USPTO serial 79235866
WAGA
Reviewed by CopyMark Law Group
Reg. 5747967Status 706Registered
- Filing date
- Status date
- Registration date
- May 14, 2019
- Examiner
- BLANDU, FLORENTINA
- Law office
- Historical data usage
What this means
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
Need help with WAGA?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
JANET G RICCIUTI
JANET G RICCIUTI JANET GILBERT RICCIUTI, PC2003 KALORAMA ROAD NWWASHINGTON, DC 20009United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 004 | [ Fuels, namely, motor spirit; ] biofuels; [ fuel gas; fuel in the nature of biogas; ] renewable gas for use as biofuel in the nature of biomethane [ ; natural gas for vehicles; liquefied natural gas; renewable gas for use as fuel in the nature of liquid bio methane; electrical energy; fuel in the nature of bio-gas from non-hazardous waste storage installation; renewable natural gas ] | ACTIVE | — |
| 011 | Installations for producing, distributing, separating, purifying and liquefying gas, namely, methane gas recycling systems comprised primarily of one or more of the following pieces of equipment, namely, pressure swing adsorption equipment, temperature swing adsorption equipment, perm selective membrane equipment, distillation equipment, for the recovery, purification and return of gases in industrial applications | ACTIVE | — |
| 037 | Construction, installation, repair, servicing and maintenance of equipment, apparatus and installations for the production, recovery, separation, purification, liquefaction, processing and distribution of biofuel, fuel gas, biogas, bio methane, natural gas for vehicles, liquefied natural gas, liquefied bio methane, biogas of non-hazardous waste storage installation, and renewable natural gas; construction management in the nature of supervision and management of installation and repair of equipment, apparatus and installations for the production, recovery, separation, purification, liquefaction, processing and distribution of biofuel, fuel gas, biogas, bio methane, natural gas for vehicles, liquefied natural gas, liquefied bio methane, biogas from non-hazardous waste storage installation, and renewable natural gas | ACTIVE | — |
| 040 | Energy production services; [ information on the production of energy; ] waste treatment (transformation); [ sorting of waste and recyclable raw material (transformation); ] treatment, recycling and energy extraction in the nature of power generation of waste products, bio gas and bio methane; transforming of waste and fuels for the production of energy; treatment of waste by methanization; purification and injection of bio methane into the gas pipeline network [ ; rental of devices, apparatus and installations for the production, recovery, separation, purification, liquefaction of biofuel, fuel gas, biogas, biomethane, natural gas for vehicles, liquefied natural gas, liquefied biomethane, biogas from non-hazardous waste storage installation, renewable natural gas ] | ACTIVE | — |
| 042 | [ Advice in the field of energy savings; construction drafting; ] engineering services, namely, expert reports (engineers' works) and technical project studies planning and design engineering in the fields of renewable energies and environmental protection [ ; research and development services in the fields of renewable energies and environmental protection; research, development and design of bio gas purification units; research, development and design of processes, equipment, apparatus and installations for the production, recovery, separation, purification, liquefaction and distribution of biogas, bio methane, natural gas for vehicles, liquefied natural gas, liquefied bio methane, biogas from non-hazardous waste storage installation, and renewable natural gas; quality control for others; programming for computers; design, development, updating and rental of software, software packages, computers, computer databases, and computer systems ] | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by WAGA ENERGY
- Other trademarks owned by WAGA ENERGY
- Other trademarks owned by WAGA ENERGY
- Other trademarks in Class 004
- Other trademarks in Class 011
- Other trademarks in Class 037
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named WAGA
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 29, 2026 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Aug 11, 2026 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Dec 29, 2025 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Dec 29, 2025 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Dec 11, 2025 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| Dec 11, 2025 | PR71 | POST REGISTRATION ACTION MAILED - SEC.71 | — |
| Dec 9, 2025 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| Jun 10, 2025 | PR71 | POST REGISTRATION ACTION MAILED - SEC.71 | — |
| May 19, 2025 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jan 23, 2025 | ES71 | TEAS SECTION 71 RECEIVED | — |
| May 14, 2024 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Oct 1, 2023 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Sep 27, 2019 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Sep 4, 2019 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Sep 4, 2019 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Aug 14, 2019 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jun 13, 2019 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| May 14, 2019 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Feb 26, 2019 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Feb 26, 2019 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Feb 22, 2019 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Feb 6, 2019 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Feb 6, 2019 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Feb 6, 2019 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jan 21, 2019 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 17, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 17, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 17, 2019 | ALIE | ASSIGNED TO LIE | — |
| Jan 15, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 18, 2018 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jul 31, 2018 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jul 31, 2018 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jul 15, 2018 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jul 14, 2018 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 11, 2018 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jul 7, 2018 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 7, 2018 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 5, 2018 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |