Drawing for ROTO

USPTO serial 79240957

ROTO

Reviewed by CopyMark Law Group

Reg. 5923252Status 707Registered
Filing date
Status date
Registration date
Dec 3, 2019
Examiner
FALK, JONATHAN ROBERT
Law office
Historical data usage

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with ROTO?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

ROBERT S. BRODER

ROBERT S. BRODER COLLARD & ROE, P.C.1077 NORTHERN BLVD.ROSLYN, NY 11576United States

Goods and services

ClassDescriptionStatusFirst use
006[ Building materials of metal, namely, metal profiles; transportable buildings of metal; prefabricated roof sections and covering frames of metal; windows of metal, namely, façade windows, conservatory windows, roof windows, windows for installation in inclined surfaces, in particular residential loft windows; windows of metal for renovation purposes; sliding windows of metal; doors, not for vehicles of metal, namely, sliding doors, fire doors; gates of metal; parts of the aforesaid windows, doors and gates, namely, frames of metal, and window, door and gate leaves of metal; folding shutters of metal for windows and doors; roller shutters of metal for windows and doors; parts of the aforesaid roller shutters, namely, roller shutter housings of metal, roller shutter rails of metal, roller shutter slats of metal; roller blinds and jalousies of metal, fly screens of metal; staircases of metal, namely, spiral staircases and loft ladders; parts of the aforesaid staircases and ladders, namely, staircase banisters of metal, stair treads of metal, stair stringers of metal; fittings of metal for staircases; covers of metal for ceiling openings for ladders; building fittings of metal, namely, fittings of metal for folding shutters, roller blinds, venetian blinds and for roller shutters; ] fittings of metal for windows and doors, namely, hinge plates, hinges, corner supports, espagnolette rods, corner guides, rosettes, plates and covering caps; locking elements of metal, namely, bolts and closing pieces; door and window handles of metal; window and door knobs of metal; non-electric window closers and door closers of metal; stays of metal for window sashes and door sashes; non-electric and non-electronic locks of metal, not for vehicles, namely, [ tubular frame locks and ] mortise locks; non-electric multi-point locking mechanisms of metal, not for vehicles, namely, cylinder-operated and handle-operated multi-point locking mechanisms; [ non-electric autonomous locking mechanisms of metal not for vehicles; ] lock cylinders of metal; locking systems, not for vehicles made from non-electric and non-electronic locks of metal, non-electric multi-point locking mechanisms of metal, non-electric autonomous locking mechanisms of metal, lock cylinders of metal; force-transfer devices for opening and closing of windows and doors, namely, connectors of metal and drive rods of metal; [ rods of metal for manually operating roller blinds; railings of metal for building purposes, wall claddings of metal, fire protection gratings and screens of metal, ladders of metal, scaffolding of metal, walkways of metal, safety gratings of metal, partition walls of metal; vision screens of metal, being building material; ] ironmongery and small items of metal hardware, namely, screws of metal, [ nuts of metal, rivets of metal; ] fixing brackets of metal [ , fixing supports of metal ]ACTIVE—
019[ Non-metallic building materials, namely, timber building profiles and plastic sections for the production of window frames and door frames; glass for building purposes, namely, insulating glass for building purposes, insulating glass panes for building purposes, window glass, building glass for façades, toughened safety glass, laminated safety glass, fire-resistant, radiation protective, light-protective, acoustic and/or heat protective panes; architectural elements, namely, dome lights of glass; non-metallic transportable buildings; non-metallic prefabricated roof segments and covering frames; non-metallic windows, namely, façade windows, conservatory windows, roof windows, windows for installation in inclined surfaces, for example, residential loft windows; non-metallic windows for renovation purposes; non-metallic sliding windows not for vehicles, non-metallic sliding doors, not for vehicles; non-metallic gates; parts of non-metallic windows, non-metallic doors and non-metallic gates, namely, non-metallic frames, and non-metallic window, door and gate leaves; non-metallic folding shutters for windows and doors; outdoor roller shutters for windows and doors, not of metal and not of textile; parts of non-metallic and non-textile outdoor roller shutters for windows and doors, namely, non-metallic roller shutter housings, non-metallic roller shutter rails, non-metallic slats for external roller shutters; outdoor roller blinds and jalousies, not of metal and not of textile, non-metallic fly screens; non-metallic staircases, namely, spiral staircases and loft stairs; parts of non-metallic staircases, namely, non-metallic staircase banisters, non-metallic stair treads, non-metallic stair stringers; non-metallic covers for ceiling openings for ladders; building materials, namely, non-metallic railings for building purposes, non-metallic scaffolding, non-metallic walkways, non-metallic safety gratings, non-metallic partition walls, non-metallic vision screens ]SECTION 71 - CANCELLED—
020[ fittings of plastic for folding shutters, roller blinds, venetian blinds and for roller shutters; ] non-metallic locking elements, namely, bolts and closing pieces; door and window handles of plastic; [ non-metallic window and door knobs; ] stays of plastic for window sashes and door sashes [ ; non-electric and non-electronic locks of plastic, not for vehicles, namely, mortise locks and tubular frame locks; multi-point locking mechanisms, being door latches, non-electric, of plastic, not for vehicles, namely, cylinder-operated and handle-operated multi-point locking mechanisms; non-electric autonomous locking mechanisms, being door latches of plastic, not for vehicles; lock cylinders of plastic; locking systems, not for vehicles made from non-electric and non-electronic locks of plastic, non-electric multi-point locking mechanisms of plastic, non-electric autonomous locking mechanisms of plastic, lock cylinders of plastic; non-metallic fasteners, namely, anchors, bolts, nails, rivets and screws; non-metallic connectors and other non-metallic force transfer devices for opening and closing of windows and doors; non-metallic ladders; indoor window blinds of textile materials ]ACTIVE—
038[ transmission of screen presentations by means of computer and television; broad-casting of television and radio programmes, also via cable ]SECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 15, 2026NA15SEC. 15 ACKNOWLEDGEMENT - E-MAILED—
May 15, 202615AKREGISTERED - SEC. 15 ACKNOWLEDGED—
May 4, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Apr 15, 2026E15RTEAS SECTION 15 RECEIVED—
Mar 28, 2026NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Mar 28, 202671.PREGISTERED - PARTIAL SEC 71 ACCEPTED—
Mar 23, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Dec 2, 2025ES71TEAS SECTION 71 RECEIVED—
Dec 3, 2024REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Dec 3, 2021RNWLINTERNATIONAL REGISTRATION RENEWED—
May 8, 2020FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 20, 2020XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Mar 20, 2020XXCRGENERIC MADRID TRANSACTION CREATED—
Mar 3, 2020FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jan 30, 2020CHLDCHANGE OF OWNER RECEIVED FROM IB—
Dec 3, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 28, 2019ETOPEXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED—
May 15, 2019ETOFEXTENSION OF TIME TO OPPOSE RECEIVED—
Apr 16, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 16, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 27, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 8, 2019ALIEASSIGNED TO LIE—
Feb 15, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 31, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 30, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 30, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 28, 2018RFNTREFUSAL PROCESSED BY IB—
Dec 10, 2018RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Dec 10, 2018RFRRREFUSAL PROCESSED BY MPU—
Nov 28, 2018RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Nov 27, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 20, 2018DOCKASSIGNED TO EXAMINER—
Nov 13, 2018DOCKASSIGNED TO EXAMINER—
Sep 25, 2018MAFRAPPLICATION FILING RECEIPT MAILED—
Sep 21, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 17, 2018LIMILIMITATION FROM ORIGINAL APPLICATION ENTERED—
Sep 13, 2018SDRCSN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB—

Frequently asked questions

Related guidance