Drawing for STANDARTPARK

USPTO serial 79234671

STANDARTPARK

Reviewed by CopyMark Law Group

Reg. 5952179Status 709
Filing date
Status date
Registration date
Jan 7, 2020
Examiner
FOX III, LYAL L
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with STANDARTPARK?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Vivian Ortiz-Ponce

Vivian Ortiz-Ponce Notaro, Michalos & Zaccaria P.C.100 Dutch Hill Road, Suite 240Orangeburg, NY 10962UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Reinforcing materials of metal for concrete; Metal refractory bricks of metal for paving furnace interiors; Large metal floor tiles in the nature of slabs for covering wide areas within a minimal number of tiles; paving stones of metal in the nature of paving slabs of metal; metal gutters; metal drain traps; metal manhole covers; metal pipe muffs; metal fence railings for roads in the nature of crash barriers of metal for roads; elbows of metal for pipes; metal branches for pipes in the nature of branching tubes of metal for pipelines; metal rings for attaching gutters in the nature of gutter brackets of metal; removable metal covers for manholes; metal laths; metal gratings for rainwater reception trays; metal palings; shuttering of metal for concrete; metal branching pipes; metal gratings; metal gutter pipes; metal drain pipes; construction elements of metal in the nature of metal flanges for hydraulic insulation, metal gaskets for use in conjunction with hydraulic insulationSECTION 71 - CANCELLED—
017Rubber valves, namely, flapper valves for use within roof gutter downspouts; Reinforcing materials, not of metal, for pipes and tubes; Rings of rubber for use as pipe connection seals; insulating materials; sealant compounds for joints; rubber flanges for steps; Semi-processed foams of plastic in the nature of filtering materials for use as a filtering media in sewage and waste water treatment; pipe muffs, not of metal; rubber stoppers for use in pipelines for water supply and sewage; pipe gaskets; non-metallic couplings for use in pipelines for water supply and sewage; flexible tubes, not of metal; waterproof packings for plumbing pipes; irrigation hoses; irrigation pipes in the nature of flexible plastic pipes for conveying liquids; module coating in the nature of insulating coatingsSECTION 71 - CANCELLED—
019Water-pipe valves in the nature of movable drain traps, not of metal or plastic; non-metallic bricks for paving; non-metal bricks; non-metal tiles; paving stones not of metal; roof flashings not of metal for construction for hydraulic insulation in the nature of non-metal building flashing; reinforcing materials, not of metal, for building; street gutters, not of metal; gutter pipes, not of metal; non-metal gates and panels for fences; non-metallic unlinked fences; non-metallic protective guides for roads in the nature of crash barriers, not of metal, for roads; non-metallic fence stays; non-metallic fence posts; fences, not of metal; non-metallic tubing in the nature of non-metal, rigid filtering tubes used to prevent storm water runoff pollutants from entering sewer systems; non-metallic paving stones for paving; non-metallic floor tiles for flooring and decking; ceramic drain pipes; bricks; manhole covers, not of metal; road coating materials, namely, non-metal bricks, non-metal tiles and paving stones not of metal; mosaics for building in the nature of non-metal mosaic tiles for building; laths, not of metal; shuttering, not of metal, for concrete; branching pipes, not of metal; wall tiles, not of metal, for building; cement slabs; paving slabs, not of metal; non-metallic floor tiles for flooring; non-metallic sewer and water drainage pipes, namely, branch pipes; clinker stone namely, cement kiln-fired stone in the nature of pre-cast concrete blocksSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 24, 2026C71TCANCELLED SECTION 71—
Jan 7, 2025REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Apr 15, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jul 17, 2020FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Apr 20, 2020XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Apr 19, 2020XXCRGENERIC MADRID TRANSACTION CREATED—
Apr 7, 2020FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jan 7, 2020R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 6, 2020DOCKASSIGNED TO EXAMINER—
Dec 13, 2019OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Nov 27, 2019OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Nov 27, 2019OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Oct 22, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 22, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 18, 2019GPNXNOTIFICATION PROCESSED BY IB—
Oct 2, 2019OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Oct 2, 2019OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Oct 2, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 18, 2019ALIEASSIGNED TO LIE—
Sep 15, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 22, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 22, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 22, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 22, 2019ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 22, 2019REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
May 31, 2019NREPNEW REPRESENTATIVE AT IB RECEIVED—
Mar 1, 2019GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 1, 2019GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 1, 2019CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 8, 2019DOCKASSIGNED TO EXAMINER—
Jan 23, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 23, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 23, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 18, 2019ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 18, 2019REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Aug 11, 2018RFNTREFUSAL PROCESSED BY IB—
Jul 25, 2018RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jul 25, 2018RFRRREFUSAL PROCESSED BY MPU—
Jul 12, 2018RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jul 11, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 9, 2018RFWRNON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW—
Jun 27, 2018RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jun 26, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 26, 2018MAFRAPPLICATION FILING RECEIPT MAILED—
Jun 22, 2018DOCKASSIGNED TO EXAMINER—
Jun 22, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 21, 2018REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance