Drawing for CC APTUS CONCRETE CONNECTIONS

USPTO serial 79231479

CC APTUS CONCRETE CONNECTIONS

Reviewed by CopyMark Law Group

Reg. 5706011Status 709
Filing date
Status date
Registration date
Mar 26, 2019
Examiner
VO, JULIE
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with CC APTUS CONCRETE CONNECTIONS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
006Metal building materials, namely, partitions, pillars, slabs, composite panels, door panels, floor panels, ceiling panels, roofing panels, wall panels, beams, pre-fabricated architectural columns, poles, posts, wall framing, fabricated metal components for building foundations, reinforcement materials of metal for building; structural metal joint connectors, namely, metal connectors used to join concrete building elements together; structural joint connectors of metal for hoses; connectors of metal for pipes; structural connectors of metal for tubes; structural metal joint connectors used to join panels together; accessories, parts and fittings for all the aforesaid goods, namely, metal clips for use in building and construction, metal boltsSECTION 71 - CANCELLED—
019Non-metallic building materials, namely, partitions, pillars, slabs, composite panels, door panels, floor panels, ceiling panels, roofing panels, wall panels, beams, pre-fabricated architectural columns, poles in the nature of concrete poles for use as building materials, posts, wall framing in the nature of non-metal window and door frames, non-metal components for building foundations in the nature of cementitious-based mastics for foundations of buildings; non-metallic reinforcements for concrete and wood building construction, namely, plates, rods and bars, and cladding; concrete; concrete building elements joined by metal connectors, namely, blocks, bricks, posts, slabs, panels; concrete blocks, panels and beams; concrete pipes; storage tanks made of masonry, bricks and concrete; storage tanks of masonry, brick and concrete; accessories, parts and fittings, namely, non-metal clips for use in building and construction that are sold as a unit with the aforesaid goodsSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 10, 2026INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Oct 10, 2025C71TCANCELLED SECTION 71—
Mar 26, 2024REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Sep 17, 2022ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Mar 5, 2021CHLDCHANGE OF OWNER RECEIVED FROM IB—
Aug 16, 2019FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jul 29, 2019FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jul 29, 2019FIMPFINAL DISPOSITION PROCESSED—
Jun 26, 2019FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Mar 26, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 8, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jan 8, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 19, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Nov 15, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 15, 2018XAECEXAMINER'S AMENDMENT ENTERED—
Nov 15, 2018GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Nov 15, 2018GNEAEXAMINERS AMENDMENT E-MAILED—
Nov 15, 2018CNEAEXAMINERS AMENDMENT -WRITTEN—
Sep 18, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 17, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 17, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 3, 2018ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 3, 2018REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jun 9, 2018RFNTREFUSAL PROCESSED BY IB—
May 24, 2018RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
May 24, 2018RFRRREFUSAL PROCESSED BY MPU—
May 22, 2018RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
May 21, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 15, 2018MAFRAPPLICATION FILING RECEIPT MAILED—
May 11, 2018DOCKASSIGNED TO EXAMINER—
May 11, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 10, 2018REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance