Drawing for ADB STAGELIGHT

USPTO serial 79236855

ADB STAGELIGHT

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
BLANE, SUZANNE
Law office
TMO LAW OFFICE 114 - EXAMINING ATTORNEY ASSIGNED

What this means

These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.

Status 602: These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances.

Need help with ADB STAGELIGHT?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
009LEDs (light-emitting diodes) and LED (light-emitting diode) displays, LED panels for displaying videos or images, electronic regulating and control devices for the operation of LEDs (light-emitting diodes); apparatus and instruments for controlling lighting including apparatus and instruments for controlling stage lighting, computer controls for lighting apparatus and instruments, control consoles for lighting apparatus and instruments, programmable controls for lighting apparatus and instruments, remote control apparatus for lighting apparatus and instruments, audio sensitive controls for lighting apparatus and instruments; lighting control software including lighting control software for use in commercial and industrial facilities, in theaters, in night clubs and at concerts, lighting control software for use in stage lighting apparatus and instruments and for controlling stage lighting apparatus and instruments; cables, connectors and switches for stage lighting apparatus and instruments; image projectors [lighting fixtures for projection of patterns, images, logos, text or shapes]ACTIVE—
011Apparatus and instruments for lighting; stage lighting apparatus and instruments including flood lights, parabolic aluminized reflector [PAR] lights, strip lights, spotlights, ellipsoidal reflector spotlights [ERS], fresnel lanterns, follow spots, beam projectors, moving heads [stage lighting apparatus]; filters for lighting apparatus and instruments, filters for use with lighting apparatus and instruments, colour filters for use with lighting apparatus and instruments, light screens and filters for lighting apparatus and instruments; apparatus and instruments for effect lighting including moving heads (effect lighting apparatus), rollerscanners, strobe lights (light effects); computer controlled lighting apparatus and instruments; decorative electric lighting apparatus; LED (light emitting diodes) luminaires, LED (light emitting diodes) lighting fixtures; HID (high intensity discharge) luminaires, HID (high intensity discharge) lighting fixtures; halogen luminaires, halogen lighting fixtures; lights for use in displays, commercial, industrial, residential, and architectural accent lighting applications, wash light projectors, architectural up-lights for installation in the ground, on ceilings or on walls; fluorescent luminaires; fibre illuminators (light sources for fibre-optic cables); laser light projectors; fans for use with smoke generating machines; parts for the aforesaid goods, included in this classACTIVE—
042Technical planning of lighting installations and consultancy relating thereto, scientific and industrial research; creating programmes for data processing; architecture and interior design, in particular in the field of lighting; providing of planning and simulation programs for lighting applications, including via the internet through rental of softwareACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 28, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED—
Apr 19, 2024CHLDCHANGE OF OWNER RECEIVED FROM IB—
Mar 26, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED—
Apr 3, 2020FINTFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 16, 2020FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 14, 2020FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jan 10, 2020OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Dec 25, 2019OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Dec 25, 2019OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Mar 14, 2019MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Mar 14, 2019ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Sep 1, 2018RFNTREFUSAL PROCESSED BY IB—
Aug 16, 2018RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 16, 2018RFRRREFUSAL PROCESSED BY MPU—
Aug 5, 2018RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 4, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 27, 2018DOCKASSIGNED TO EXAMINER—
Jul 27, 2018MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 23, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 19, 2018REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance