Drawing for CENTRICA BUSINESS SOLUTIONS

USPTO serial 79232688

CENTRICA BUSINESS SOLUTIONS

Reviewed by CopyMark Law Group

Reg. 5905663Status 739Registered
Filing date
Status date
Registration date
Nov 12, 2019
Examiner
GLASSER, CARYN
Law office
Historical data usage

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with CENTRICA BUSINESS SOLUTIONS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Christopher J. Schulte

Christopher J. Schulte Merchant & Gould, P.C.P.O. Box 2910150 S. Fifth St., Ste 2200Minneapolis, MN 55402-0910

Goods and services

ClassDescriptionStatusFirst use
007Electric power supply generators; gas fuelled electric generators; electricity generators; electric power generators; electric generators for use in biogas technology; heat recovery steam generatorsACTIVE—
009Sensors, namely, optical sensors, electric sensors, electronic door sensors, electronic window sensors, electronic motion sensors, electronic humidity sensors, electronic temperature sensors, electronic electricity consumption sensors, electronic heat level sensors, electronic lighting level sensors, electronic steam level sensors, electronic water flow rate sensors, electronic sensors for monitoring performance and optimisation of power generation equipment including solar photovoltaics, cogeneration, standby power generation and wind turbines, electronic sensors for monitoring performance and optimisation of heat generation equipment including combined heat and power equipment(CHP), ground source heat pump systems, air source heat pump systems and biomass systems, electronic sensors for monitoring performance and optimisation of cooling equipment including HVAC equipment, electronic sensors for monitoring performance and optimisation of heat and power co-generation (CHP) equipment, and electronic sensors for monitoring performance and optimisation of energy storage equipment including battery energy storage systems and fuel cells; smart meters, namely, electronic meters for testing, displaying and reporting on-going energy usage; software for use in controlling a time period of use and to set schedules for heating and lighting apparatus for use in the field of residential and commercial energy management and heating control, and for use in reading, monitoring and reporting heat energy, cooling energy, water, gas and electricity consumption data for use in the field of residential and commercial energy management, communication software for connecting global computer networks and facial recognition and analysis software; solar panels for production of electricity, electricity storage apparatus, namely, electrical storage batteries, capacitors, super capacitors and ultra capacitorsACTIVE—
011Solar heating collection panels; lighting installations; heaters, namely, hot water heaters, storage heaters, gas water heaters, heating boilers, heaters producing heat generated from combined heat and power equipment (CHP), ground source heat pumps systems comprised of heat pumps, heat exchangers, ground source loops, heat recovery ventilators, HVAC units and equipment being heat exchangers for the recovery of waste heat, air source heat pumps systems comprised of heat pumps, heat exchangers, heat recovery ventilators and HVAC units and equipment being heat exchangers for the recovery of waste heat and biomass heaters; gas heat and cooling generators; steam generators; heating, ventilation and air-conditioning apparatus, namely, combined heat and power equipment (CHP) in the nature of alternative power plants for the simultaneous generation of heat and electricity, ground source heat pump systems comprised of heat pumps, heat exchangers, ground source loops, heat recovery ventilators, HVAC units and equipment being heat exchangers for the recovery of waste heat, air source heat pump systems comprised of heat pumps, heat exchangers, heat recovery ventilators, HVAC units and equipment being heat exchangers for the recovery of waste heat and biomass heating systems comprised of biomass heaters, heat recovery ventilators and HVAC units, air conditioners, heating radiatorsACTIVE—
035Data processing and data management, namely, data management service for use in collecting customer data in the field of residential and commercial energy management and heating control; provision of business information; advisory and consultancy services related to all of the aforementioned servicesACTIVE—
042Advisory services relating to the use of energy measurement to improve energy efficiency, energy efficiency and energy-saving measurements to improve efficiency; advisory services relating to energy efficiency, namely, developing of integrated energy concepts; professional consultancy relating to the conservation of energy; installation, maintenance and repair of computer software and computer programs for computer systems; preparation of technical reports in the field of energy efficiency management; conversion of data from physical to electronic media relating to energy consumption in buildings; preparation of engineering or technical reports relating to energy consumption in buildings; providing online engineering or technical reports relating to energy consumption in buildings; consultancy in the field of energy-saving measurements to improve energy efficiency; advisory services relating to energy efficiency, namely, developing of integrated energy concepts; energy auditing; design and development of systems for generating and using energy in an economic and efficient manner; installation, maintenance, updating, design, rental and repair of computer software, computer programs and computer software systems; computer systems design and computer programming; selection, capture and electronic storage of electronic data relating to energy consumption in buildings; technical consultancy in the field of energy saving and energy efficiency; information, advisory and consultancy services relating to the aforesaid servicesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 18, 2026NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Mar 18, 2026C75AREGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK.—
Mar 9, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Nov 29, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED—
Nov 10, 2025ES75TEAS SECTION 71 & 15 RECEIVED—
Sep 18, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED—
Nov 12, 2024REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Apr 13, 2024NREPNEW REPRESENTATIVE AT IB RECEIVED—
Mar 9, 2024NREPNEW REPRESENTATIVE AT IB RECEIVED—
Mar 27, 2020FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 5, 2020FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 5, 2020FIMPFINAL DISPOSITION PROCESSED—
Feb 12, 2020FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Dec 16, 2019CORVREVIEW OF CORRESPONDENCE COMPLETE - CERTIFICATE OF REG MAILED—
Dec 10, 2019TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Nov 15, 2019OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Nov 12, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 30, 2019OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Oct 30, 2019OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Aug 27, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 27, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 23, 2019GPNXNOTIFICATION PROCESSED BY IB—
Aug 7, 2019OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Aug 7, 2019OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Aug 7, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 24, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 23, 2019XAECEXAMINER'S AMENDMENT ENTERED—
Jul 23, 2019GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jul 23, 2019GNEAEXAMINERS AMENDMENT E-MAILED—
Jul 23, 2019CNEAEXAMINERS AMENDMENT -WRITTEN—
Jul 20, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 20, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 20, 2019ALIEASSIGNED TO LIE—
Jul 16, 2019ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jan 23, 2019GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Jan 23, 2019GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jan 23, 2019CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Dec 7, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 6, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 6, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 30, 2018RFNTREFUSAL PROCESSED BY IB—
Jun 8, 2018RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jun 8, 2018RFRRREFUSAL PROCESSED BY MPU—
Jun 3, 2018RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jun 2, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 2, 2018MAFRAPPLICATION FILING RECEIPT MAILED—
May 29, 2018DOCKASSIGNED TO EXAMINER—
May 29, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 24, 2018REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance