USPTO serial 79228401
Reviewed by CopyMark Law Group
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Stacy L. Emhoff
Stacy L. Emhoff Walker & Jocke Co., LPA231 South BroadwayMedina, OH 44256United States| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Sheets and plates of metal; Sheets of aluminum; Steel sheets; Roofing sheets of metal; Flashing of metal for building; Guard rails of metal; Roofing tiles of metal; Roof gutters of metal; Canopies of metal incorporating fixed or movable slats; Step ladders of metal; Chimney pots of metal; Chimneys of metal; Metal shackles; Gutter connection pieces of metal; Gutter brackets of metal; Small items of metal hardware namely nuts, washers, springs; Roof components and roofing materials of metal, namely roofing panels, roofing and roofing hips; Metal chimney blocks; Chimney terminals in the nature of cowls and caps of metal; Casings of metal; Tubbing of metal; Lock casings of metal; Chimney linings of metal; Metallic gutters; Galvanized steel sheets; Metal linings for use in construction; Guttering of aluminum; Guttering of metal for the collection of rain-water; Guttering of metal for the dispersal of rain-water; Clad steel plates and sheets; Tiles of metal; Cramps of metal, crampons | ACTIVE | — |
| 037 | Roofing services; roofing installation; installation of insulating materials in buildings, roofs and structures; insulation of roofing; insulating of internal and external walls, ceilings and roofs; construction information; resurfacing of roofs; maintaining and repair of roof guttering; building maintenance and repair; construction consultancy; installation of roof timbering; building construction supervision; application of waterproof coatings for roofs; renovation and repair of buildings; abrasive cleaning of metallic surfaces; dismantling of roofs; building construction services; building construction and repair; slating and tiling; tile laying, bricklaying or block laying | ACTIVE | — |
| 039 | Transport of building materials; warehouse storage | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 8, 2026 | CORV | REVIEW OF CORRESPONDENCE COMPLETE - INFORMATION MADE OF RECORD | — |
| Nov 4, 2025 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Nov 4, 2025 | C75A | REGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Oct 9, 2025 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| Sep 18, 2025 | PR75 | POST REGISTRATION ACTION MAILED - SEC. 71 & 15 | — |
| Sep 12, 2025 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| Mar 14, 2025 | PR75 | POST REGISTRATION ACTION MAILED - SEC. 71 & 15 | — |
| Mar 10, 2025 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Oct 17, 2024 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Dec 9, 2023 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Nov 4, 2023 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Mar 1, 2019 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Feb 8, 2019 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Feb 8, 2019 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jan 30, 2019 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Oct 30, 2018 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Aug 14, 2018 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 11, 2018 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jul 25, 2018 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jul 25, 2018 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jul 25, 2018 | NPUB | NOTICE OF PUBLICATION | — |
| Jun 29, 2018 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 11, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 11, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 11, 2018 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 20, 2018 | RFNT | REFUSAL PROCESSED BY IB | — |
| Apr 20, 2018 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 20, 2018 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 12, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 12, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 12, 2018 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 2, 2018 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Apr 2, 2018 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Mar 29, 2018 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 28, 2018 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 25, 2018 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 16, 2018 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Mar 12, 2018 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 8, 2018 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |