Drawing for DIAP

USPTO serial 79238370

DIAP

Reviewed by CopyMark Law Group

Reg. 5929112Status 709
Filing date
Status date
Registration date
Dec 10, 2019
Examiner
PEREZ, STEVEN M
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with DIAP?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Eric T. Fingerhut

Eric T. Fingerhut Dykema Gossett PLLC1301 K Street, N.W.Suite 1100 WestWashington, DC 20005

Goods and services

ClassDescriptionStatusFirst use
009Computer hardware; computer software for collecting industrial production data and monitoring, analyzing, managing and visualization of such collected data; cloud computer servers and cloud-computing software for collecting industrial production data and monitoring, analyzing, managing and visualization of such collected data; programmable logic controllers(PLC) and programmable electronic controllers for electronic recorders used to store data and provide access to such data; electric contacts, power supplies, electronic circuits, power cables, electronic sensor cables, thermostats, electric or electronic sensors for measuring production yields, quality performance and temperature, vibration, humidity, wireless transmitters and receivers, electrical transducers, timers; parts and fittings for programmable electronic controllers, namely, electric contacts, power supplies, electronic circuits, power cables, electronic sensor cables, thermostats, electric or electronic sensors for measuring production yields, quality performance and temperature, vibration, humidity; wireless transmitters and receivers, electrical transducers, timers; apparatus for transmission of communicationSECTION 71 - CANCELLED—
035Collection of data for others for business purposes; compilation and systemization of information, including production data, into computer databasesSECTION 71 - CANCELLED—
037Installation, maintenance and repair of computer hardware, cloud computer servers, apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, programmable logic controllers (PLC) and programmable electronic controllers, electric contacts, power supplies, electronic circuits, power cables, sensor cables, thermostats, electronic sensors and detectors, wireless transmitters and receivers, electrical transducers, timers, electronic display screens, electronic control panels for control of electronic systems and for control of programmable electronic controllers, and communications apparatusSECTION 71 - CANCELLED—
038Leasing and rental of telecommunications facilities and equipment; providing access to databases; electronic transmission of data from production equipment via communications networks, including data from sensors, programmable logic controllers (PLC) and programmable electronic controllersSECTION 71 - CANCELLED—
042Design, development, installation, maintenance, repair and updating of computer software, including design and development of controllers for access and use of cloud computer networks; cloud computing featuring software for collecting industrial production data and monitoring, analyzing, managing and visualization of such collected data; providing virtual computer systems through cloud computing, computer services, namely, providing infrastructure as a service (IAAS) services featuring computer software for collecting industrial production data and monitoring, analyzing, managing and visualization of such collected data; computer technology consulting in the field of cloud computing networks and applications; programming of operating software for accessing and using a cloud computing network; providing temporary use of on-line non-downloadable operating software for accessing and using a cloud computing network; rental of operating software for accessing and using a cloud computing network; providing temporary use of on-line non-downloadable operating software for access and use of cloud computer networks; installation and maintenance of database software; technical consultancy services relating to installation and maintenance computer software; rental of electronic memory space on the Internet, namely, electronic data storage; rental of memory space on serversSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 26, 2026C71TCANCELLED SECTION 71—
Mar 7, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED—
Dec 10, 2024REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Apr 17, 2020FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 26, 2020FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 26, 2020FIMPFINAL DISPOSITION PROCESSED—
Mar 10, 2020FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Dec 10, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 24, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 24, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 20, 2019GPNXNOTIFICATION PROCESSED BY IB—
Sep 4, 2019OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Sep 4, 2019OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Sep 4, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 16, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 16, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 16, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 14, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 7, 2019GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 7, 2019GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 7, 2019CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 5, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 5, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 28, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 27, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 27, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 27, 2019ALIEASSIGNED TO LIE—
Feb 22, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 21, 2018RFNTREFUSAL PROCESSED BY IB—
Sep 6, 2018RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 6, 2018RFRRREFUSAL PROCESSED BY MPU—
Aug 25, 2018RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 24, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 18, 2018MAFRAPPLICATION FILING RECEIPT MAILED—
Aug 14, 2018DOCKASSIGNED TO EXAMINER—
Aug 14, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 9, 2018REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance