Drawing for AZETA ZEO ASIOLI

USPTO serial 79237756

AZETA ZEO ASIOLI

Reviewed by CopyMark Law Group

Reg. 5667939Status 708Registered
Filing date
Status date
Registration date
Feb 5, 2019
Examiner
SAKAI, ADA HAN
Law office
Historical data usage

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with AZETA ZEO ASIOLI?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Alison M. Caless

Alison M. Caless Cantor Colburn LLP20 Church StreetFloor 22Hartford, CT 06103

Goods and services

ClassDescriptionStatusFirst use
006[ Pegs of metal; metal storage tanks; water tanks of metal for household purposes; industrial water tanks of metal; elbows of metal for pipes; pipe muffs of metal; valves of metal, other than parts of machines, including those made from alloy steel and titanium; grease nipples; junctions of metal for pipes; hose fittings of metal; rotating junctions of metal for pipes ]SECTION 71 - CANCELLED—
007[ Lubricating pumps; ] pressure valves, being parts of machines; dosing valves, being parts of machines; valves sold apart from and for use with pumps; pump control valves being parts of industrial machines for regulating the flow of gases and liquids; checking valves for regulating the flow of gases and liquids, being parts of machines [ ; pneumatic jacks; pneumatic controls for machines; pneumatically operated tire inflation machine; pneumatic pipe-ramming machinery and auxiliary supportive devices used in the installation or replacement of utility pipe lines, cable lines, pipe tunnels and underground utility systems ]ACTIVE—
009[ Liquid level sensors; pressure sensors ]SECTION 71 - CANCELLED—
010[ Pins for artificial teeth; bone screws ]SECTION 71 - CANCELLED—
011[ Plumbing fittings, namely, shower control valves; plumbing fittings, namely, water level controlling valves for water tanks; thermostatic radiator valves; thermostatic valves, being parts of heating installations; gaseous dosing valves sold apart from and for use with heating installations; dosing valves sold as an integral component part of heating or gas installations in the nature of HVAC units; automatic temperature regulators, being thermostatic valves, for central heating radiators ]SECTION 71 - CANCELLED—
012[ Engines for land vehicles; transmissions for land vehicles; brake cylinders for vehicles; vehicle brake cylinders; brake discs for vehicles; hydraulic disc brakes for bicycles; disc brakes for land vehicles; hydraulic rim brakes for bicycles ]SECTION 71 - CANCELLED—
040[ Custom manufacture of machine tools for others; custom manufacture of tools for use in HVAC field for others; ] metal casting; metal fabrication and finishing services for others; metal treating; [ metal tempering; electroplating of metals; applying decorative and protective coatings to metal by means of galvanization; ] metal treating and metal casting [ ; hardening of metals ]ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 4, 2026NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Nov 4, 2026C75PREGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.—
Nov 3, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jan 28, 2025ES75TEAS SECTION 71 & 15 RECEIVED—
May 17, 2024CHLDCHANGE OF OWNER RECEIVED FROM IB—
Feb 5, 2024REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Jul 19, 2019FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jun 7, 2019COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Jun 7, 2019APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
May 31, 2019XXSSGENERIC MADRID TRANSACTION SENT TO IB—
May 31, 2019XXCRGENERIC MADRID TRANSACTION CREATED—
May 5, 2019FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Apr 11, 2019COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Feb 5, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 24, 2018GPNXNOTIFICATION PROCESSED BY IB—
Nov 20, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Nov 20, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 7, 2018OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Nov 7, 2018OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Oct 31, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 10, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 9, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 9, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 9, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 8, 2018RFNTREFUSAL PROCESSED BY IB—
Aug 23, 2018RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 23, 2018RFRRREFUSAL PROCESSED BY MPU—
Aug 11, 2018RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 10, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 10, 2018MAFRAPPLICATION FILING RECEIPT MAILED—
Aug 6, 2018DOCKASSIGNED TO EXAMINER—
Aug 6, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 3, 2018LIMILIMITATION FROM ORIGINAL APPLICATION ENTERED—
Aug 2, 2018REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance