USPTO serial 79236912
BONATTI
Reviewed by CopyMark Law Group
Reg. 5790412Status 708Registered
- Filing date
- Status date
- Registration date
- Jul 2, 2019
- Examiner
- BURDECKI, ANNA C
- Law office
- Historical data usage
What this means
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
Need help with BONATTI?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Franco Serafini
Franco Serafini Themis Law888 Prospect St Ste 200La Jolla, CA 92037United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | [ Motors and engines except for land vehicles; automatic vending machines; fans for motors and engines; pump machines for the extraction of gases being vacuum pumps; pumps machines for the extraction of liquids being vacuum pumps; sludge pumps ] | SECTION 71 - CANCELLED | — |
| 009 | [ Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, transformers; apparatus for recording, transmission or reproduction of sound or images; blank magnetic data carriers and digital recording media, namely, digital audio tape recorders; data processing equipment, namely, computers; computer software for creating searchable databases of information and data; fire-extinguishing apparatus ] | SECTION 71 - CANCELLED | — |
| 019 | [ Non-metal building materials, namely, non- metallic transportable buildings ] | SECTION 71 - CANCELLED | — |
| 037 | Building construction and repair; laying and construction of pipelines; installation of industrial plants, namely, installation of oil production apparatus; [ construction project management services in the field of construction of offshore oil and gas facilities; ] maintenance of oil and petrochemical installations, namely, maintenance of pipelines for oil; turnkey construction of installations for transporting liquids being pipeline construction; [ construction of transport infrastructure being road construction; ] civil and industrial construction being construction of facilities, structures, living quarters, and utility buildings, production modules and subsea modules in the oil and gas industry; [ repair of off-shore oil and gas installations; ] extraction of gas; [ oil and gas drilling; ] construction of structures for transporting petroleum and natural gas; [ drilling of oil or gas wells; ] construction of pipelines; construction of fountains for the production of crude oil; pipeline construction and maintenance; drilling and pumping of oil | ACTIVE | — |
| 039 | [ Transportation and storage of goods; transport by pipeline; transmission of oil, petroleum or gas through pipelines; storage, distribution, and transportation of liquefied petroleum gas, gas, oil; transportation of liquefied natural gas through the sea ] | SECTION 71 - CANCELLED | — |
| 040 | [ Treatment of materials by vulcanization, namely, materials for use in construction, for the oil industry, for the petrochemical industry; gas production services; filtration of gas being gas processing services; gas refining; oil refining; processing of gas; processing of oil; refining of petroleum products; petroleum gas liquefaction services; natural gas liquefaction services; filtration services for the oil industry being fuel refining ] | SECTION 71 - CANCELLED | — |
| 042 | Engineering services, namely, engineering for the oil and gas industry; consultancy and survey services in the field of engineering; [ research in the field of ecology; geological surveys and research; ] oil-field surveys [ ; oil-field testing being oil-field surveys; design of oil-field surveys; analysis for oil-field exploitation; oil-well testing; oil-well surveys; design of oil-well surveys; analysis for oil-well exploitation being analysis for oil-field exploitation; analysis of oil reservoirs being analysis for oil research; scientific and technological services, namely, analysis and testing in the field of oil ] | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by BONATTI S.p.A.
- Other trademarks owned by BONATTI S.p.A.
- Other trademarks owned by BONATTI S.p.A.
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 019
- Other trademarks in Class 037
- Other trademarks in Class 039
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named BONATTI
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 16, 2026 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Oct 16, 2025 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Oct 16, 2025 | C75P | REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Oct 6, 2025 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jun 28, 2025 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Jul 2, 2024 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Mar 30, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Nov 15, 2019 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Oct 24, 2019 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Oct 24, 2019 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Oct 2, 2019 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jul 2, 2019 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 16, 2019 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Apr 16, 2019 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 27, 2019 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Mar 4, 2019 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Mar 1, 2019 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Mar 1, 2019 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Mar 1, 2019 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Mar 1, 2019 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Feb 11, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 10, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 10, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 1, 2018 | RFNT | REFUSAL PROCESSED BY IB | — |
| Aug 15, 2018 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Aug 15, 2018 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Aug 2, 2018 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Aug 1, 2018 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 27, 2018 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jul 23, 2018 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 23, 2018 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 20, 2018 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Jul 19, 2018 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |