USPTO serial 79237070
Serial No. 79237070
Reviewed by CopyMark Law Group
Reg. 5663808Status 709
- Filing date
- Status date
- Registration date
- Jan 29, 2019
- Examiner
- PHILLIPS, WENDELL SHARMAN
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with Serial No. 79237070?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Fixtures of metal being structural supports for supporting work during machining; clamps of metal; stands being structures of metal for supporting work during machining | SECTION 71 - CANCELLED | — |
| 007 | Clamping devices, namely, clamps for use in the precision clamping of work pieces with machine tools; Clamping devices, namely, clamps for use in the precision clamping of work pieces with machine tools that have measuring functions; Clamping devices, namely, clamps for use in the precision clamping of work pieces with machine tools during assembly; clamping tools for holding piece parts during machining; holding devices for machine tools; handling apparatus being machines for loading and unloading; Machine tools, namely, holders, jaws and vices for use in the precision clamping of work pieces; flexible couplings being parts of machines; stands for machines | SECTION 71 - CANCELLED | — |
| 009 | Measuring fixtures being apparatus for measuring length, width, distance, weight, and angles; measuring stands being apparatus for measuring length, width, distance, weight, and angles; measuring apparatus for measuring length, width, distance, weight, and angles; measuring instruments being apparatus for measuring length, width, distance, weight, and angles; distance and dimension measuring instruments; jigs being instruments for measuring distance and dimension; gauges being instruments for measuring angles, levels, depth, pressure, and length; Marking gauges for joinery purposes; tool measuring instruments | SECTION 71 - CANCELLED | — |
| 019 | Stands being non-metallic structures for use in supporting assembly pieces in the manufacturing industry and during machining; Stands being non-metallic structures for use in supporting parts in an assembly line, production line, or in automotive industry manufacturing | SECTION 71 - CANCELLED | — |
| 020 | Fixtures, not of metal, being clamps, vices, holders, grippers, and jaws for supporting work during machining; clamps, not of metal | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by TMP Tooling AB
- Other trademarks owned by TETRAFIX AB
- Other trademarks owned by TETRAFIX AB
- Other trademarks owned by TETRAFIX AB
- Other trademarks in Class 006
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 019
- Other trademarks in Class 020
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 4, 2026 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| May 15, 2026 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| May 15, 2026 | INPC | INVALIDATION PROCESSED | — |
| Apr 15, 2026 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Aug 15, 2025 | C71T | CANCELLED SECTION 71 | — |
| Jan 29, 2024 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| May 15, 2023 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| May 9, 2021 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jun 14, 2019 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| May 23, 2019 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| May 23, 2019 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Apr 29, 2019 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jan 29, 2019 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Nov 13, 2018 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Nov 13, 2018 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 9, 2018 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Oct 24, 2018 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Oct 24, 2018 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Oct 24, 2018 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 25, 2018 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 17, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 17, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 17, 2018 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 17, 2018 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 1, 2018 | RFNT | REFUSAL PROCESSED BY IB | — |
| Aug 15, 2018 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Aug 15, 2018 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Aug 2, 2018 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Aug 1, 2018 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 28, 2018 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jul 24, 2018 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 24, 2018 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 19, 2018 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |