Drawing for Serial No. 79238940

USPTO serial 79238940

Serial No. 79238940

Reviewed by CopyMark Law Group

Reg. 5759973Status 709
Filing date
Status date
Registration date
May 28, 2019
Examiner
EUBANK, REBECCA A
Law office
POST REGISTRATION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with Serial No. 79238940?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
006Fittings of metal for compressed air lines; industrial water tanks of metal, liquefied natural gas tanks of metal; reservoirs of metal; Bottles being containers of metal for compressed gas or liquid air; preserving boxes of metal; Preserve tins of metal, sold empty; Tin cans, sold empty; casks of metal; barrels of metal; silos of metal; Prefabricated metal house assembly kits; chimneys of metal; containers of metal for storing acids; iron slabs; Portable skating rink structures, of metal; elbows of metal for pipes; manifolds of metal for pipelines; prefabricated buildings of metal; buildings, transportable, of metal; Steel frames for building; masts of metal; pipe muffs of metal; Props of metal being metal pipe supports; branching pipes of metal; platforms, prefabricated, of metal; collars of metal for fastening pipes; floating docks of metal, for mooring boats; containers of metal for liquid fuel; Floating containers of metal for liquid fuel; junctions of metal for pipes; posts of metal; pipework of metal; pipes of metal; tubes of metal; steel pipes; steel tubes; Flanges of metal, namely, pipe collarsSECTION 71 - CANCELLED—
007Oil-well and gas pumping machines, oil refining machines and machine tools for mining gas and oil; engines, other than for land vehicles; machine coupling and transmission components, except for land vehicles; Agricultural machines, namely, cultivators, harvestors, disk harrows, and seeders, other than hand-operated; incubators for eggs; drums being parts of machines; Machine parts, namely, rolling mill cylinders; Machine parts, namely, shaft holders for machine cutting toolsSECTION 71 - CANCELLED—
019Non-metallic building materials, namely, plastic pipe supports, concrete pipes, and ridged pipes, not of metal; Non-metallic rigid pipes for construction purposes; asphalt, pitch and bitumen; buildings, transportable, not of metal; monuments, not of metal; concrete penstock pipes, not of metal; drain pipes, not of metal; ducts, not of metal, for ventilating and air-conditioning installations; chimneys, not of metalSECTION 71 - CANCELLED—
037Pipeline construction; Pipeline repair; Pipeline installation servicesSECTION 71 - CANCELLED—
039Transport of liquefied petroleum gas and oil by freight ship, and by pipeline; Packaging articles for transportation and storage of liquefied petroleum gas; Travel arrangement, namely, arranging transport for travelers; parcel delivery; car rental; vehicle rental; rental of vehicle roof racks; chauffeur services; Transportation services, namely, hazardous waste transportation services, air transportation services for cargo; freight forwarding * ; delivery of goods by ship *SECTION 71 - CANCELLED—
040Treatment of materials by means of laser beams and cryogenic processing; metal casting; metal treatment; soldering; recycling of waste; metal plating; custom steel rolling and fabrication to the order and specification of others; blacksmithing; custom assembling of materials in the nature of gas turbine and parts, and power generation engine parts for others; Sorting and transformation of waste and recyclable materials; Millworking; galvanizingSECTION 71 - CANCELLED—
042Scientific and technological services, namely, research and design in the field of oil and gas distribution and oil and gas pipelines; industrial analysis and research services in the field of industrial pipe manufacturing and oil and gas distribution; design and development of computer hardware and software; Conducting technical project studies, namely, scientific testing of oil deposits and pipe materials; engineering; Installation of computer software and internet access software; testing of materials; mechanical research; chemical research; research and development of new products for others; Technical research in the field of oil and gas production; Calibration services in the nature of measuring; Quality control for others; updating of computer software; maintenance of computer software; surveying [ ; delivery of goods by ship ]SECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 12, 2026INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Dec 12, 2025C71TCANCELLED SECTION 71—
May 28, 2024REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Aug 12, 2020INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE—
Jul 4, 2020INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Nov 15, 2019FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Nov 4, 2019CORRCORRECTION FROM IB ENTERED - NO REVIEW REQUIRED—
Nov 4, 2019COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Nov 4, 2019PLGLASSIGNED TO PARALEGAL—
Sep 14, 2019XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Sep 14, 2019XXCRGENERIC MADRID TRANSACTION CREATED—
Aug 28, 2019FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jul 18, 2019RINXUSPTO CORRECTION PROCESSED BY IB—
Jul 18, 2019CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
May 28, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 23, 2019CRSNCORRECTION SENT TO IB—
Apr 23, 2019CRCRCORRECTION CREATED FOR IB—
Mar 12, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 12, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 8, 2019GPNXNOTIFICATION PROCESSED BY IB—
Feb 20, 2019OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Feb 20, 2019OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Feb 20, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 1, 2019ALIEASSIGNED TO LIE—
Jan 17, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 17, 2019XAECEXAMINER'S AMENDMENT ENTERED—
Jan 17, 2019GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jan 17, 2019GNEAEXAMINERS AMENDMENT E-MAILED—
Jan 17, 2019CNEAEXAMINERS AMENDMENT -WRITTEN—
Jan 3, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 2, 2019TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jan 2, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 2, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 29, 2018RFNTREFUSAL PROCESSED BY IB—
Sep 7, 2018RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 6, 2018RFRRREFUSAL PROCESSED BY MPU—
Aug 25, 2018RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 25, 2018MAFRAPPLICATION FILING RECEIPT MAILED—
Aug 24, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 21, 2018DOCKASSIGNED TO EXAMINER—
Aug 21, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 16, 2018REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance