Drawing for NOELL

USPTO serial 79240210

NOELL

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
Examiner
COUGHLAN, REBECCA D.
Law office
TMO LAW OFFICE 113 - EXAMINING ATTORNEY ASSIGNED

What this means

These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.

Status 602: These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances.

Need help with NOELL?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jason P. Mueller

Jason P. Mueller Adams and Reese LLP628 Julia StreetNew Orleans, LA 70130UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Windows of metal with lead glass panes for protection against irradiation; barrels and casks of metal for collecting waste; tanks and insulating containers of metal, for containment and storage; double-lid air locks of metal; pipes and tubes of metal and pipeline systems consisting thereof; coated pipes of metal protected against corrosion and erosion; membrane walls of metal; containers of metal, for containment and storage; the aforesaid goods being for power plants, waste incineration installations and industrial installations; components for nuclear reactors, namely, containment vessels for materials, air locks, exchanging machines for exchange of materials, tank-linings, gates, doors and shielding, all of the foregoing made of metal; metal spherical containers for liquid and gaseous media and metal pressurised containers, for containment and storage of liquid and gaseous media; prefabricated hangar parts and building parts in the form of frames of steel beams and profiled metal sheet linings, including in combination with connecting elements consisting of a large number of different materials, for manufacturing multi-story buildings, power plants, warehouses and hangar structures; parts for hydraulic engineering purposes, namely, sluice gates, metal fish-belly flap gate, bottom outlet elements, namely, metal pipes and valves of metal, and metal non-return flap valves; transport containers and storage containers of metal for radioactive substances and objects; accessories and replacement parts for storage containers and transport containers for radioactive substances and objects, namely, closures, valves, linings, pipes, connecting elements, and tubes for containersACTIVE
007Machines, namely, waste compacting machines, machine tools, namely, machine tools for removal, disposal, or storage of waste material, conveyors as parts of machines, power-operated elevating or lifting equipment, jacks [machines], cargo handling machines, automatic manipulators for foregoing machines, industrial and robotic presses; electric soldering apparatus; power-operated machines, mechanical apparatus, equipment and installations for handling, lifting and lowering piece goods, in particular containers; cranes; bridge cranes; gantry cranes; power-operated machines and devices for handling and transporting containers with radioactive substances and objects; power-operated machines and mechanical apparatus for crushing fuels and raw materials; conveying installations, namely, conveyors as machines, blowing machines; dust removing installations for cleaning purposes; current generators; compressors for machines; turbines, namely, steam and gas turbines (not for land vehicles); steam condensers; pumps as parts of machines; electrotechnical and process control installations consisting of control units for machines and motors or engines for operating power plant installations, waste incineration installations and individual components therefor; all of the aforesaid goods in the field of restructuring and dismantling of power plants; automatic raking machines for cleaningACTIVE
011Unit heaters for chemical and scientific purposes; steam generating apparatus, namely, steamers for chemical processing; heating installations and steam generators; the aforesaid goods being intended for power plant technology installations and filing technology installations, consisting of heat exchangers, burners, non-automatic separators for steam heating installations, furnaces, hot gas generators, filters (parts of industrial installations), waste heat boilers and preheaters; rotary air preheaters; heating elements; heating boilers, gas condensers, other than as parts of machines; refrigerating installations; refrigerators; nuclear reactors; air-conditioning fans; parts for the aforesaid firing technology machines and installations for solid, liquid, and gaseous fuels burner valves; preheating apparatus, namely, hot air preheaters; gas reduction apparatus, namely, sublimation apparatus; combination oil and gas burners or gas surface burners for industrial use; flue gas purification machines and components therefor as used for chemical and scientific purposes; water treatment installations and wastewater treatment installations; water conditioning installations and wastewater conditioning installations and parts therefor for clarifying wastewaterACTIVE
037Installation, maintenance and repair of nuclear installations and machines therefor; installation and deinstallation of fuel elements, namely, fuel gauges, fuel pumps; dismantling of nuclear installations; assembly and disassembly services of components or complete installations and components therefor, namely, steam generators, pipelines and steel construction, firing installations, heat recovery systems, ash removal systems, installations and machines for pulverising coal; maintenance and servicing of storage and transport containers for radioactive materials and objects; repair of storage and transport containers for radioactive materials and objects; rebuilding of nuclear installations; construction of buildings for conditioning irradiated fuel elements for direct final storage, construction of temporary storage units for temporary storage of irradiated fuel elementsACTIVE
039Conducting of specialised transport in nuclear installations, namely, transport of waste and recycling materials; packaging, transport and storage of waste and recycling materials; transportation of radioactive materials and objects, transportation of radioactive materials and objects by way of land vehicles, rail vehicles or ships; storage of radioactive materials or objects; rental of storage and transport containers for radioactive materials or objects; operation of warehouses for testing and storage of radioactive materials and objects; temporary storage of radioactive waste and irradiated fuel elementsACTIVE
042Technological services, namely, technological consulting services in the field of technical planning, technical evaluation, construction drafting, technical inspection of components or complete installations of treatment systems, namely, steam generators, pipelines and steel construction, power plant installations, firing installations, heat recovery systems, ash removal systems, installations and machines for pulverising coal, water treatment installations in the context of set-up and trial operations; remote monitoring services in the nature of maintenance of complete installations and components therefor, namely, steam generators, pipelines and steel construction, power plant installations, firing installations, heat recovery systems, ash removal systems, installations and machines for pulverising coal, water treatment installations and technical development services, in particular for process optimisation and industrial analysis, in particular for power plant installations, waste incineration installations and industrial installations; inspection of reactors for optimisation and industrial analysis; technical consultancy relating to nuclear technology, magnet technology and environmental technology; technological project planning and surveying in the field of nuclear technology, magnet technology and environmental technology; design of super-conductive magnets and magnet systems for others; construction planning of fixed and mobile installations for treating radioactive waste, construction planning of fixed and mobile installations for treating liquid and solid radioactive waste in nuclear facilities, construction planning of waste packaging and transport containers; construction planning of temporary storage and construction planning of temporary storage for radioactive waste; technological project management in connection with the decommissioning of nuclear installations; examination and technical planning, namely, technological planning and consulting in the field of decommissioning measures of scientific facilities; construction planning of temporary storage for irradiated fuelACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 4, 2022FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Mar 27, 2022RINXUSPTO CORRECTION PROCESSED BY IB
Feb 22, 2022IRRHIRREGULARITY FROM IB EXAMINED BY MPU
Feb 22, 2022LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED
Feb 21, 2022IRFIIRREGULARITY ON FINAL DECISION RECEIVED FROM IB
Feb 1, 2022FICSFINAL DISPOSITION NOTICE SENT TO IB
Feb 1, 2022FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
May 16, 2021FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Mar 8, 2021LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED
Feb 1, 2021MAB2ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Feb 1, 2021ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Jan 22, 2021LIMGLIMITATION OF GOODS RECEIVED FROM IB
Aug 29, 2020OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Jul 21, 2020GNFNNOTIFICATION OF FINAL REFUSAL EMAILED
Jul 21, 2020GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jul 21, 2020CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Mar 10, 2020CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED
Mar 10, 2020TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Mar 10, 2020ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 10, 2020REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Mar 10, 2020COARTEAS CHANGE OF OWNER ADDRESS RECEIVED
Feb 28, 2020OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Feb 28, 2020OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Feb 12, 2020OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Feb 12, 2020OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Jan 17, 2020LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED
Dec 30, 2019GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
Dec 30, 2019GNSLLETTER OF SUSPENSION E-MAILED
Dec 30, 2019CNSLSUSPENSION LETTER WRITTEN
Dec 26, 2019ALIEASSIGNED TO LIE
Sep 27, 2019LIMGLIMITATION OF GOODS RECEIVED FROM IB
Jun 8, 2019GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
Jun 8, 2019GNSLLETTER OF SUSPENSION E-MAILED
Jun 8, 2019CNSLSUSPENSION LETTER WRITTEN
May 20, 2019DPCCDIVISIONAL PROCESSING COMPLETE
May 1, 2019AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL
Mar 31, 2019ALIEASSIGNED TO LIE
Mar 26, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 26, 2019DRRRDIVISIONAL REQUEST RECEIVED
Feb 26, 2019ERTDTEAS REQUEST TO DIVIDE RECEIVED
Feb 20, 2019ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 20, 2019REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Oct 13, 2018RFNTREFUSAL PROCESSED BY IB
Sep 26, 2018RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Sep 26, 2018RFRRREFUSAL PROCESSED BY MPU
Sep 21, 2018RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Sep 20, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 18, 2018MAFRAPPLICATION FILING RECEIPT MAILED
Sep 13, 2018DOCKASSIGNED TO EXAMINER
Sep 13, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Sep 6, 2018REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance