Drawing for DOKA

USPTO serial 79231498

DOKA

Reviewed by CopyMark Law Group

Reg. 5682694Status 706Registered
Filing date
Status date
Registration date
Feb 26, 2019
Examiner
AURAND, KYLE C
Law office
Historical data usage

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with DOKA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Michael J. Leonard

Michael J. Leonard Fox Rothschild LLP212 Carnegie Center, Suite 400Princeton, NJ 08540United States

Goods and services

ClassDescriptionStatusFirst use
006Formwork tables and components sold together therewith, made in whole or significant part of metal, for use in concrete construction, namely, wall formwork, slab, formwork, monolithic formwork, climbing formwork, load-bearing tower formwork, tunnel formwork, bridge formwork, column formwork, circular formwork, shaft formwork, dam formwork, single sided formwork, facade formwork, framed formwork, formwork tables; Construction formwork and scaffolding elements and components sold together therewith, made in whole or significant part of metal, used in concrete construction, namely, load-bearing and support structures as well as components thereof for formwork for use in concrete construction, in particular load-bearing scaffolds, load towers, shoring, adjusting supports, rails, props, struts, girders, washers, joists, braces, support heads, floor supports, frameworks; Scaffolds, structures and components sold together therewith, made in whole or significant part of metal, for use in construction, namely, safety and protection structures, climbing scaffolds, working structures, scaffold towers, stair towers, access structures in the nature of scaffolding access, manholes, stages, platforms, corbels, stands, guardrails, enclosures in the nature of scaffold housing, balustradings; Portable metal structures and components sold together therewith used for formwork; Bins, containers, and pallets made in whole or significant part of metal, used to transport formwork and scaffold supplies; Metal hardware and accessories used for the assembly, assembling aid, adjustment, locking, and disassembly of metal formwork and scaffolds, namely, wedges, cones, nuts, anchor plates, couplings, damps, fasteners, plugs, spindles, stays, bolts, sleeves, retainers, lugs, and ironmongery; Suspension anchors made in whole or significant part of metalACTIVE—
007Mechanical and pneumatic hoisting apparatus for moving formwork, load-bearing and support structures, scaffolding, and their components sold in connection therewith, horizontally, vertically, or inclinedACTIVE—
019Formwork and components sold together therewith, not made of metal, for use in concrete construction, namely, panels and formwork tables; Load-bearing and support structures and components sold together therewith, not made of metal, for use with formwork in concrete construction, namely, beams, stays, joists, profiles, platforms, stands, corbels, sheets, planks, balustradings, parapets, enclosures in the nature of scaffold housing; Bins, containers, and pallets, not made of metal, used to transport formwork and components sold therewith; accessories for the aforementioned goods, namely, plugs, sleeves, retainers, lugs, adapters, connectors; prefabricated building elements, namely, precast concrete parts; Formwork and components sold together therewith, not made of metal, for use in the production of prefabricated building elements, namely, precast concrete partsACTIVE—
037Installation and rental services for formwork, load-bearing and support structures, scaffolds, portable structures, construction transport aids, and components and accessories sold together therewith; Repair and maintenance services, namely, cleaning, preventive maintenance, overhaul and repair for formwork, load-bearing and support structures, scaffolds, portable structures, and construction transport aids; Construction supervision; Consultation services for the construction and planning of formwork engineering and concrete construction; all aforementioned services for third partiesACTIVE—
042Engineering and consulting in the field of formwork engineering, namely, planning, designing and developing of formwork, load-bearing and support structures and of scaffolds and components sold together therewith, , support of formwork projects; Consulting in the field of concrete engineering, namely, monitoring to ensure proper functioning, and examination of concrete maturity; designing and developing of non-downloadable computer software in the field of formwork engineering, namely, providing of non-downloadable software for formwork engineering; providing temporary use of non-downloadable software for inspecting, tracking and processing of customer and formwork specific data and documents via computer networks, intranet and internet; developing, installing and maintaining data processing programs for others for planning, administrating and use of formwork, load-bearing and support structures as well as of scaffolds and components thereof and of accessories therefore in the area of concrete construction; consulting services with respect to the use of the aforementioned data processing programs; all aforementioned services for third-partiesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 22, 2026RNWLINTERNATIONAL REGISTRATION RENEWED—
Jun 3, 2025NA15SEC. 15 ACKNOWLEDGEMENT - E-MAILED—
Jun 3, 2025NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Jun 3, 202515AKREGISTERED - SEC. 15 ACKNOWLEDGED—
Jun 3, 202571AGREGISTERED-SEC.71 ACCEPTED—
Jun 2, 2025APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Feb 15, 2025E15RTEAS SECTION 15 RECEIVED—
Feb 15, 2025ES71TEAS SECTION 71 RECEIVED—
Feb 26, 2024REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Nov 4, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED—
Nov 1, 2021NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jul 12, 2019FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jun 20, 2019FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jun 20, 2019FIMPFINAL DISPOSITION PROCESSED—
May 26, 2019FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Feb 26, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 11, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Dec 11, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 8, 2018GPNXNOTIFICATION PROCESSED BY IB—
Nov 21, 2018OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Nov 21, 2018OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Nov 21, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Nov 1, 2018ALIEASSIGNED TO LIE—
Oct 18, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 16, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 15, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 15, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 28, 2018CORNCORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Aug 17, 2018CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Jun 9, 2018RFNTREFUSAL PROCESSED BY IB—
May 23, 2018RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
May 23, 2018RFRRREFUSAL PROCESSED BY MPU—
May 19, 2018RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
May 18, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 15, 2018MAFRAPPLICATION FILING RECEIPT MAILED—
May 11, 2018DOCKASSIGNED TO EXAMINER—
May 11, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 10, 2018REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance