Drawing for FOAMROX

USPTO serial 79231768

FOAMROX

Reviewed by CopyMark Law Group

Reg. 5706037Status 709
Filing date
Status date
Registration date
Mar 26, 2019
Examiner
FALK, JONATHAN ROBERT
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with FOAMROX?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Christian D. Abel

Christian D. Abel Onsagers ASPO Box 1813 VikaOslo, 0123NORWAY

Goods and services

ClassDescriptionStatusFirst use
017Unprocessed and processed raw material of rubber, gutta-percha, crude rubber, namely raw or semi-worked rubber, gutta-percha, crude rubber; asbestos, mica and substitutes for these materials namely asbestos, mica and substitutes for these materials, namely, recycled glass and hardened foam; plastic and resin in extruded form for use in production; sealant, gasket- and insulation material, namely building insulation and foam insulation for use in building and construction; flexible pipes and hoses, non metal; refractory insulation material; foam insulation materials for use in buildings and constructionSECTION 71 - CANCELLED—
019Non-meal building materials, namely, patches for repairing drywall, paper board for building; Non-metal rigid pipes for building and construction purposes; asphalt, pitch, tar and bitumen; Non-metal portable houses; monuments, non metal; concrete; concrete building materials, namely, blocks, bricks, posts, slabs, panels; non metal construction materials suitable for use as structural elements in buildings and tunnels, namely, hardened foam; non metal refractory construction materials suitable for use as structural elements in buildings and tunnels; non metal fireproof construction materials suitable for use as structural elements in buildings and tunnels, namely, hardened foam, foam, rigid pipesSECTION 71 - CANCELLED—
037Interior construction of buildings; indoor sealing and caulking services; installation of building insulation; installation of construction materials suitable for use as structural elements in buildings and tunnels; installation of insulation materials in buildings, tunnels, roofs and structures; installation of wall coverings; installation of insulation materials in and around pipes; installation, maintenance and repair of casting machines; installation, maintenance and repair of equipment for use in road construction; construction of buildings and other structures, namely, tunnels, athletic facilities, office buildings, housing buildings, bridges, technical rooms, fireproof walls; installation of building materials, namely installation of building materials, namely installation of non-metal building elements, insulation materials, pipes, hoses, structural elements, cable ductsSECTION 71 - CANCELLED—
042Scientific and technological services, namely, analysis, testing, scientific research in the field of construction materials for use in building, tunnel and bridge construction; industrial analysis and research services in the field of construction materials for use in building, tunnel and bridge construction; design and development of computers and computer programs; technical consulting in the field of engineeringSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 10, 2026INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Oct 10, 2025C71TCANCELLED SECTION 71—
Sep 26, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED—
Mar 26, 2024REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Aug 16, 2019FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jul 30, 2019FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jul 30, 2019FIMPFINAL DISPOSITION PROCESSED—
Jun 26, 2019FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Mar 26, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 22, 2019ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Jan 8, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jan 8, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 19, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Nov 23, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 22, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 22, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 22, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 9, 2018RFNPREFUSAL PROCESSED BY IB—
May 24, 2018RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
May 24, 2018RFRRREFUSAL PROCESSED BY MPU—
May 22, 2018RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
May 22, 2018MAFRAPPLICATION FILING RECEIPT MAILED—
May 21, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 19, 2018MAFRAPPLICATION FILING RECEIPT MAILED—
May 15, 2018DOCKASSIGNED TO EXAMINER—
May 15, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 10, 2018REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance