USPTO serial 79238652
EQUO VIVO
Reviewed by CopyMark Law Group
Reg. 5910968Status 709
- Filing date
- Status date
- Registration date
- Nov 19, 2019
- Examiner
- LEE, JEANIE H
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with EQUO VIVO?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jason Zedeck
Jason Zedeck Law Office of Jason ZedeckPO Box 35210Los Angeles, CA 90035-0210UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Construction management in the nature of supervision, namely, management of construction work; construction of public works, earth moving in the nature of excavation services, road paving, demolition of buildings, quarrying services, mining extraction, installation and repair of irrigation devices, masonry services; concrete services, namely, construction of small structures of concrete, building reinforcing of concrete and masonry, plastering; cleaning of buildings and building coverings; installation, construction and repair of buildings and other structures in the nature of bridges, fish passes being fish ladders and above-ground and underground river structures that guarantees the continuity of the passage of fish and sediments, biological corridors, bypass rivers being above-ground and underground river structures that guarantees the continuity of the passage of fish and sediments, hydraulic works, namely, laying of pipes, construction of basins, river redevelopment work being ecosystem restoration work, namely, excavation in the nature of earthmoving and restructuring of banks; sanitation and irrigation ditches; construction of permanent structures in the nature of buildings, especially with a view to preserving biodiversity and sustainable development, information relating to building construction; masonry; asbestos removal; construction consultancy; construction consulting | SECTION 71 - CANCELLED | — |
| 040 | Decontamination of hazardous materials; production of energy; transformation, namely, waste treatment; transformation, namely, sorting of waste and recyclable raw material; recycling of trash and waste; water treatment services; draining and sanitation works, namely, waste water treatment services | SECTION 71 - CANCELLED | — |
| 042 | Engineering; expert appraisals being engineering work services; consulting for conducting work in an approach to preserve biodiversity and sustainable development, namely, consulting services in the field of environmental assessment and planning; technical project studies, namely, inventory of fauna and flora, analysis of habitats of animal species being wild animals, insects and plants; technical project studies in the field of public works and real estate construction, namely, research on building construction or city planning; surveying; engineering services in the field of construction; analysis and appraisals in industrial and civil engineering, namely, consulting in the field of industrial and civil engineering; engineering services, expertise and advice in the field of technical solutions for energy transition in new and renovated buildings, namely, technical consultation in the field of environmental science; construction drafting; engineer's services for expert appraisals in public works and civil engineering, namely, consulting in the field of civil engineering; technical study offices, namely, research in the field of design of habitats for fauna and flora; technical consultancy in the area of public works, namely, consulting in the field of civil engineering; civil engineering work performed by engineers; technical services in the nature of scientific research in the field of ecology and sustainable development; research in connection with environmental protection and related consulting; providing technology information in the field of eco-innovations and environmentally-friendly innovations | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by VINCI CONSTRUCTION TERRASSEMENT
- Other trademarks owned by VINCI CONSTRUCTION TERRASSEMENT
- Other trademarks owned by VINCI CONSTRUCTION TERRASSEMENT
- Other trademarks owned by Terélian
- Other trademarks in Class 037
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named EQUO VIVO
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 5, 2026 | C71T | CANCELLED SECTION 71 | — |
| Nov 19, 2024 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Aug 30, 2024 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Aug 30, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Mar 27, 2020 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Mar 11, 2020 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Mar 11, 2020 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Feb 19, 2020 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Nov 19, 2019 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 3, 2019 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 3, 2019 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 30, 2019 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Aug 14, 2019 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Aug 14, 2019 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Aug 14, 2019 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 26, 2019 | ALIE | ASSIGNED TO LIE | — |
| Jul 17, 2019 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 17, 2019 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jul 17, 2019 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jul 17, 2019 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jul 17, 2019 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Mar 22, 2019 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Mar 22, 2019 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Mar 22, 2019 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Feb 28, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 27, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 27, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 29, 2018 | RFNT | REFUSAL PROCESSED BY IB | — |
| Sep 8, 2018 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Sep 8, 2018 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Aug 28, 2018 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Aug 27, 2018 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 24, 2018 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Aug 20, 2018 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 20, 2018 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 16, 2018 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |