Drawing for PARKD

USPTO serial 79239326

PARKD

Reviewed by CopyMark Law Group

Reg. 5841637Status 709
Filing date
Status date
Registration date
Aug 27, 2019
Examiner
GUROK, GALINA
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with PARKD?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

John W. Greenwald

John W. Greenwald Perilla Knox & Hildebrandt LLP5871 Glenridge DriveSuite 350Atlanta, GA 30328

Goods and services

ClassDescriptionStatusFirst use
006Metallic building materials, namely, garage doors, reinforcing materials, awnings, facades, crash barriers and components and parts therefor; metallic building structures, namely garage doors, reinforcing materials, awnings, facades, crash barriers; transportable metallic constructions, namely modular structural metal components and elements, lifting frames, temporary supports, scaffolds, crash barriers, façade structures, structural columns, support beams, and composite slab joists; metallic buildings, namely prefabricated buildings made substantially of metal; portable buildings of metalSECTION 71 - CANCELLED—
009Computer software for use in the transaction of parking fees; computer software for use as a tool to identify available parking spaces; computer software for use as a tool to direct users to locations; application software for mobile phones and portable electronic devices, namely, software for use in the transaction of parking fees and for use as a tool to identify available parking spaces or to direct users to locations; downloadable software applications in the name of mobile apps for use in the transaction of parking fees and for use as a tool to identify available parking spaces or to direct users to locationsSECTION 71 - CANCELLED—
019Non-metallic building materials, namely structural concrete and/or timber and/or carbon fiber members for columns, bracing, facades, crash barriers and beams and components and parts therefor; non-metallic composite materials, namely structural concrete and/or timber and/or carbon fiber members for columns, bracing, facades, crash barriers and beams for use in building; non-metallic building structures, namely structural concrete and/or timber and/or carbon fiber members for columns, bracing, facades, crash barriers and beams; transportable non-metallic constructions, namely structural concrete and/or timber and/or carbon fiber members for columns, bracing, facades, crash barriers and beams; non-metallic buildings, namely structural concrete and/or timber and/or carbon fiber members for columns, bracing, facades, crash barriers and beamsSECTION 71 - CANCELLED—
036Real estate brokerage services, namely, sale of industrial and commercial real estate and property; commercial property investment services; real estate investment management; venture capital fund management; capital investment in real estate; acquiring and managing real estate for investorsSECTION 71 - CANCELLED—
037Construction services, namely, planning, layout and custom construction of commercial buildings, advisory services relating to building construction, construction methodology, construction modelling, craneage, rigging and lifting, concreting, site supervision, construction management and construction inspection; building construction services; installation services, namely, installation of elevators, lifts, building scaffolds, lights, gutters, concrete works, fit out works, parking systems, façade, solar panel and solar energy systems and electric vehicle charging stations; repair services, namely, repair of doors, buildings, garages, parking systems and power charging units; repair of buildings, namely, concrete repair services, namely, structural strengthening; repair of buildings, namely, structural steel repair; maintenance services, namely, maintenance of doors, buildings, garages, parking systems, power charging units, structural fabric, façade systems and lifts; building construction project management in the field of commercial buildings and car parking facilitiesSECTION 71 - CANCELLED—
042Design services, namely industrial and engineering design services, architectural design services; structural engineering design services in the field of planning of commercial structures; engineering services in the field of industrial engineering, structural engineering, traffic engineering and service engineering; engineering project management servicesSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 13, 2026INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Mar 13, 2026C71TCANCELLED SECTION 71—
Aug 27, 2024REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Mar 19, 2024TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Mar 19, 2024ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 19, 2024REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Mar 19, 2024CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Mar 19, 2024COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Jan 10, 2020FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Dec 20, 2019FICSFINAL DISPOSITION NOTICE SENT TO IB—
Dec 20, 2019FIMPFINAL DISPOSITION PROCESSED—
Nov 27, 2019FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Nov 21, 2019ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Aug 27, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 11, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jun 11, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 7, 2019GPNXNOTIFICATION PROCESSED BY IB—
May 22, 2019OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
May 22, 2019OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
May 22, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 29, 2019ALIEASSIGNED TO LIE—
Apr 17, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 17, 2019XAECEXAMINER'S AMENDMENT ENTERED—
Apr 17, 2019GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Apr 17, 2019GNEAEXAMINERS AMENDMENT E-MAILED—
Apr 17, 2019CNEAEXAMINERS AMENDMENT -WRITTEN—
Mar 27, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 26, 2019TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Mar 26, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 26, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 19, 2018RFNTREFUSAL PROCESSED BY IB—
Sep 28, 2018RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 28, 2018RFRRREFUSAL PROCESSED BY MPU—
Sep 26, 2018RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 25, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 24, 2018DOCKASSIGNED TO EXAMINER—
Aug 28, 2018MAFRAPPLICATION FILING RECEIPT MAILED—
Aug 24, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 23, 2018REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance