Drawing for CLESTRA IRYS

USPTO serial 79236863

CLESTRA IRYS

Reviewed by CopyMark Law Group

Reg. 5730521Status 709
Filing date
Status date
Registration date
Apr 23, 2019
Examiner
AGREDA, SAMANTHA LEIGH
Law office
POST REGISTRATION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with CLESTRA IRYS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
006Partitions with frames of metal for building; partitions of metal for buildings; portable buildings of metal; [ building ] * construction * materials of metal being framework for buildings, laths, wall or ceiling panels, door panels, doors, ceiling boards; [ transportable buildings of metal; ] *transportable structures of metal; * reinforcing materials of metal for building; [ portable steel buildings; ] * portable steel structures; * exterior roller blinds of steel for guiding light; steel sheets; door frames of metal; [ reinforcing materials of metal for pipes; ] * reinforcing materials of metal for ducts, * window frames of metal; [ door casings of metal; ] * reinforcing materials of metal doors; * door stops of metal; window stops of metal; [ tiles of metal for building; tile floorings of metal; paving blocks of metal; metal hinges; ] * hinges of metal; * [ framework of metal for building; ] frames of metal for building; [ ducts ] * conduits * of metal for ventilating and air conditioning [ facilities ] * installations; * fences of metal; pre-fabricated metal architectural columns being parts of constructions; staircases of metal; windows of metal; doors of metal; non electric door closers of metal; wainscoting of metal; laths of metal, jalousies of metal, [ porches ] * awnings * of metal for [ building ] * structures *, lintels of metal, latches of metal, [ metal staircase steps, ] * stair treads of metal, * metal lock bolts, roof coverings of metal, roofing of metal, [ tiles of metal, wall claddings of metal for building; ] building panels of metal for construction; [ wall linings of metal for building; metal wall linings for building; ceiling panels of metal; floors of metal; ] door handles of metal; [ joists ] * beams * of metal; girders of metal; non-electric locks of metal; cornices of metal; angle irons of metal; metal hardware being metal hooks; hooks of metal for clothes rails; [ metal floor tiles; ] gutters of metal; [ grilles ] * gratings * being frameworks of metal; metal hooks for clothes; screws of metal; shutters of metal; shelf brackets of metal; building panels of metal; magnetic or magnetized metal name plates and non-luminous and non-mechanical signs of metalSECTION 71 - CANCELLED—
019[ Partitions with frames, not of metal, for building; partitions, not of metal, for building; building materials, not of metal, namely, being framework for buildings, laths, wall or ceiling panels, door panels, doors, ceilings, window glass; ] [ * Non-metallic * transportable buildings; not of metal; ] * non-metallic transportable structures; * * non-metallic * reinforcing materials, [ not of metal, ] for building; * non-metallic * window frames; [ not of metal; ] non-metallic door frames; [ tiles, not of metal, for building; framework, not of metal, for building; window casings, not of metal; door casings, not of metal; staircases, not of metal; ] * non-metallic * windows; [ not of metal; ] * non-metallic * door frames; [ not of metal; ] * non-metallic * wainscoting; [ not of metal; ] * non-metallic * parquet floor boards; [ not of metal; ] * non-metallic * laths; [ not of metal, stair-treads being steps, not of metal; wall claddings for building, not of metal; building panels, not of metal; wall linings, not of metal, for building; ] parquet flooring; [ ceilings, not of metal; floors not of metal; door panels, not of metal; doors, not of metal; ] * non-metallic * posts; [ not of metal; ] * non-metallic * palisades; [ not of metal; joists, not of metal; ] * non-metallic * beams; [ not of metal; roof coverings for building, not of metal; tile flooring, not of metal; ] * non-metallic girders; non-metallic * fences; [ not of metal; ] non-metallic ducts for [ ventilation ] * ventilating * and air conditioning installations; [ * non-metallic * transportable * buildings; ] * non-metallic transportable structures; * [ constructions, not of metal; ] * non-metallic * cornices; [ not of metal; ] * non-metallic * angle irons; [ not of metal; ] * non-metallic * roof gutters; [ not of metal; roof coverings, not of metal; roofing, not of metal; paving slabs, not of metal; tiles, not of metal; jalousies, not of metal; ] * non-metallic * lintels; [ not of metal; ] [ * non-metallic * shutters; not of metal; ] common sheet glass for building; insulating glass for construction purposes; window glass for building, excluding glass for vehicle windows; stained-glass windowsSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 7, 2026INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Nov 7, 2025C71TCANCELLED SECTION 71—
Apr 23, 2024REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Sep 17, 2020INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE—
Aug 18, 2020INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Dec 16, 2019LIMELIMITATION FROM THE IB EXAMINED AND ENTERED—
Dec 9, 2019COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Dec 2, 2019PLGLASSIGNED TO PARALEGAL—
Sep 12, 2019LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Sep 6, 2019FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Aug 16, 2019FICSFINAL DISPOSITION NOTICE SENT TO IB—
Aug 16, 2019FIMPFINAL DISPOSITION PROCESSED—
Jul 23, 2019FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jul 17, 2019LIMELIMITATION FROM THE IB EXAMINED AND ENTERED—
Jul 12, 2019COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Jul 12, 2019APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jun 21, 2019LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Apr 23, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 5, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 5, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 2, 2019GPNXNOTIFICATION PROCESSED BY IB—
Jan 16, 2019OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 16, 2019OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jan 16, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jan 2, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 1, 2019XAECEXAMINER'S AMENDMENT ENTERED—
Jan 1, 2019GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jan 1, 2019GNEAEXAMINERS AMENDMENT E-MAILED—
Jan 1, 2019CNEAEXAMINERS AMENDMENT -WRITTEN—
Dec 17, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 17, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 17, 2018CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Dec 17, 2018ALIEASSIGNED TO LIE—
Dec 12, 2018TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Dec 12, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 1, 2018RFNTREFUSAL PROCESSED BY IB—
Aug 10, 2018RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 10, 2018RFRRREFUSAL PROCESSED BY MPU—
Jul 27, 2018RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jul 27, 2018MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 26, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 23, 2018DOCKASSIGNED TO EXAMINER—
Jul 23, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 19, 2018REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance