Drawing for MW M+W GROUP

USPTO serial 79237337

MW M+W GROUP

Reviewed by CopyMark Law Group

Reg. 5790451Status 709
Filing date
Status date
Registration date
Jul 2, 2019
Examiner
MAI, TINA HSIN
Law office
TMEG LAW OFFICE 108

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with MW M+W GROUP?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
009Electronic apparatus and instruments for controlling, regulating and monitoring heating, air conditioning and ventilating installations for use in clean room installations; electronic control, regulating and monitoring apparatus and instruments, namely, thermostats, monitors and recording devices, measuring and control devices for pressure, temperature, consumption, and speed, all for control and monitoring of building and supply components, namely, air conditioners, clean rooms, clean air suppliers, and filter fan units; computers and computer programs for monitoring and/or automating building control technologySECTION 71 - CANCELLED—
011electric fans, filters for the industrial air purification, air filter ventilator units, lights, ventilating apparatus for air conditioning as well as air conditioning apparatus, all being for use in clean rooms, climatic chambers, clean room ceilings, rotation locks and tunnel locks; all the aforementioned goods fitted to the use in grid ceilings, walls, floors, covering plates and partitions; heating and air conditioning installations for building technology; refrigerating, heating, drying and ventilating installations, equipment and apparatus; air conditioning equipment and apparatus and installations consisting of thereof; dust, solvent vapour and oil mist extraction and separating apparatus and installations, all being for use in clean room installations or for use in the treatment of atmospheric gases; electric fans for the aforementioned goodsSECTION 71 - CANCELLED—
037Building construction supervision; maintenance in the field of repair and cleaning of semi-conductor factories; construction of semi-conductor factories; installation of heating, refrigerating, air conditioning, drying, ventilating, extraction and separating installations and apparatus; implementation of maintenance and inspection facilities and/or projects in the context of monitoring maintenance and inspection intervals stipulated by the manufacturer and repair and maintenance of heating, refrigerating, air conditioning, drying, ventilating, extraction and separating installations and apparatusSECTION 71 - CANCELLED—
042Technical planning of building technology and process technology installations for the air conditioning technology, clean room technology, building technology, electrical engineering, supply technology, sanitation technology, environmental control, computerization and media supply purposes; performance of technical inspections of statutory operability of heating, refrigerating, air conditioning, drying, ventilating, extraction and separating installations and apparatus; building technology services, namely, performance of technical inspections of operability of building technology installations and of technical production and process flow; technical planning and consultancy therefor relating to implementation of production process and flow in the field of microelectronics, the pharmaceutical industry and the food industry; technical planning and consultancy therefor relating to environmentally-friendly microelectronics manufacture; technological consultancy for the implementation of environmentally-friendly microelectronics manufacture; technical consultancy in the redesigning of semi-conductor factories; technical consultancy for improving ecological efficiency and energy saving and recycling technology; technical planning of semi-conductor factories; technical planning, performance of technical inspection, also with regard to legal requirements, as well as certification of clean rooms and all types of technical building equipment at the stages of planning, installation, function and performance, and of the documentation therefore in the context of technical project management and performance of technical inspections; technical planning of building and process technology installationsSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 16, 2026INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jan 16, 2026C71TCANCELLED SECTION 71—
Nov 14, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED—
Oct 25, 2019FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Oct 4, 2019FICSFINAL DISPOSITION NOTICE SENT TO IB—
Oct 4, 2019FIMPFINAL DISPOSITION PROCESSED—
Oct 2, 2019FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jul 2, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 19, 2019NREPNEW REPRESENTATIVE AT IB RECEIVED—
Apr 16, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 27, 2019NPUBNOTICE OF PUBLICATION—
Mar 4, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 13, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 12, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 12, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 1, 2019NREPNEW REPRESENTATIVE AT IB RECEIVED—
Sep 1, 2018RFNTREFUSAL PROCESSED BY IB—
Aug 14, 2018RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 14, 2018RFRRREFUSAL PROCESSED BY MPU—
Jul 31, 2018RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jul 31, 2018MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 30, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 27, 2018DOCKASSIGNED TO EXAMINER—
Jul 27, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 26, 2018REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance