USPTO serial 79234477
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Alternating current generators; diesel electric generators; electric alternating current generators; electric generators; electric power generators; electric power supplies, namely, electric generators; electricity generators; emergency power generators; emergency power supply generators; engine driven generators, namely, fuel-operated power generators; generators, namely, generators for wind turbines, emergency power generators; mobile electric power generators; power generators for land vehicles; power sources, namely, auxiliary power units for supplying electrical power to heat and power generators; diesel engines, other than for land vehicles; parts of engines, namely, piston rings; diesel turbine engines for machines not for land vehicles; electric engines other than for land vehicles; engines for the generation of electricity; engines for mobile installations, other than for land vehicles; generating sets for use with engines in the nature of electric generators and related equipment, namely, automatic standby electric generator sets; electronic starters for engines | SECTION 71 - CANCELLED | — |
| 009 | Batteries; chargers for electric batteries; electric apparatus for charging batteries, namely, battery charge devices; electric batteries; electric storage batteries; electrical batteries; electrical storage batteries; portable power supply apparatus, namely, batteries; power packs namely, batteries; power sources namely, batteries; power supply apparatus namely, batteries; power supply devices namely, batteries; power units namely, batteries; rechargeable dry batteries; separators being parts of batteries; solar batteries; solar batteries for industrial use; electric storage batteries; electric storage batteries for lighting; battery adaptors, namely, battery charge devices; battery charge indicators, namely, battery monitors; battery charge monitors; battery chargers; battery holders, namely, battery cases; battery housing covers namely, battery cases; battery packs; battery separators; battery testers; battery charge devices, namely, charging systems for battery operated appliances; power supplies, namely, power supply devices for battery chargers; electricity generating solar cells and panels; solar energy collectors for electricity generation, namely, photovoltaic cells also including a solar thermal collector sold as a unit; solar energy operating apparatus, namely, photovoltaic solar modules for production of electricity, solar wafers, solar cells; solar panels for the production of electricity | SECTION 71 - CANCELLED | — |
| 040 | Hire of electrical generators, namely, rental of electrical generators; rental of electric power generators; rental of electricity generators | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 14, 2026 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Nov 14, 2025 | C71T | CANCELLED SECTION 71 | — |
| Apr 30, 2024 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Mar 9, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Sep 13, 2019 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Aug 26, 2019 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Aug 26, 2019 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jul 30, 2019 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Apr 30, 2019 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Feb 12, 2019 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Feb 12, 2019 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Feb 8, 2019 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jan 23, 2019 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jan 23, 2019 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jan 23, 2019 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jan 2, 2019 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 18, 2018 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Dec 18, 2018 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Dec 18, 2018 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Dec 18, 2018 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Nov 29, 2018 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Nov 29, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 29, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 29, 2018 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 21, 2018 | RFNP | REFUSAL PROCESSED BY IB | — |
| Sep 6, 2018 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Sep 6, 2018 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Aug 26, 2018 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Aug 25, 2018 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 20, 2018 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 22, 2018 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jun 18, 2018 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 14, 2018 | SDRC | SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB | — |