely, construction of steel fabrications for conveying installations in the nature of construction of buildings made of steel, steel structure construction works for conveying installations; construction consultancy; installation for manufacturing plants in the nature of installation of conveyor belts, supporting structures in the nature of parts for conveyor belts, conveyor belt components, and installation of machines used for the construction of maintenance walkways and steel structure construction work; assembly services being the installation of construction machines; reconditioning of machines that are worn or partially destroyed or reconditioning of industrial machinery; servicing of machines and installations in the nature of construction machines; repair of machines in the nature of construction machines and installations | SECTION 71 - CANCELLED | — |
| 040 | Apparatus building, and container construction in the nature of custom manufacturing of conveyor belts, supporting structures in the nature of parts for conveyor belts, and custom manufacturing of machines used for paving maintenance walkways; welding; treatment of materials, namely, custom manufacture of steel beams; metal treatment services, custom manufacture of metal structures, custom manufacture of locks, blacksmithing, provided in the course of welding, namely, treatment of metal; metal treating, in particular in the fields of plant installation and steel structure construction works; welding for others | SECTION 71 - CANCELLED | — |
| 042 | Scientific and technological services and research and design relating thereto, namely, design services related to the design of manufacturing machinery, conveyor belts, supporting structures in the nature of conveyor belt component parts, maintenance walkways; industrial analysis and research services in the field of industrial manufacturing machinery, namely, testing, analysis, and evaluation of the manufacturing machinery of others to assure compliance with industry standards; design and development of computer hardware and software; engineering services, namely, engineering design services, engineering for industrial manufacturing operations; construction drafting and consultancy; conducting engineering surveys; technical project studies in the field of engineering, namely, conducting feasibility studies in the field of engineering; material testing | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Hösker, Torsten
- Other trademarks owned by Hösker, Torsten
- Other trademarks owned by Hösker, Torsten
- Other trademarks in Class 006
- Other trademarks in Class 019
- Other trademarks in Class 037
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named DYSFRAME
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 2, 2026 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jan 2, 2026 | C71T | CANCELLED SECTION 71 | — |
| Jun 18, 2024 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Mar 15, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 9, 2021 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 18, 2019 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Sep 27, 2019 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Sep 26, 2019 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Sep 18, 2019 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jun 18, 2019 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 2, 2019 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Apr 2, 2019 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 29, 2019 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Mar 13, 2019 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Mar 13, 2019 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Mar 13, 2019 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Feb 22, 2019 | ALIE | ASSIGNED TO LIE | — |
| Feb 6, 2019 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 5, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 5, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 5, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 20, 2018 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 20, 2018 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 20, 2018 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 27, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 26, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 26, 2018 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 16, 2018 | RFNT | REFUSAL PROCESSED BY IB | — |
| Feb 23, 2018 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Feb 23, 2018 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Feb 15, 2018 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Feb 14, 2018 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 13, 2018 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Feb 7, 2018 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 7, 2018 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 1, 2018 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |