Drawing for BATTOLYSER

USPTO serial 79230523

BATTOLYSER

Reviewed by CopyMark Law Group

Reg. 5736080Status 709
Filing date
Status date
Registration date
Apr 30, 2019
Examiner
TANNER, MICHAEL R
Law office
TMO LAW OFFICE 119

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with BATTOLYSER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
009Commercial, scientific and educational apparatus and instruments, namely, Rechargeable batteries, Rechargeable batteries containing integrated electrolysers, Power supplies containing integrated electrolysers; Apparatus and instruments for conduction, distribution, conversion, storage, regulation and control of electric power, namely, Rechargeable batteries, Rechargeable batteries containing integrated electrolysers, Power supplies containing integrated electrolysers, Electric control panels for use with rechargeable batteries, rechargeable batteries containing integrated electrolysers, and power supplies containing integrated electrolysers, Electronic regulating and control devices for the operation of rechargeable batteries, rechargeable batteries containing integrated electrolysers, and power supplies containing integrated electrolysers, Apparatus and instruments for conveying, distributing, transforming, storing, regulating or controlling electric current, Electrical leak detection hardware and operating software in the nature of hydrogen and oxygen leak detectors for use with electricity generation equipment, Electric control panels and circuits for use with rechargeable batteries, rechargeable batteries containing integrated electrolysers, and power supplies containing integrated electrolysers to ensure proper and safe operation of such devicesSECTION 71 - CANCELLED—
037Installation of power generating apparatus, namely, Installation of electric generation equipment comprised of rechargeable batteries, rechargeable batteries containing integrated electrolysers, and power supplies containing integrated electrolysers for others; Maintenance, reconditioning and repair of electrical power generating apparatus and installations comprised of rechargeable batteries, rechargeable batteries containing integrated electrolysers, and power supplies containing integrated electrolysers; Providing information relating to the repair or maintenance of storage materials, namely, Providing an Internet website that features information about the maintenance and repair of electrical power generating and storage apparatus and installations comprised of rechargeable batteries, rechargeable batteries containing integrated electrolysers, and power supplies containing integrated electrolysersSECTION 71 - CANCELLED—
040Treatment of materials for the conversion, generating, regulating, control and storage of electric current, namely, Generation of hydrogen and oxygen for others by means of electrolysis with an integrated battery and electrolyser, Production of electricity for others by means of integrated battery and electrolyser; Treating materials for the conversion of electric power to separate gas streams of hydrogen and oxygen, namely, Generation of electricity for others by means of integrated battery and electrolyser, Production of hydrogen and oxygen for others by means of electrolysis; Treating materials for the conversion of electric power to separate gas streams of hydrogen and oxygen, namely, Generation of hydrogen and oxygen gas and electricity for others; providing information about the treatment of materials, namely, Providing technical information in the field of power generation by means of batteries containing integrated electrolysers and power supplies containing integrated electrolysersSECTION 71 - CANCELLED—
041Education and training relating to industrial research in the field of conduction, generating, conversion and storage of electric power, namely, Training in the use and operation of electric power generation equipment and batteries and devices for storing such electric power, Training in the use and operation of rechargeable batteries containing integrated electrolysers and power supplies containing integrated electrolysers for the generation of electricity, hydrogen and oxygen; Education in the field of power supply, namely, Conducting classes, seminars, conferences and workshops in the field of electricity, hydrogen and oxygen generation by means of rechargeable batteries containing integrated electrolysers and power supplies containing integrated electrolysers; Arranging of presentations and seminars for educational purposes, namely, Conducting seminars, conferences and workshops in the field of electrical power generation by means of rechargeable batteries containing integrated electrolysers and power supplies containing integrated electrolysers, Conducting seminars, conferences and workshops in the field of electricity, hydrogen and oxygen generation by means of rechargeable batteries containing integrated electrolysers and power supplies containing integrated electrolysersSECTION 71 - CANCELLED—
042Science and technology services, as well as related research and design services, * including energy and energy transition research, energy efficiency consultancy, design and development of energy generation and energy storage systems, alternative energy generation technology consultancy services and energy technology engineering services * [, namely, conducting scientific research for others regarding electrical power generation produced via electrolysis, batteries containing integrated electrolysers and power supplies containing integrated electrolysers, Design and development of new products for others featuring pressurized or ambient pressure alkaline electrolysers combined or integrated with rechargeable battery devices ] ; Industrial analysis and * industrial * research services, * in particular focusing on energy and energy transition * [, namely, conducting industrial research for others in the field of electrical power generation produced via electrolysis, batteries containing integrated electrolysers and power supplies containing integrated electrolysers, Design and development of new products for others featuring pressurized or ambient pressure alkaline electrolysers combined or integrated with rechargeable battery devices ] ; Design and development of computer systems and software programs for others for use with power generation equipment featuring batteries containing integrated electrolysers and power supplies containing integrated electrolysers; consultancy services in the field of technological development * in the field of power generation and storage *, namely, Providing scientific research information about electrical power produced via electrolysis, batteries containing integrated electrolysers and power supplies containing integrated electrolysersSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 14, 2026INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Nov 14, 2025C71TCANCELLED SECTION 71—
Apr 30, 2024REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Apr 12, 2024INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE—
Apr 2, 2024INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Sep 5, 2023NURCNOTICE OF UPDATED REGISTRATION CONFIRMATION EMAILED—
Aug 2, 2023COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Jun 20, 2023WDRLOTQR WITHDRAWAL FROM PUBLICATION—
Jun 6, 2023LIMELIMITATION FROM THE IB EXAMINED AND ENTERED—
Jun 5, 2023COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Mar 19, 2023LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Aug 27, 2022ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Jul 23, 2022CHLDCHANGE OF OWNER RECEIVED FROM IB—
Jul 23, 2022NREPNEW REPRESENTATIVE AT IB RECEIVED—
Sep 20, 2019FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Aug 29, 2019FICSFINAL DISPOSITION NOTICE SENT TO IB—
Aug 29, 2019FIMPFINAL DISPOSITION PROCESSED—
Jul 30, 2019FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Apr 30, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 21, 2019CHLDCHANGE OF OWNER RECEIVED FROM IB—
Feb 22, 2019GPNXNOTIFICATION PROCESSED BY IB—
Feb 12, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 12, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 23, 2019OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 23, 2019OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jan 23, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Dec 27, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 11, 2018XAECEXAMINER'S AMENDMENT ENTERED—
Dec 11, 2018GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Dec 11, 2018GNEAEXAMINERS AMENDMENT E-MAILED—
Dec 11, 2018CNEAEXAMINERS AMENDMENT -WRITTEN—
Nov 16, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 15, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 15, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 2, 2018RFNTREFUSAL PROCESSED BY IB—
May 15, 2018RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
May 15, 2018RFRRREFUSAL PROCESSED BY MPU—
May 9, 2018RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
May 8, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 7, 2018DOCKASSIGNED TO EXAMINER—
Apr 24, 2018MAFRAPPLICATION FILING RECEIPT MAILED—
Apr 20, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 19, 2018REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance