Drawing for VSI CONTROLS

USPTO serial 79234204

VSI CONTROLS

Reviewed by CopyMark Law Group

Reg. 5724330Status 708Registered
Filing date
Status date
Registration date
Apr 16, 2019
Examiner
EDWARDS, ALICIA COLLINS
Law office
Historical data usage

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with VSI CONTROLS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Richard M. Goldberg

Richard M. Goldberg Goldberg Patent Law Office25 East Salem StreetSuite 419Hackensack, NJ 07601

Goods and services

ClassDescriptionStatusFirst use
007VALVES, NAMELY, VALVES BEING PART OF MACHINES; [ HYDRAULIC VALVE ACTUATORS; ] PNEUMATIC VALVE ACTUATORS; [ PUMP CONTROL VALVES; ] DOSING VALVES, BEING PARTS OF MACHINES; [ VALVES, BEING PARTS OF PUMPS; ] CONTROL VALVES FOR REGULATING THE FLOW OF GASES AND LIQUIDS BEING PARTS OF MACHINES; LINEAR ACTUATORSACTIVE—
037[ INSTALLATION OF APPARATUS FOR THE PRODUCTION OF OIL; CONSTRUCTION OF STRUCTURES FOR THE PRODUCTION OF NATURAL GAS; CONSTRUCTION OF STRUCTURES FOR THE TRANSPORTATION OF NATURAL GAS; CONSTRUCTION OF STRUCTURES FOR THE STORAGE OF NATURAL GAS; INSTALLATION OF APPARATUS FOR GENERATING POWER; MAINTENANCE OF APPARATUS AND INSTALLATIONS FOR GENERATING POWER; SERVICING OF APPARATUS AND INSTALLATIONS FOR GENERATING POWER; REPAIR OF APPARATUS AND INSTALLATIONS FOR GENERATING POWER; INSTALLATION, MAINTENANCE AND REPAIR OF APPARATUS FOR GENERATING POWER; MAINTENANCE, SERVICING AND REPAIR OF APPARATUS AND INSTALLATIONS FOR GENERATING POWER; INSTALLATION, MAINTENANCE AND REPAIR OF APPARATUS FOR GENERATING ELECTRICITY; INSTALLATION, CONSTRUCTION, MAINTENANCE, SERVICING AND REPAIR OF ENERGY AND POWER GENERATING APPARATUS, EQUIPMENT AND INSTALLATIONS; INSTALLATION OF GAS SUPPLY AND DISTRIBUTION APPARATUS; INSTALLATION, MAINTENANCE AND REPAIR OF GAS AND ELECTRICITY SYSTEMS; EMERGENCY SERVICING OF GAS SUPPLY APPARATUS; REPAIR AND MAINTENANCE OF GAS AND ELECTRICITY INSTALLATIONS; INSTALLATION OF GAS AND WATER PIPELINES; RENTAL OF OIL WELL DRILLING TOOLS; CONSTRUCTION OF OIL PIPELINES; INSTALLATION OF PLUMBING; INSTALLATION OF WATER PIPES; INSTALLATION, MAINTENANCE AND REPAIR OF HIGH PRESSURE LINES, HOSING AND PIPELINES FOR HYDRAULIC SYSTEMS; REPAIR AND MAINTENANCE OF CHEMICAL PLANTS; SERVICING, CLEANING AND REPAIR OF CHEMICAL APPARATUS; REPAIR AND MAINTENANCE OF CHEMICAL PROCESSING MACHINES AND APPARATUS; CONSULTANCY RELATING TO INSTALLATION, MAINTENANCE AND REPAIR SERVICES; INSTALLATION OF SECURITY SYSTEMS; INSTALLATION, MAINTENANCE AND REPAIR OF APPARATUS FOR THE PRODUCTION OF OIL ]SECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 27, 2026INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Oct 27, 2025NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Oct 27, 2025C75PREGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.—
Oct 20, 2025APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jul 7, 2025ES75TEAS SECTION 71 & 15 RECEIVED—
Apr 16, 2024REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Mar 26, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED—
Aug 6, 2022ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Aug 30, 2019FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Aug 10, 2019FICSFINAL DISPOSITION NOTICE SENT TO IB—
Aug 10, 2019FIMPFINAL DISPOSITION PROCESSED—
Jul 16, 2019FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Apr 16, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 29, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jan 29, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 25, 2019GPNXNOTIFICATION PROCESSED BY IB—
Jan 9, 2019OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 9, 2019OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jan 9, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Dec 23, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 23, 2018XAECEXAMINER'S AMENDMENT ENTERED—
Dec 23, 2018GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Dec 23, 2018GNEAEXAMINERS AMENDMENT E-MAILED—
Dec 23, 2018CNEAEXAMINERS AMENDMENT -WRITTEN—
Dec 22, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 22, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 22, 2018ALIEASSIGNED TO LIE—
Dec 19, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 27, 2018RFNTREFUSAL PROCESSED BY IB—
Jul 10, 2018RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jul 10, 2018RFRRREFUSAL PROCESSED BY MPU—
Jun 30, 2018RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jun 29, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 26, 2018MAFRAPPLICATION FILING RECEIPT MAILED—
Jun 21, 2018DOCKASSIGNED TO EXAMINER—
Jun 21, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 20, 2018LIMILIMITATION FROM ORIGINAL APPLICATION ENTERED—
Jun 14, 2018REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance