Drawing for Serial No. 79238194

USPTO serial 79238194

Serial No. 79238194

Reviewed by CopyMark Law Group

Reg. 5790528Status 709
Filing date
Status date
Registration date
Jul 2, 2019
Examiner
ALLEN, BIANCA LEIGH
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with Serial No. 79238194?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Bradley M. Stohry

Bradley M. Stohry Reichel Stohry Dean LLP525 S. Meridian St., Suite 1A2Indianapolis, IN 46225UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Building materials of metal, including facade elements and facade construction elements of metal, namely, awnings of metal; buildings, transportable, of metal; small items of metal hardware, namely, nuts and washers; metal containers for storage or transport of goodsSECTION 71 - CANCELLED
007Electricity generators; generators of electricity, in particular, solar-powered electricity generators; wind-powered electricity generators, wind turbines, and wind-powered electricity generators in the nature of wind farms; turbines, not for land vehicles, in particular, vertical axis turbines, horizontal axis turbines; turbines, not for land vehicles, for power generation; pumps for machines, in particular, solar-powered pumps, compressed air pumps, water pumps; machines, motors and gears, other than for land vehicles, for orientating solar panels; parts, components and fittings for electric generators and turbines for generating electricity, in particular, towers for the transmission of electricity, masts for the transmission of electricity, bearing housings for machines, casings for machines, protective cowlings, being parts of machines, transmission shafts other than for land vehicles, universal joints being parts of machines, transmissions for machines, clutches other than for land vehiclesSECTION 71 - CANCELLED
009Computer firmware and software for operating system programs for electricity generating apparatus and machines; computer hardware, in particular, data processing and data communication apparatus for use with electricity generating apparatus and machines; blank electronic, digital, optical and magnetic storage media; electronic control and management apparatus, in particular for managing the collection and use of energy, namely, electronic control devices for energy management; electronic apparatus and sensors, in particular for measuring luminescence, frequency, inclination, upward gradient, downward gradient, acceleration, vibration, position, height, magnetic flux density and consumption; apparatus and sensors for automatic solar tracking; solar power plants; apparatus for converting solar radiation to electricity, in particular, photovoltaic solar modules, solar panels for producing electricity, solar energy collectors for generating electricity, solar cells, solar batteries, inverters; spectroscopes; apparatus, electric accumulators and batteries, all for storage of solar radiation that has been converted to electrical energySECTION 71 - CANCELLED
011Solar thermal-based power plants; solar thermal modules for heating; lightning installations; metered valves for water supply; horticultural and agricultural irrigation units; drip irrigation systems comprised of valves, filters, hoses and pipes; irrigation fittings, namely, drip irrigation emitters; water jets for use in horticultural and agricultural irrigation unitsSECTION 71 - CANCELLED
017Rubber, unprocessed and semi-processed, namely, raw and semi-worked rubber; gutta-percha, unprocessed and semi-processed; rubber substitutes, namely, silicone rubber, unprocessed and semi-processed; plastic substances, semi-processed; stopping materials, namely, packing and insulating material for forming seals; flexible pipes, flexible tubes, and fittings for flexible pipes, all not of metal, including perforated tubes in a gridSECTION 71 - CANCELLED
019Building materials, not of metal, including facade elements and facade construction elements, not of metal, namely, non-metal facade panels for construction purposes; non-metallic rigid pipes for building and construction purposes; non-metallic transportable buildingsSECTION 71 - CANCELLED
037Erection, installation, servicing, maintenance and repair of wind-powered electricity generators, wind power plants and wind turbines; erection, installation, servicing, maintenance and repair of control systems for power generation systems, none of the foregoing including computer software; erection, installation, servicing, maintenance and repair of solar power plants, solar power generation systems, solar power collection systems, turbines for power generation, vertical axis turbines, vertical axis machines, horizontal axis turbines, horizontal axis machines, solar powered systems, solar power propulsion systems except for land vehicles, solar powered machines, solar powered turbines, solar thermal installations, wind-powered electricity generators, wind turbines, wind-powered installations for generating electricity in the nature of wind farms as well as parts, components and fittings therefor, none of the forgoing including computer software; consultancy and information relating to all the aforesaid servicesSECTION 71 - CANCELLED
040Production of electricity from renewable sources; custom manufacture of power plants, power generation systems, solar power collection systems, turbines for power generation, vertical axis turbines, vertical axis machines, horizontal axis turbines, horizontal axis machines, solar powered systems, solar power propulsion systems except for land vehicles, solar powered machines, solar powered turbines, solar thermal installations, wind-powered electricity generators, wind turbines, wind-powered installations for generating electricity in the nature of wind farms as well as parts, components and fittings therefor, based on customer's order and specifications; consultancy and information relating to all the aforesaid servicesSECTION 71 - CANCELLED
042Design and development and scientific research, testing and analysis and technological services relating to power plants, power generation systems, power collection systems, turbines for power generation, vertical axis turbines, vertical axis machines, horizontal axis turbines, horizontal axis machines, solar powered systems, solar power propulsion systems except for land vehicles, solar powered machines, solar powered turbines, solar thermal installations, wind-powered electricity generators, wind turbines, wind-powered installations for generating electricity in the nature of wind farms as well as parts, components and fittings therefor; electronic data storage; development of data storage systems; server hosting; computer software development, programming and implementation; development of systems for the storage of data; installation, maintenance and updating of computer softwareSECTION 71 - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 16, 2026INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED
Jan 16, 2026C71TCANCELLED SECTION 71
Jul 2, 2024REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
Jul 2, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED
Jun 22, 2023TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Jun 22, 2023ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 22, 2023REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Jun 22, 2023CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED
Jun 22, 2023COARTEAS CHANGE OF OWNER ADDRESS RECEIVED
Apr 22, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED
Nov 1, 2019FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Oct 11, 2019FICSFINAL DISPOSITION NOTICE SENT TO IB
Oct 11, 2019FIMPFINAL DISPOSITION PROCESSED
Oct 2, 2019FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Jul 2, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 16, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Apr 16, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 27, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Feb 28, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Feb 21, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Feb 21, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Feb 21, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 14, 2019ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 14, 2019REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Oct 18, 2018NREPNEW REPRESENTATIVE AT IB RECEIVED
Sep 29, 2018RFNTREFUSAL PROCESSED BY IB
Sep 7, 2018RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Sep 6, 2018RFRRREFUSAL PROCESSED BY MPU
Aug 21, 2018RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Aug 20, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 17, 2018MAFRAPPLICATION FILING RECEIPT MAILED
Aug 13, 2018DOCKASSIGNED TO EXAMINER
Aug 13, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Aug 9, 2018REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance