Drawing for COSFRAME

USPTO serial 79226337

COSFRAME

Reviewed by CopyMark Law Group

Reg. 5796463Status 709
Filing date
Status date
Registration date
Jul 9, 2019
Examiner
RIRIE, VERNA BETH
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with COSFRAME?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Cynthia Moyer

Cynthia Moyer Fredrikson & Byron, P.A.200 South Sixth StreetSuite 4000Minneapolis, MN 55402

Goods and services

ClassDescriptionStatusFirst use
006Common metals and their alloys; building materials of metal for conveyor belts, supporting structures, maintenance walkways, namely, metal bolts, awnings of metal, reinforcing materials of metal, drywall corner bead of metal; buildings, transportable, of metal; railway material of metal for railway construction; non-electric cables and wires of common metal; ironmongery, namely, metal hardware in the nature of springs, nuts of metal, pulleys, carabiners of metal, nuts, washers, metal brackets for general use; small items of metal hardware, namely, springs, nuts of metal, pulleys, carabiners of metal, nuts, washers, metal brackets for general use; pipes and tubes of metal; safes; metal products, namely, steel structures in the nature of pipes, sheets, rails, rods for conveyor installations; ores of metalSECTION 71 - CANCELLED—
019Building materials, not of metal for conveyor belts, supporting structures, maintenance walkways, namely, reinforcing materials not of metal, drywall corner bead; rigid pipes, not of metal, for building; asphalt, pitch and bitumen; buildings, transportable, not of metal; monuments, not of metalSECTION 71 - CANCELLED—
037Plant installation and steel structure construction work, namely, construction of steel fabrications for conveying installations in the nature of construction of buildings made of steel, steel structure construction works for conveying installations; construction consultancy; installation for manufacturing plants in the nature of installation of conveyor belts, supporting structures in the nature of parts for conveyor belts, conveyor belt components, and installation of machines used for the construction of maintenance walkways and steel structure construction work; assembly services being the installation of construction machines; reconditioning of machines that are worn or partially destroyed or reconditioning of industrial machinery; servicing of machines and installations in the nature of construction machines; repair of machines in the nature of construction machines and installationsSECTION 71 - CANCELLED—
040Apparatus building, and container construction in the nature of custom manufacturing of conveyor belts, supporting structures in the nature of parts for conveyor belts, and custom manufacturing of machines used for paving maintenance walkways; welding; treatment of materials, namely, custom manufacture of steel beams; metal treatment services, custom manufacture of metal structures, custom manufacture of locks, blacksmithing, provided in the course of welding, namely, treatment of metal; metal treating, in particular in the fields of plant installation and steel structure construction works; welding for othersSECTION 71 - CANCELLED—
042Scientific and technological services and research and design relating thereto, namely, design services related to the design of manufacturing machinery, conveyor belts, supporting structures in the nature of conveyor belt component parts, maintenance walkways; industrial analysis and research services in the field of industrial manufacturing machinery, namely, testing, analysis, and evaluation of the manufacturing machinery of others to assure compliance with industry standards; design and development of computer hardware and software; engineering services, namely, engineering design services, engineering for industrial manufacturing operations; construction drafting and consultancy; conducting engineering surveys; technical project studies in the field of engineering, namely, conducting feasibility studies in the field of engineering; material testingSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 23, 2026INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jan 23, 2026C71TCANCELLED SECTION 71—
Jul 9, 2024REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Mar 15, 2024NREPNEW REPRESENTATIVE AT IB RECEIVED—
Oct 9, 2021NREPNEW REPRESENTATIVE AT IB RECEIVED—
Nov 15, 2019FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Oct 28, 2019FICSFINAL DISPOSITION NOTICE SENT TO IB—
Oct 28, 2019FIMPFINAL DISPOSITION PROCESSED—
Oct 9, 2019FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jul 9, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 23, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 23, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 19, 2019GPNXNOTIFICATION PROCESSED BY IB—
Apr 3, 2019OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 3, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 3, 2019OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Mar 16, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 19, 2019CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Feb 19, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 19, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 5, 2019TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Feb 5, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 5, 2018GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 5, 2018GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 5, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 25, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 25, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 18, 2018ALIEASSIGNED TO LIE—
Jun 4, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 24, 2018RFNTREFUSAL PROCESSED BY IB—
Mar 2, 2018RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 2, 2018RFRRREFUSAL PROCESSED BY MPU—
Feb 25, 2018RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Feb 24, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 13, 2018MAFRAPPLICATION FILING RECEIPT MAILED—
Feb 9, 2018DOCKASSIGNED TO EXAMINER—
Feb 9, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Feb 8, 2018REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance