USPTO serial 79230806
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jeffrey B. Sladkus, Esq.
Jeffrey B. Sladkus, Esq. The Sladkus Law Group1397 Carroll DriveAtlanta, GA 30318UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Building materials of metal, namely, fascia, ceiling boards, wall panels, floor panels; metal containers for storage of vehicle keys; metal containers for transport; door frames of metal; balustrades of metal; armor-plating of metal for building; building materials, namely, grilles of metal; sash fasteners of metal for windows; door fasteners of metal; roof flashing of metal; roofing of metal; pre-fabricated steel buildings; pre-fabricated buildings of metal; buildings, transportable, of metal; door openers, non-electric, namely, door handles of metal; window stops of metal; door stops of metal; windows of metal; shutters of metal; door panels of metal; building panels of metal; jalousies of metal; gates of metal; doors of metal; armored doors of metal; wall claddings of metal for building; wainscotting of metal; wall linings of metal for building; linings of metal for building; window frames of metal; frames of metal for building; outdoor blinds of metal; partitions of metal for building; facade construction components of metal, namely, metal façade panels; curtain walling of metal; metal scaffolding for facades; cladding of metal for building, for facades; metal exterior roller blinds for guiding light; metal wallboards; metal cladding for building; metal surfacings in the nature of plates, sheets, and panels, all for building; facade elements of metal in the nature of metal panels, for building; metal hinges for doors and windows; metal components for doors, namely, metal hinges; ventilation grilles of metal for fitting in doors; metal roller doors having insulating properties; metal roller doors; doors and windows, of metal; door handles of metal; door jambs of metal; window openers, non-electric, namely, metal cranks for opening windows; window protection devices of metal, namely, metal gratings for windows; metal louvre window assemblies; window facades of metal; metal bars for metal railings; window sashes of metal; metal rolling window shutters; metal locks for windows; cladding panels of metal for wall construction; cladding panels of metal for building; metal hoarding; panels of metal for cladding on buildings | SECTION 71 - CANCELLED | — |
| 019 | Building materials, not of metal, namely, plastic pipe supports, wood boards, wood panels, glass panels; rigid pipes, not of metal, for building; monuments, not of metal; door frames, not of metal; balustrades, not of metal; roofing, not of metal; buildings, transportable, not of metal; pre-fabricated buildings, not of metal; windows, not of metal; plate glass windows for building; paving slabs, not of metal; slabs, not of metal, for building; framework, not of metal, for building; door panels, not of metal; building panels, not of metal; floors, not of metal; jalousies, not of metal; armored doors, not of metal; doors, not of metal; fences, not of metal; wainscotting, not of metal; cladding, not of metal, for building; shutters, not of metal; window frames, not of metal; casement windows, not of metal; stained-glass windows; building glass; window glass for building; insulating glass for building; facade construction components of non-metallic materials, namely, non-metal panels; non-metallic building facade elements, namely, non-metal panels; non-metal window facades in the nature of non-metal panels; non-metal panels for use as building facades; non-metal building fronts in the nature of framework; non-metal cladding for facades; non-metal frames for shop fronts; non-metal synthetic flooring materials for building; non-metal synthetic wall-claddings; wall panelling made of non-metallic materials; wall boards, not of metal; doors, gates, windows and window coverings in the nature of insect screens not of metal; non-metal cladding for construction and building; non-metal building sheets; glass panels for doors; non-metal roller doors having insulating properties; glazed doors, not of metal; glass in sheet form for use in doors; non-metal window screens; glass for building panels; non-metal panelling for use in building; building boards of plastics materials; plastic wallboards; facing panels of non-metallic materials; sheathing boards, not of metal; window glass; glass panels for building construction; non-metal glazed wall panels with non-metallic frames | SECTION 71 - CANCELLED | — |
| 037 | Building construction; building facade construction; installation of doors, gates, windows and window coverings of metal; installation of wallboards, fixtures and fittings for buildings; repair services for the facades, fixture and fittings of buildings; construction consultancy; building construction information; installation of doors and windows; rental of construction equipment; erection of curtain walling; building construction and repair, namely, resurfacing of facades; building construction and repair, namely, redressing facades; application of protective coatings for buildings; application of coatings to buildings; remedial services for wall coverings, namely, repair of buildings; installation of doors and windows; installation of insulating glass in conservatories, windows, doors and greenhouses; replacement of windows; installation of heat insulation for windows; construction of diaphragm walls; installing wallboard * ; all the aforementioned services excluding services related to metal pipes, tubes, connections and piping for the energy industry * | SECTION 71 - CANCELLED | — |
| 042 | Architectural consultancy; industrial design; engineering; surveying; construction drafting; technical research in the field of building construction and engineering; scientific research; technological consultancy in the field of building construction and engineering * ; all the aforementioned services excluding services related to metal pipes, tubes, connections and piping for the energy industry * | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 13, 2026 | C71T | CANCELLED SECTION 71 | — |
| Nov 29, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Aug 27, 2024 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Sep 30, 2020 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Sep 14, 2020 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jan 31, 2020 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jan 14, 2020 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jan 14, 2020 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jan 14, 2020 | LIME | LIMITATION FROM THE IB EXAMINED AND ENTERED | — |
| Jan 14, 2020 | COC. | CORRECTION UNDER SECTION 7 - PROCESSED | — |
| Jan 14, 2020 | PLGL | ASSIGNED TO PARALEGAL | — |
| Nov 27, 2019 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Sep 12, 2019 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Aug 27, 2019 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 18, 2019 | ETOP | EXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED | — |
| May 6, 2019 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Feb 15, 2019 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Feb 4, 2019 | ETOF | EXTENSION OF TIME TO OPPOSE RECEIVED | — |
| Jan 8, 2019 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 8, 2019 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 19, 2018 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Nov 21, 2018 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 21, 2018 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Nov 21, 2018 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Nov 21, 2018 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Nov 21, 2018 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Oct 22, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 22, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 22, 2018 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 10, 2018 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 10, 2018 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jun 30, 2018 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jun 12, 2018 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jun 12, 2018 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jun 6, 2018 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jun 5, 2018 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 7, 2018 | RFWR | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW | — |
| May 6, 2018 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| May 5, 2018 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 1, 2018 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Apr 27, 2018 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 27, 2018 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 26, 2018 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |