Drawing for PUKATTO

USPTO serial 79239087

PUKATTO

Reviewed by CopyMark Law Group

Reg. 5809177Status 709
Filing date
Status date
Registration date
Jul 23, 2019
Examiner
CHOE, JULIE H
Law office
PETITIONS OFFICE

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with PUKATTO?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Laura K. Pitts

Laura K. Pitts Buchanan Ingersoll & Rooney PC1737 King StreetSuite 500Alexandria, VA 22314-2727

Goods and services

ClassDescriptionStatusFirst use
009Water floatation solar system for power generation consisting of solar panels, solar panel stands, polyethylene floats and their connection parts; water floatation system assemblies for solar power generation consisting of solar panels, solar panel stands, polyethylene floats and their connection parts; floatation system for solar power generation comprising solar panels, solar panel stands, polyethylene floats, binding bands, and their connection parts, sold as a unit; solar panels for the production of electricity; floating photovoltaic solar panel arrays and the components for the same for the production of electricity; solar cells; floating solar rack system specially designed to hold solar panels for the generation of electricity; floating stands specially adapted for solar panels for solar power generation and the production of energy; stands specially adapted for solar panels for solar power generation and the production of energy; floating stands specially adapted for photovoltaic installations for generating electricity; stands specially adapted for photovoltaic installations for generating electricity; floating stands specially adapted for solar cells; stands specially adapted for solar cells; floats made of polyethylene specially adapted for floating solar panels for solar power generation and the production of energy on waterborne locations; floats made of polyethylene specially adapted for floating photovoltaic installations for generating electricity on waterborne locations; floats made of polyethylene specially adapted for floating solar cells on waterborne locations; photovoltaic cells and modules for floating photovoltaic power plants; photovoltaic cells and modules for photovoltaic power plants on waterSECTION 71 - CANCELLED—
019Floating stands, prefabricated, for loading solar panels, not of metal; stands, prefabricated, for loading solar panels, not of metal; floating stands, prefabricated, for loading photovoltaic installations for generating electricity, not of metal; stands, prefabricated, for loading photovoltaic installations for generating electricity, not of metal; floating stands, prefabricated, for loading solar cells, not of metal; stands, prefabricated, for loading solar cells, not of metal; polyethylene floats, prefabricated, for floating solar panels on waterborne locations, not of metal; polyethylene floats, prefabricated, for floating photovoltaic installations for generating electricity on waterborne locations, not of metal; polyethylene floats, prefabricated, for floating solar cells on waterborne locations, not of metal; polyethylene floats, prefabricated, not of metal; prefabricated buildings, not of metal; ceramic construction materials, namely, bricks, refractory construction materials not of metal; construction materials made of plastic, namely, plastic wallboards; synthetic construction materials, namely, synthetic flooring materials; asphalt and asphalt felt for building and construction; rubber materials for building and construction, namely, rubber cove bases; plaster; materials made of lime for building and construction; gypsum materials for building and construction; cement and cement mixes; moulds for forming cement products, not of metal, namely, cement posts; greenhouse, transportable for household purposes, not of metal; non-metal structures for constructing floating solar panels; non-metal structures for constructing floating photovoltaic installations; non-metal building materials, namely, fiberglass panels and plastic pipe supports, for constructing floating solar panel arraysSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 6, 2026INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Feb 6, 2026C71TCANCELLED SECTION 71—
Jul 23, 2024REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Dec 1, 2019FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Nov 8, 2019FICSFINAL DISPOSITION NOTICE SENT TO IB—
Nov 8, 2019FIMPFINAL DISPOSITION PROCESSED—
Oct 23, 2019FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Oct 22, 2019CORRCORRECTION FROM IB ENTERED - NO REVIEW REQUIRED—
Aug 23, 2019CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Jul 23, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 14, 2019CHPBPOST PUBLICATION AMENDMENT - ENTERED—
Jun 13, 2019APETASSIGNED TO PETITION STAFF—
May 22, 2019EPPATEAS POST PUBLICATION AMENDMENT RECEIVED—
May 7, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 7, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 3, 2019GPNXNOTIFICATION PROCESSED BY IB—
Apr 17, 2019OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 17, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 17, 2019OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Mar 26, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 25, 2019XAECEXAMINER'S AMENDMENT ENTERED—
Mar 25, 2019GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Mar 25, 2019GNEAEXAMINERS AMENDMENT E-MAILED—
Mar 25, 2019CNEAEXAMINERS AMENDMENT -WRITTEN—
Mar 21, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 20, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 20, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 18, 2019CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 17, 2019CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 4, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 3, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 3, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 29, 2018RFNTREFUSAL PROCESSED BY IB—
Sep 10, 2018RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 10, 2018RFRRREFUSAL PROCESSED BY MPU—
Aug 31, 2018RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 30, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 28, 2018MAFRAPPLICATION FILING RECEIPT MAILED—
Aug 24, 2018DOCKASSIGNED TO EXAMINER—
Aug 24, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 23, 2018REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance